REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9711100029
DOC.DATE: 97/11/06
NOTARIZED: NO
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
UTH.NAME
AUTHOR AFFILIATION
LL,A.T.
Region
4 (Post
820201)
ECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
DOCKET
05000397
SUBJECT:
Forwards insp rept 50-397/97-11
on 970602-06.Violations
noted. One concern
was that licensee did not develop
operating
& safety limit minimum critical power ratios for
cycles 7-12
IAW methodology specified in TS references.
DISTRIBUTION CODE:
IEOIF
COPIES
RECEIVED:LTR i ENCLI
SIZE: 5 7 i$
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEO~~
ILE CENTER
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
AL: LITCO BRYCE,J H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1.
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURN,T
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
0
U
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED: LTTR
20
ENCL
20
y k*0l
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
61I RYAN PLA2A DRIVE, SuITE 400
ARLINGTON,TEXAS 7601$ 8064
November 6,
1997
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC INSPECTION REPORT 50-397/97-11
Dear Mr. Parrish:
An NRC inspection was conducted June 2-6, 1997, at your Washington Nuclear Project-2
reactor facility, with in-office inspection activities continued until October 1, 1997.
The
enclosed report presents the scope and results of that inspection.
Following the onsite portion of the inspection on June 6, 1997, our inspectors and
consultants debriefed you, and the members of your staff identified in the enclosed report.
At that time, additional information was needed to resolve certain inspection findings and
concerns.
At your request, we conducted teleconferences
with your staff on June 9 and
10, 1997.
Subsequently,
you provided additional information to the inspection team
members for in-office review.
Following the review of the additional information, a meeting
was held at NRC Headquarters
in Rockville, MD, with Mr. R. Webring and other members of
your staff, on June 23, 1997.
On September
18, 1997, the NRC initiated a telephone
conference call with members of your staff to obtain additional information for the
inspection team.
On October 1, 1997, a telephonic exit meeting was conducted with your
'taff.
Our inspection team was unable to resolve all inspection findings.
In particular, one
concern was that you had not developed operating and safety limit minimum critical power
ratios for Cycles 7-12 in accordance with methodology specified in the Technical
Specification references.
Consequently, the inspection team questioned the adequacy of
your design control measures for developing and implementing the operating and safety
limit minimum critical power ratios.
The NRC's review of the adequacy of your design
control and verification process for the determination of these license limits is an
unresolved item.
Another concern was identified on September
18, 1997, when your staff informed us that
your review of records indicated that the corrected operating limit minimum critical power
ratio had been exceeded
sometime during each of Cycles 7-12.
The NRC's evaluation of
the results of your review is an unresolved item.
'II711100029 97110b
ADOCK 050003'P7
6
llllllllllllllllllllllllllllllllllllllll
Washington Public Power Supply System
-2-
We were also informed that your staff was reviewing records to determine whether the
corrected safety limit minimum critical power ratio would have been exceeded
during
Cycles 7-12 for anticipated operational transients.
The NRC's evaluation of the results of
your review is an unresolved item.
It is our understanding that you willfinish the ongoing reviews related to these three
unresolved items and provide us with the results by November 30, 1997.
Please contact
us if this is not correct.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Arthur T. Howell tll, Director
Division of Reactor Safety
Docket No.: 50-397
License No.:
Enclosure:
NRC Inspection Report
50-397/97-1
1
cc w/enclosure:
Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. D. W. Coleman (Mail Drop.PE20)
Acting Manager, Regulatory Affairs
Washington Public Power Supply System
P,O. Box 968
Richland, Washington
99352-0968
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
~
~
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston 5 Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME':t WN711RP.JEW
To receive copy of document, indicate in box: "C" = Copy without enctosures
"E" = Copy with enctosures "N"= No copy
RIV:Rl:MB
JEWhittemore
NRR:NE
f>>
THuang
E-A~ )
NRR:NE
EDKen ric
NRRS
P
~C
CMB
LEPhillipsd Pal
DAPowers
) ".
10/03/97
10/03/97
10/03/97
10/03/97
10/H/97
D:DRP
HJWon
1Q/o$ 97
D:DRS
ATHo
I,III
1 /Q/97
OFFICIAL RECORD COPY
Washington Public Power Supply System
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
" E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R'5 WN711RP.JEW
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N"= No copy
RIV:Rl:MB
JEWhittemore
NRR:NE
f~ NRR:NE
&<
NRR S
/d
~C
C MB
THuang
E-A )
EDKen ric
@'EPhillipsd PAI
DAPowers
10/03/97
D:DRP
10/03/97
D:DRS
10/03/97
10/03/97
1084/97
HJWon
1ql/Ot)'97
ATHo
III
1 /Q/97