Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A523 + (ML17291A523)
- GO2-94-266, Informs NRC of Intent to Extend First 10-yr ISI & Test Interval for No Longer than Six Months + (ML17291A530)
- GO2-94-267, Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Effect on Cycle 11 Operation + (ML17291A531)
- ML17291A533 + (ML17291A533)
- IR 05000397/1994027 + (ML17291A534)
- ML17291A535 + (ML17291A535)
- ML17291A537 + (ML17291A537)
- GO2-94-271, Monthly Operating Rept for Nov 1994 for Nuclear Plant Unit 2 + (ML17291A541)
- 05000397/LER-1994-020, :on 941111,postulated That MCR Fire Could Induce Hot Short That Could Result in Spurious Closure of Mo Ci Valve CIA-V-20.Caused by Inadequate Analysis.Continuous Fire Watch Established for Area + (ML17291A542)
- GO2-94-275, Provides Update to Facility GL 89-10 MOV Program Status + (ML17291A543)
- GO2-94-280, Forwards Rev 0 to Second Ten-Year Interval Pump & Valve Inservice Testing Program Plan + (ML17291A544)
- ML17291A547 + (ML17291A547)
- ML17291A549 + (ML17291A549)
- ML17291A550 + (ML17291A550)
- ML17291A552 + (ML17291A552)
- ML17291A553 + (ML17291A553)
- GO2-94-281, Forwards Response to Re Violations Noted in Insp Rept 50-397/94-28.Corrective Actions:Responsibility for Protection Program Issues Was Centralized in One Organization in Spring of 1994 to Provide Better Focus + (ML17291A554)
- ML17291A556 + (ML17291A556)
- IR 05000397/1994026 + (ML17291A558)
- 05000397/LER-1994-019, :on 941121,gasket Missing from MCR Air Handler WMA-AH-51B Precludes Associated Emergency Fan WMA-FN-54B from Sufficiently Pressurizing Cr.Caused by Improper Authorization.Manager Counseled Supervisor + (ML17291A559)
- 05000397/LER-1994-021, :on 941123,holes Cut in MCR Floor Penetration 5016 Precludes Redundant Emergency Fans WMA-FN-54A(B) from Pressurizing CR Sufficiently to Meet Applicable Surveillance.Holes Resealed on 941123 + (ML17291A560)
- OI 4-2016-014, Operating Corporation - Closure of Investigation (OI 4-2016-014) + (ML17291A561)
- ML17291A564 + (ML17291A564)
- IR 05000397/1994032 + (ML17291A566)
- GO2-94-289, Submits Simulator Facility Certification, for Wpps WNP-2 Per 10CFR55.45 + (ML17291A567)
- ML17291A568 + (ML17291A568)
- ML17291A569 + (ML17291A569)
- GO2-94-287, Forwards Revs 18,19 & 20 to WPPSS-QA-004, Operational QA Program.... Revs 18 & 19 Reflect Mgt & Organizational Changes & Rev 20 Reflects Changes to Methods Used to Review Procurement Documents & Monitor Procurement Process + (ML17291A570)
- ML17291A572 + (ML17291A572)
- ML17291A573 + (ML17291A573)
- ML17291A574 + (ML17291A574)
- ML17291A575 + (ML17291A575)
- ML17291A577 + (ML17291A577)
- GO2-94-292, Forwards Updated Response to Deviations Noted in EOPs Insp Rept 50-397/91-27,satifying Commitment Made in 940425 Response to Insp Rept 50-397/94-01 + (ML17291A578)
- ML17291A580 + (ML17291A580)
- ML17291A584 + (ML17291A584)
- ML17291A585 + (ML17291A585)
- ML17291A587 + (ML17291A587)
- GO2-95-003, Monthly Operating Rept for Dec 1994 for WNP-2 + (ML17291A589)
- IR 05000397/1994028 + (ML17291A590)
- ML17291A593 + (ML17291A593)
- IR 05000397/1994031 + (ML17291A599)
- ML17291A601 + (ML17291A601)
- GO2-95-006, Provides Response to Violations Noted in Insp Rept 50-397/94-29.Corrective Actions:Timeout Held W/Mechanical & Electrical Craft Personnel to Ensure They Understood Proper Storage Requirements for Hoists + (ML17291A602)
- GO2-95-005, Provides Plans for Implementing long-term Solution to Reactor Coupled neutronic/thermal-hydraulic Stability Issue in Response to GL 94-02,Action 2 + (ML17291A603)
- ML17291A604 + (ML17291A604)
- RAIO-1017-56677, LLC Response to NRC Request for Additional Information No. 188 (Erai No. 9022) on the NuScale Design Certification Application + (ML17291A613)
- ML17291A619 + (ML17291A619)
- ML17291A620 + (ML17291A620)
- GO2-95-010, Responds to NRC Re Violations Noted in Insp Rept 50-397/94-24.Corrective actions:one-over-one Review of LCO Entry Has Been Instituted as Mgt Expectation Through End of Mar 1995 + (ML17291A621)
- GO2-95-014, Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10 + (ML17291A622)