Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-94-123, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Which Responds to Questions on Cycle 10 Operation + (ML17290B189)
- ML17290B190 + (ML17290B190)
- ML17290B191 + (ML17290B191)
- GO2-94-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/94-12.Corrective Actions:Two Deficiencies Associated W/Chiller CCH-CR-1B Corrected & Chiller Returned to Svc on 940411 + (ML17290B192)
- 05000397/LER-1994-008, :on 940426,CROs Observed Slight Reactor Power Fluctuations on Six Aprms.Caused by Degraded Condition of Reactor Recirculation (RRC) FCV Position Transmitter. Replaced RRC FCV Position Transmitters + (ML17290B194)
- ML17290B198 + (ML17290B198)
- ML17290B200 + (ML17290B200)
- ML17290B201 + (ML17290B201)
- ML17290B203 + (ML17290B203)
- IR 05000397/1994016 + (ML17290B204)
- 05000397/LER-1991-036, :on 911226,missed ASME Section XI Test for Fuel Pool Cooling Relief Valve FPC-RV-117B Violated TS Sections 4.0.2 & 4.0.5.Cause Not Identified.Required Surveillance Testing Performed on FPC-RV-117B + (ML17290B222)
- IR 05000397/2017406 + (ML17290B223)
- ML17290B225 + (ML17290B225)
- ML17290B227 + (ML17290B227)
- ML17290B232 + (ML17290B232)
- GO2-92-186, Monthly Operating Rept for Jul 1992 for WNP-2 + (ML17290B258)
- ML17290B259 + (ML17290B259)
- GO2-92-242, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-28.Corrective Actions:Mechanical Maint Personnel Counseled on Importance of Maintaining Radiation Barrier Postings at All Times + (ML17290B262)
- ML17290B268 + (ML17290B268)
- ML17290B270 + (ML17290B270)
- PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report + (ML17291A006)
- ML17291A008 + (ML17291A008)
- ML17291A009 + (ML17291A009)
- ML17291A039 + (ML17291A039)
- ML17291A045 + (ML17291A045)
- ML17291A052 + (ML17291A052)
- ML17291A081 + (ML17291A081)
- ML17291A104 + (ML17291A104)
- ML17291A106 + (ML17291A106)
- ML17291A112 + (ML17291A112)
- GO2-94-130, Monthly Operating Rept for May 1994 for WNP-2 + (ML17291A113)
- GO2-94-128, Informs of Completion of Updated Ipe,Including Review Comments.However,Addl Mgt Review Will Allow More Effective Implementation of IPE Recommendations & Insights,Therefore, Supply Sys Will Submit IPE by 940727 + (ML17291A115)
- ML17291A116 + (ML17291A116)
- GO2-94-134, Forwards Proprietary Overhead Slides to Be Presented During Meeting W/Nrc Staff.Encl Withheld (Ref 10CFR2.790(b) + (ML17291A117)
- 05000397/LER-1993-001, :on 930213,determined That Both Trains of SPC of RHR System Were Inoperable Due to LOP Coincident W/Lpci Safety Function.Reviews & Safety Evaluations Has Been Enhanced + (ML17291A121)
- GO2-94-135, Transmits Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8,per GL 88-01 & Results of Evaluation of Nascrac Methodology,In Response to 930611 Request Re Review of Insp Rept on Flaw in Subj Piping + (ML17291A123)
- ML17291A127 + (ML17291A127)
- ML17291A129 + (ML17291A129)
- ML17291A130 + (ML17291A130)
- ML17291A132 + (ML17291A132)
- ML17291A134 + (ML17291A134)
- ML17291A135 + (ML17291A135)
- ML17291A137 + (ML17291A137)
- ML17291A138 + (ML17291A138)
- ML17291A140 + (ML17291A140)
- ML17291A141 + (ML17291A141)
- IR 05000397/1994002 + (ML17291A142)
- IR 05000397/1994012 + (ML17291A143)
- GO2-94-141, Responds to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers + (ML17291A144)
- ML17291A145 + (ML17291A145)
- ML17291A148 + (ML17291A148)