Forwards Insp Rept 50-397/94-29 on 940919-1030 & Notice of Violation.Violations Involved Failure to Store Overhead Crane in Seismically Safe Location in Accordance W/Approved Drawing
ML17291A550
Person / Time
Site: Columbia 
Issue date: 12/16/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A551 List:
References
NUDOCS 9412230021
Download: ML17291A550 (7)


See also: IR 05000397/1994029

Text

PRlC)RI l Y Z

,REGULATORYN&8E5QFCN 86'PRORATION

SYSTEM (RIDS)

'i

ACCESSI()N'NBR:9412230021

DOC.DATE: 94/12/16

NOTARIZED: NO

DOCKET ¹

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

EACHiA.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/94-29

on 940919-1030

S notice of

violation.Violations involved failure to store overhead

crane in seismically safe location in accordance

w/approved

drawing.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

I

ENCL

I

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

/

ERNAL: LITCO BRYCE,J

H

NRC PDR

INTERNAL: ACRS

AEOD/SPD/RAB

AEOD+WTC

FILE CENTER

02

NRR/DRCEf/HHFB

NUDOCS-ABSTRACT

OGC

HDS3

COPIES

LTTR ENCL

1

'1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

VOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 'O'ASTE! CONTACTTHE DOCUMENT'TCONTROL

OM PI -37 (EXT. 504-2083 ) TO ELIMIYATEYOUR iNAME FROXI

DIS'I'RIBl.'TIOYLISTS FOR DOCL:."i!EikI'S YOU DON'1 NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

OEC

I 6 lggd

Docket:

50-397

License:

NPF-21

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Assistant

Managing

Director for Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/94-29

AND NOTICE OF VIOLATION

This refers to the inspection

conducted

by Mr. D. L. Proulx,

and inspectors

identified in this report, of this office on September

19 through October 30,

1994.

The inspection

included

a review of activities authorized for your

Washington Nuclear Project-2 facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the

enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

During this inspection period,

a number of significant issues

arose

(including

several

identified by quality assurance)

that demonstrated

strong

management

and staff followup and corrective actions in response

to emergent

issues.

Your continued effort in this area is encouraged.

Based

on the results of this inspection,

a violation of NRC requirements

was

identified involving your failure to store

an overhead

crane

in

a seismically

safe location in accordance

with approved

drawings.

This violation is of

concern

because it is similar to

a previous violation identified in Inspection

Report 50-397/93-20.

You are required to respond to this letter and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

9'41223002i 94i2ib

PDR

ADOCK 05000397

8

PDR

g~u

)

P

Washington Public

Power Supply

System

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~ax'. Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A Notice of Violation

2.

Appendix

B -

NRC Inspection

Report 50-397/94-29

cc w/enclosures:

Washington Public 'Power Supply System,

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

HD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemis,

Regulatory

Programs

Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power Supply

System

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

8 Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply

System

0FC 16

1994

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

Leah Tremper

(OC/LFDCB,

MS:

TWFN

Chief, Reactor

Systems Br., Div.

Safety

and Analysis,

NRR (HS:

Resident

Inspector

HIS System

RIV File

WCFO)

Branch Chief (DRP/TSS)

9E10)

B. Henderson

(PAO,

WCFO)

of System

A. B. Beach,

D/DRP

0-8-E23)

RIV:RI/E

DProulx

11/ /8

/94

C:DRP/E

DFKirsch

ll/ l8 /94

D:

CFO

KEPe

ins

11/

/

C:DRS/EB *

D:DRP

TFWesterman

ABBeach

iZ / /

/94

S / 5/94

  • Previously concurred

Washington Public

Power Supply

System

OEC

I 6

1994

E-Nail report to D. Sullivan

(DJS)

bcc to

DMB (I EOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

Leah Tremper

(OC/LFDCB, HS:

TWFN

Chief, Reactor

Systems Br., Div.

Safety

and Analysis,

NRR (HS:

Resident

Inspector

MIS System

RIV File

WCFO)

Branch Chief (DRP/TSS)

9E10)

B. Henderson

(PAO,

WCFO)

of System

A. B. Beach,

D/DRP

0-8-E23)

RIV:RI/E

DProulx +

C:DRP/E

DFKirsch

D:

CFO

KEPe

ins

C'DRS/EB *

TFWesterman

D:DRP

ABBeach~

11/ /8

/94

11/ I8 /94

11/

/

iz / /

/94

S / 5/94

  • Previously concurred