GO2-95-003, Monthly Operating Rept for Dec 1994 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1994 for WNP-2
ML17291A589
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-003, GO2-95-3, NUDOCS 9501170123
Download: ML17291A589 (7)


Text

I r

C RIORITY CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I ACCESSION NBR:9501170123 DOC.DATE: 94/12/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME

~

AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1994 for WNP-2.

W/950109 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

SIZE:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS XLE-CENTRE~>>

1 NRR/DOPS/OECB EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVKSTE!CONTACT'I'IIE DOC! 'CLIENTCONTROL DESK, ROO) I Pl-37 (EXT. 504-OS3 ) TO FLINIINATEYOI'R NAXIL'ROil DISTRIIIU'I'IONLIS'I'S I'OR DOCI.'NIEN'I'S YOl'ON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

1 4

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box968 ~ 3000 George Wasbtngton Way ~ Richland, 1Pasbtngton 99352-09%

~ (509) 372-5000 January 9, 1995 G02-95-003 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT DECEMBER 1994 Transmitted herewith is the Monthly Operating Report for the month of December, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, G. O. Smith Operations Division Manager (MD 9270)

GOS:DGE CC:

NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANILibrary UtilityData Institute BPA (399) 4 9501170123 941231 PDR ADOCK 05000397 R

PDR

~

'I

~

p I

I'R'

~

R N

R'~

)(

~

II I

R RI

'Li I

"R RR 0

~ RR s,,

~ l~,

F

':.I"IR' R 'R

~ I,) ~~ 3

OPERATING STATUS REPORT for WNP-2 Date:

January 1, 1995 2.

3.

4.

5.

6.

7.

8.

9.

3323 1200.9 1120 1132 1086 N/A Docket:

50-397 Reporting Period:

DECEMBER 1994 Outage + On-Line Hours:

744.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

Power to which restricted, ifany (Net MW,):

11.

Reasons for restrictions, ifany:

None 12.

Report Period Hours 13.

Hours Reactor Critical 14.

Rx Reserve Shutdown Hours 15.

'ours Generator On-Line 16.

Unit Reserve Shutdown Hours 17.

Gross Thermal Energy (MWH) 18.

Gross Electrical Energy (MWH) 19.

Net Electrical Energy (MWH) 20.

Unit Service Factor 21.

Unit AvailabilityFactor 22.

Unit Capacity Factor (MDC Net) 23.

Unit Capacity Factor (DER Net) 24.

Unit Forced Outage Rate 25.

Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,463,811 857,780 826,508 100.0%

100.0%

102.3%

99.2%

0.0%

0.0 YEAR 8,760.0 6,590.4 0.0 6,500.6 0.0 20,501,534 7,041,290 6,739,749 74.2%

74.2%

70.8%

68.7%

1.3%

85.8 CUMULATIVE 88,088.2 62,700.6 340.4 60,567.6 381,7 179,262,840 60,353,500 57,825,134 68.8%

69.2%

60.1%

59.5%

11.6%

7,971.1 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

Annual refueling (R-10), April 15, 1995, 42 days.

27.

Ifcurrently shutdown, estimated startup date:

N/A Note:

Cumulative Unit Capacity Factors (MDC &DER) are calculated with weighted averages.

g A

'\\

l

~'%

)1~

'a 1

A' AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

DECEMBER 1994 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 January 1, 1995 D. G, Embree (509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe) 1106 AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 16 10 12 13 14 15 1108 1120 1118 1117 1119 1119 1114 1114 1118 1118 1114 1115 1117 1116 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1032 1107 1105 1089 1106 1118 1116 1117 1119 1110 1112 1109 1121 1118 1119 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

DECEMBER 1994 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 January 1, 1995 4

D.G. Embree (509) 3774448 No.

Date Type Hours Re tson Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

The plant operated at full power during most all of the month, except for short downpower evolutions for periodic testing and minor maintenance.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM 8c COMPONENT NUREG%161 Exhibits F Ec H