IR 05000397/1994031

From kanterella
Jump to navigation Jump to search
Insp Rept 50-397/94-31 Being Cancelled.No Insp Rept Will Be Issued for Rept Number
ML17291A599
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/05/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
50-397-94-31, NUDOCS 9501190029
Download: ML17291A599 (5)


Text

UNITED STATES NUC LEAR R EG ULATORY COMMISSION REGIDN IV 611 RYAN PLAZA DRIVE, SUITE 400 AR LING TON, T EXAS 76011.8064, JAIj 5

=,O'ashington Public Power Supply System ATTN:

J.

V. Parrish, Assistant Managing Director for Operations 3000 George Washington Way P.O.

Box 968, HD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/94-31 NRC Inspection Report 50-397/94-31 has been cancelled; therefore, no inspection report will be issued for this report number.

Sincerely, Thomas P.

Gwynn, Director Division of Reactor Safety CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927H Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way P.O.

Box 968, MD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power.Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Regulatory Programs Manager 950ii90029'50105 PDR ADOCK 0500039'7

PDR i ~n J tJ

Washington Public Power Supply System-2-Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190 Winston 8 Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

r't

Washington Public Power Supply System-3-E-Nail report to D. Sullivan (DJS)

bcc to DNB ( IE01)

bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (ORP/E, WCFO)

Leah Tremper (OC/LFOCB, MS:

TWFN 9E10)

Resident Inspector NIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUMENT NAME:

To receive copy of o

ment, indicate i ox:

C" a Copy without enclosures

"E" ~ Copy with enclosures

"N

~ No copy RIV:RI:MB EWhittemore Ol/

/95 C:MB APow rs 01/

0:ORS TPGw nn 01/5 /95 OFFICIAL RECORD COPY Ol/

/95 01/

/95

Washington Public Power Supply System-3-E-Nail report to D. Sullivan (DJS)

bcc to DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, NS:

TWFN 9E10)

Resident Inspector NIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUMENT NAME'o receive copy of o

ment, indicate i ox: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy RIV:RI:NB EWhittemore 01/

/95 C:NB APow rs Ol/

D:DRS TPGw nn 01/g /95 Ol/

/95 OFFICIAL RECORD COPY 01/

/95