Forwards Insp Rept 50-397/94-32 on 941030-1210.No Violations Noted
ML17291A564
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/23/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A565 List:
References
NUDOCS 9501030010
Download: ML17291A564 (5)


See also: IR 05000397/1994032

Text

UNITED STATES

NUCLEAR REGULATORY COMM

N

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

DEC 23 ISA

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Assistant

Managing

Director for Operations.

3000 George

Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/94-32

This refers to the inspection

conducted

by Hr.

R.

C. Barr and inspectors-

identified of this office on October

30 through

December

10,

1994.

The

inspection

included

a review of activities authorized for your Washington

Nuclear Project-2 facility.

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed

report.

We are encouraged

with the

improvements

the Supply System

has

achieved

in the

thoroughness

and effectiveness

of equality Assurance

audits

and recent

event

assessments.

We also note the progress

being 'made in control

room

professionalism

and urge your continued attention to each of these

important

areas.

One

non cited violation was identified involving improper manipulation of a

control rod

and this was in violation of 10 CFR Part 50, Appendix B.

This

violation is not being cited because

the criteria in paragraph

VII.B.1 of

Appendix

C to

10 CFR Part 2 of the NRC's "Rules of Practice"

were satisfied.

This violation indicated inattention to detail

by your operators.

This issue

was recognized

and corrected

by your staff.

In addition,

our inspectors

identified that

a senior licensed operator

had entered

the incorrect limiting

condition for operation

in

a status

log.

The error existed through three

shift turnovers prior to discovery

by the inspector.

Although this most

recent

issue

was not safety significant, your continued attention

towards

improving operator attention to detail

and implementation of the Technical

Specifications

is encouraged.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed

in the

NRC Public Document

Room.

950i030010

941223

PDR

ADOCK 05000397

8

PDR

Washington

Public Power Supply

System

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

Enclosure:

Appendix

NRC Inspection

Report

50-397/94-32

A. Bill Beach, Director

Division of Reactor Projects

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington

Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

.ATTN:

P.

R.

Bemis, Regulatory

Programs

Manager

P.OS

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington

Public Power Supply

System

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

IE Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public

Power Supply

System

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IEO1) ~+~i~

bcc distrib.

by RIV:

L. J.

Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAHE:

To receive copy cf document, indicate in box:

C" ~ Copy without enclosures

" ~ Copy with enclosures "N" ~ No copy

RIV:SRI*

RBarr

12/21/94

C:DRP/E*

DKirsch

12/23/94

D:WCFO

KEPerkins

12/

/94

C A

0

0

A

c

12/

94

  • previously concurred

Washington Public Power Supply

System

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

To receive copy of document, indicate tnbox: "C" ~ Copywithout enclosures

" ~ Copywith enclosures

"ttt" ~ No copy

RIY:SRI*

RBarr

12/21/94

C:DRP/E*

DKirsch

12/23/94

D:WCFO

KEPerkins

12/

/94

A

c

12

94

  • previously concurred