IR 05000397/1994028

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/94-28
ML17291A590
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/06/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A591 List:
References
NUDOCS 9501180159
Download: ML17291A590 (7)


Text

PRIDRIT'Y Z REGULATOR'S+iAA84A~REIAS5HJSRTION SYSTEM (RIDS)

ACCESSION NBR:9501180159 DOC.DATE: 95/Ol/06 NOTARIZED: NO DOCKET N

~ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION GWYNN,T.P.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System SUBJECT:

Ack receipt of 941216 ltr informing NRC of steps taken to correct violations noted in insp rept 50-397/94-28.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice 'of Violation esponse NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RAB wAEGD/TTC"-

+FZLE-CENTER

NRR/DRCH/HHFB NUDOCS-ABSTRACT OGC/HDS3 TERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL

1

2

1

1

1

1

1

1

1

1 RECIPIENT ID CODE/NAME CLIFFORDgJ AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DORS/OEAB NRR/PMAS/IRCB-E OE DIR RGN4 FILE

NOAC COPIES LTTR ENCL

1

1

1

1

1

1

1

1

1 VOTE TO ALL"RIDS" RECIPIENT"iTS:.

PLEASE HELP US TO REDUCE O'ASTE! COi'TACTTHE DOCL'MENTCONTROL"

~

~

~

~

DESh, ROOM PI-37 (EAT. 504-ZOS3 ) TO ELIMINATE5'OLtR 4AME FROiI DISTRIDl"I'IOY.LISTS FOR DOCU5,IEYTS YOU DOi "I'EEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20, ENCL

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 January 6,

1995 i

Washington Public Power Supply System ATTN:

J.

V. Parrish, Assistant Managing Director for Operations 3000 George Washington Way P.O.

Box 968, MD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/94-28 Thank you for your letter of December 16, 1994, in response to our letter and Notice of Violation dated November 9, 1994.

We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation.

We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, Docket:

50-382 License:

NPF-38 r'homas P. Gwynn:,'i ector Division of Rea Sa ety CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way

.P.O.

Box 968, MD 396 Richland, Washington 99352-0968

~(G 950ii80i59 950i06 PDR ADOCK 05000397

PDR

'

Washington Public Power Supply System Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Regulatory Programs Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190

~

~

~

~

Winston

& Strawn ATTN:

M. H. Philips, Esq.

1400 L Street, N.W.

Washington, D,C, 20005-3502

l Washington Public Power Supply System E-Hail report to D. Sullivan (DJS)

bcc to DHB ( IE01)

bcc distrib.

by RIV:

LE J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

T.

P.

GWYNN, D/DRS Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

W.

P.

Ang, C/PSB AI File 94-113 DOCUHENT NAHE:

R:iWN428LT.WJW To receive copy of document, indicate in box: "C" ~ Copy without enclosures E" ~ Copy with enclosures "N" ~ No copy WCFO C/PSB

DRS D:DRP D:DRS WWa ner WPAn.~d'~

TPGw nn Beach TPGw nn Ol/dr-'/95 Ol/

/95 Ol/g /95 Ol/5 /95 OFFICIAL RECORD COPY Ol/

/95

Washington Public Power Supply System-3-E-Hail report to D. Sullivan (DJS)

bcc to DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

T.

P.

GWYNN, D/DRS Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

W. P.'ng, C/PSB AI File 94-113 DOCUMENT NAME:

R:iWN428LT.WJW To receive copy of document, indicate in box: "C" ~ Copy without enclosures E" a Copy with enclosures "N" ~ No copy WCFO WWa ner Ol/o0/95 C

PSB

DRS D:DRP WPAn ~d Ail TPGw nn Beach Ol/'95 Ol/5 /95 Ol/

/95 OFFICIAL RECORD COPY 0:DRS TPGw nn Ol/

/95

0