ML17290B201

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/94-16 on 940411-18.No Violation Noted
ML17290B201
Person / Time
Site: Columbia 
Issue date: 05/27/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290B202 List:
References
NUDOCS 9406060290
Download: ML17290B201 (6)


See also: IR 05000397/1994016

Text

~P,6 RKC0

(4

P0

Cy

yO~

P

<<)

0

I

W**+4

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 6064

Docket:

50-397

License:

NPF-21

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Assistant

Managing

Director for Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/94-16

This refers to the inspection

conducted

by Mr. T.

R.

Meadows of this office,

and the personnel

identified in the enclosed

report,

on April 11-18,

1994.

The inspection

included

an assessment

of the qualifications of 12 individuals

who had applied for licenses

to operate your Washington Nuclear Project

No. 2.

At the conclusion of the inspection,

observations

of generic significance were

discussed

with you and those

members of your staff identified in the enclosed

report.

Appropriate licenses

have

been

issued to ll of the

12 applicants,

who

successfully

completed all portions of their examinations.

Areas

examined during the inspection

are identified in this report.

Within

these

areas,

the inspection consisted of an evaluation of license applicants

by the use of written examinations,

dynamic simulations,

and selected

job

related tasks,

and oral questioning

in accordance

with NUREG-1021,

"Operator

Licensing Examiner Standards,"

Revision 7.

The results of this inspection

are

documented

on page

1 of the enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosure will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

we will be pleased

to

discuss

them with you.

Sincerely,

Thomas

P.

Gwynn, Director

Division of Reactor Safety

Enclosure:

NRC Inspection

Report 50-397/94-16

w/attachments

cc:

(see next page)

O~0638

1

~

II

Washington Public Power Supply

System

cc w/complete enclosure:

Washington Public Power Supply System

ATTN:

J.

Baker,

Manager,

Nuclear Training,

WNP-2

3000 George

Washington

Way

Richland,

WA 99352

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Warren Bishop,

Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

H. K. Kook,

WNP-2 Licensing Manager

P.O.

Box 968,

MD PE20

Richland,

Washington

99352-0968

Washington Public Power

Supply System

ATTN:

P.

R. Bemis, Regulatory

Programs

Manager

P.O.

Box 968,

(Mail Drop PE20)

Richland,

Washington,

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington

Public

Power Supply

System

E-Hail report to D. Sullivan

(DJS)

bcc to

DNB IE01

8

IE42

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

HS:

T.

R.

Meadows

J.

L. Pellet Reading File

Robert Gallo,

MS-10-D-22

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

RIV:RI: DRS:OB

TRMeadows

C:OB*

JLPellet

/

/94

ADD:DRS

JAMitchell

a /W/94

D:D

ABB ach

/26/94

D:DRS~

TPGwynn

5" /a7/94

"previous y concurre

Washington Public

Power Supply

System

E-Hail report to 0. Sullivan

(DJS)

~bcc to%I&=I~ la

LE%2".

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB, HS:

T.

R.

Headows

J.

L. Pellet

Reading File

Robert Gallo, HS-30-0-22

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

RIV:RI:DRS:OB

TRHeadows

C:OB*

JLPellet

ADD:DRS

JAMitchell

0:0

ABB ach

D:DRS~

TPGwynn

/

/94

/

/94

curre

previous y con

o /W/94

/26/94

5 /i7/94

0

t