Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-97-195, Submits COLR 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5 + (ML17292B095)
- GO2-97-196, Provides Clarification on Two Points Made by Staff in Re Request for Extension of Exam Interval for IGSCC Category C Welds for Unit 2 + (ML17292B096)
- GO2-97-197, Informs NRC of Change to Plant Reactor Stability Long Term Solution from Option I-A to Option III & to Provide Update to Implementation Schedule + (ML17292B097)
- IR 05000397/1997010 + (ML17292B099)
- ML17292B100 + (ML17292B100)
- IR 05000397/1997011 + (ML17292B102)
- ML17292B103 + (ML17292B103)
- GO2-97-201, Submits 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML17292B104)
- ML17292B108 + (ML17292B108)
- GO2-97-202, Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205 + (ML17292B109)
- GO2-97-205, Monthly Operating Rept for Oct 1997 for WNP-2 + (ML17292B110)
- 05000397/LER-1997-011, :on 971010,HPCS Battery Charger Failed.Caused by Failure of a Phase Firing Control Circuit Board Due to Aging During 7 Yrs of Use.Hpcs Sys Was Immediately Declared Inoperable + (ML17292B111)
- ML17292B112 + (ML17292B112)
- ML17292B114 + (ML17292B114)
- 05000397/LER-1997-010, :on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established + (ML17292B115)
- ML17292B116 + (ML17292B116)
- ML17292B117 + (ML17292B117)
- GO2-97-210, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-16 on 970815.Corrective Actions:Additional Training for Operations Personnel Will Be Given to Review Requirements of TS Surveillance Interval + (ML17292B118)
- GO2-97-211, Informs That Util Intends to Implement Rev 26 to Operational QA Program Description,Including Clarifications Requested by NRC to App Iii.Description of Clarifications & Paragraphs Modified,Per Agreement Encl + (ML17292B119)
- GO2-97-215, Forwards Evaluation of Effect of Revised Safety Limit on Past Operations at WNP-2,in Response to Unresolved Items in Insp Rept 50-397/97-11 + (ML17292B120)
- ML17292B121 + (ML17292B121)
- ML17292B122 + (ML17292B122)
- ML17292B123 + (ML17292B123)
- ML17292B124 + (ML17292B124)
- ML17292B126 + (ML17292B126)
- ML17292B127 + (ML17292B127)
- IR 05000397/1997017 + (ML17292B129)
- GO2-97-219, Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage + (ML17292B130)
- ML17292B131 + (ML17292B131)
- ML17292B132 + (ML17292B132)
- GO2-97-218, Forwards Addl Info Requested by NRC Re Util 961015 Request for Amend to Secondary Containment & SGTS TS, in Accordance W/Schedule Provided in Util + (ML17292B133)
- GO2-97-220, Monthly Operating Rept for Nov 1997 for WNP-2 + (ML17292B134)
- ML17292B135 + (ML17292B135)
- ML17292B138 + (ML17292B138)
- GO2-97-217, Forwards Rev 27 to Operational QA Program Description (OQAPD) (WPPSS-QA-004), to Reflect Organizational Change of Relocating Supplier Quality & Receiving Insp Functions from Procurement Dept to Quality Dept + (ML17292B139)
- ML17292B140 + (ML17292B140)
- ML17292B141 + (ML17292B141)
- GO2-97-223, Provides Info in Compliance w/10CFR140.21,which Requires Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (ML17292B142)
- GO2-97-222, Ack Receipt of 971203 Transmittal of Insp Rept 50-397/96-22. Response to Subject Insp Rept Will Be Submitted on or Before 980121,as Discussed in Telcon + (ML17292B143)
- ML17292B144 + (ML17292B144)
- ML17292B146 + (ML17292B146)
- ML17292B148 + (ML17292B148)
- GO2-97-227, Forwards Hardware or Software Changes Which Affect Transmitted Data Points Identified in ERDS Data Point Library,Per 10CFR50 App E,Section VI.3a + (ML17292B169)
- GO2-97-228, Provides Amended Response to Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Portions of RCIC Sys Required to Support Reactor Vessel Inventory Makeup Will Be Reclassified as safety-related & Seismic Category I + (ML17292B173)
- GO2-97-229, Confirms That Response to 971202 RAI Re Plant Response GL 88-20,Suppl 4, IPEEE, Will Be Submitted on or Before 980330 + (ML17292B176)
- GO2-98-002, Forwards 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML17292B179)
- GO2-98-003, Informs That Testing of Whittaker fire-rated Cables Will Take Place During Week of 980302,at Stated Facility + (ML17292B182)
- GO2-98-001, Submits Commitments Made in Response to NUREG-0619,re BWR Feedwater Nozzle & CR Drive Return Line Nozzle Cracking. WNP-2 Feedwater Nozzle Insp Rept for R-12 Maintenance & Refueling Outage Attached + (ML17292B208)
- GO2-98-005, Washington Public Power Supply Sys Annual Rept for 1997 + (ML17292B212)
- GO2-98-007, Monthly Operating Rept for Dec 1997 for WNP-2 + (ML17292B215)
- ML17292B219 + (ML17292B219)