GO2-92-186, Monthly Operating Rept for Jul 1992 for WNP-2
| ML17290B258 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/31/1992 |
| From: | John Baker, Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-92-186, NUDOCS 9208210215 | |
| Download: ML17290B258 (8) | |
Text
~ccz~zawrzo gkgmram rox ozMox~wa.~nor svsrzM REGULARLY INFORNATXON DXSTRIBUTIG~>SYSTEM
$ RIDS)
FACIL: 50'-397 WPPSS Nuclear Pro Jecti Unit 2i Washington Public Poee AUTH. NAKE AUTHOR AFFILIATION HUTCHXSQNt L. B.
Washington Public Power Supply System BAKERi d. W.
Washington Public Poeer Supply System REC IP. NANE RECXPXENT AFFX! XATION DOCKET 0 05000397
SUBJECT:
Nonthlg opev ating v ept for Jul 1992 fov MNP-2. " Q/920805 1 tv.
DXSTR IBUTXQN CODE:
XE24D CQP IES RECEIVED: LTR ENCt SX ZE:
TXTL'E: Nonthlg Operating Report (per Tech Specs)
RECIPXENT ID CODE/NAME PD5 LA DEANi N.
COPXES LTTR ENCL 3
3 REClPI ENT ID CODE/NAKE PD5 PD COPXES LTTR ENCL 1
XNTERNAL:. ACRS AEQD/DSP/TPAB NRR/DQEA/OEAB RGN5 10 10 AEOD/DQA 1
1 NRR 8/LP EB 10 1
EG FXL 01 EXTERNAL:
EGSG BRYCE~ J. H NSIC I
1 1
1 NRC PDR S
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT COiNTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL, NUBBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bm968 ~ 3000George Wasbtngton Way ~ Rfcbland, Wasbtngton 993524968
~ (509)372-5000 Docket No. 50-397 August 5, 1992 G02-92-186 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT JULY 1992 Transmitted herewith is the Monthly Operating Report for the month of July 1992 as required by our Technical Specifications 6.9.1.6.
Very truly yours, or'r J.W. Baker WNP-2 Plant Manager (MD 927M)
LBH:bap CC:
Mr. W.H. Lovelace, NRC, Washington, DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Hartford, CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 9208210215 920731 PDR "tj'ADOCK
. 05000397 R'
PDR ZpPt
DOCKET NO.:
50-397 UNITNAME:
WNP-2 I
DATE:
AUGUST 1, 1992
~
COMPLETED BY:
LB HUTCHISON TELEPHONE:
(509) 377-2486 UNIT SEiUTD WNS / RKDUCTI NS REPORT PERIOD: JULY 1992 5
" ~
92-03 4/18/92 S
460.4 C
RC FUEL XX Concluded refueling outage R-7.
92-04 7/20/92 S
3.7 B
HA MECFUN Generator was removed from service for overspeed testing and turbine bypass valve testing.
It was resynchronized to grid after successful completion of testing.
92-05 7/21/92 S
16.4 B
HA TURBIN Generator was removed from grid for torsional testing of turbine rotors.
After satisfactory completion of testing, it was returned to service.
SUMMARY
- WNP-2 returned to service from refueling.
Subsequently, two scheduled outages for testing were completed.
TYPE REASON METHOD SYSTEM &COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&
LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG4161)
I
MONTH:
JULY 1992 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNF-2 AUGUST 1, 1992 LB HUTCHISON (509) 377-2486 DAYAVERAGE DAILYPOWER LEVEL (MWe-NET)
DAYAVERAGE DAILYPOWER LEVEL (MWe-NET) 17.
2.
18.
3.
19.
4.
20.
101 0
21.
36 22.
343 8.
9.
23.
613 875 802 10.
26.
857 27.
1019 12.
28.
1085 13.
29.
1083 14.
30.
1089 15.
31.
1022 16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAYIN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THATWHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THERE MAYBE OCCASIONS WHEN THE DAILYAVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.
OPERATING DATA REPORT WNP-2 DATE:
01-Aug-92 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Jul-92 3.
UTILITY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRXCAL RATING (NET MWe):
7.
MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUMDEPENDABLE CAPACITY (NET MWe):
9.
XF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
one 3323 1200.9 1100 1129 1085 10.
POWER TO WHICH RESTRICTED, ZF ANY (NET MWe):
11.
REASONS FOR RESTRICTXONS, IF ANY:
None 12
~
REPORT PERIOD HOURS 13.
HOURS REACTOR CRXTICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16'NIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH)
- 20. UNIT SERVXCE FACTOR 21.
UNXT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET)
- 23. UNIT CAPACITY FACTOR (DER NET)
- 24. UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 362.5 0 '
263.5 0 '
684858 227300 207280 35.4%
35 44 25.74 25.34 0 ~ 04'
~ 0 YEAR 5111 2447.5 0.0 2306.2 0.0 7273108 2460830 2330190 45.
14'5.14
- 42. 04 41.
44'9.34 552 0
CUMULATIVE 66895 2
45838.2 340 '
44106.0 381.7 126888930 42316650 40588229 65.94 66.54 55.54 55.24 13.
54'855.8 2 6 ~
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE g DURATION)
None 27 ~ IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
0 g Vl
'I