Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-94-081, Forwards Rev 1 to COLR 93-9, WNP-2,Cycle 9 Colr. COLR Reviewed & Approved by Util Plant Operating Committee + (ML17290B106)
- ML17290B107 + (ML17290B107)
- ML17290B108 + (ML17290B108)
- GO2-94-084, Submits Response to Suppl 3 to GL 89-10 in Response to Insp Rept 50-397/93-23 + (ML17290B111)
- GO2-94-088, Responds to NRC Bulletin 93-002,suppl 1, Plugging of Emergency Core Cooling Suction Strainers + (ML17290B112)
- ML17290B113 + (ML17290B113)
- GO2-94-087, Responds to Violation Noted in Insp Rept 50-397/94-04. Corrective Actions:Valves W/Same Deficiency Changed to Include Mode 1 Specific Actions.Arp Added to Required Reading List for Operations Personnel + (ML17290B115)
- GO2-94-089, Advises That Anfb Critical Power Correlation, ANF-1125(P)(A),suppl 2,dtd Apr 1990 Contains Proprietary Info & Should Be Withheld from Public Disclosure Per 10CFR2.790 + (ML17290B116)
- GO2-94-083, Expresses Appreciation for Efforts in Hosting Meeting & Training Session for 15 Members of Util Staff on 940321,to Exchange Ideas to Address NRC Concerns & Increase Quality of Util Submittals & Util Familiarity W/Nrc Processes + (ML17290B117)
- ML17290B119 + (ML17290B119)
- ML17290B121 + (ML17290B121)
- ML17290B122 + (ML17290B122)
- GO2-94-095, Provides Comments Re Concerns Noted in NRC Re EOP Insp Rept 50-397/94-01 on 940207-18.Separate Ltr Further Clarifying Actions Taken by Util in Response to 1991 NRC EOP Insp Will Be Submitted by 941231 + (ML17290B123)
- GO2-94-094, Clarifies Intent of 931220 Request for Amend to TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys & Suppl by + (ML17290B124)
- 05000397/LER-1994-006, :on 940330,discovered Broken HPCS-B1-DG 3 Battery Flag Terminal Weld.Caused by Poor Equipment Design. Damaged Battery Cell Replaced + (ML17290B128)
- ML17290B134 + (ML17290B134)
- ML17290B136 + (ML17290B136)
- ML17290B137 + (ML17290B137)
- GO2-94-096, Operational Ecological Monitoring Program for Nuclear Wpps 2 1993 Annual Rept + (ML17290B140)
- GO2-94-097, Wpps Nuclear Plant 2 1993 Annual Rept,Jan-Dec 1993, Radiological Environ Monitoring Program + (ML17290B141)
- ML17290B142 + (ML17290B142)
- GO2-94-099, Responds to NRC Re Violation Noted in Insp Rept 50-397/94-02.Corrective Actions:Surveillance Procedure (PPM 7.4.6.1.2) Changed to Include Independent Verification of EFCV Bypass Valve Closure for Listed Valves + (ML17290B143)
- ML17290B148 + (ML17290B148)
- ML17290B150 + (ML17290B150)
- GO2-94-107, Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves + (ML17290B155)
- ML17290B156 + (ML17290B156)
- ML17290B157 + (ML17290B157)
- IR 05000397/1994001 + (ML17290B158)
- ML17290B159 + (ML17290B159)
- ML17290B161 + (ML17290B161)
- ML17290B164 + (ML17290B164)
- IR 05000397/1994009 + (ML17290B165)
- ML17290B168 + (ML17290B168)
- GO2-94-109, Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication + (ML17290B171)
- ML17290B172 + (ML17290B172)
- ML17290B173 + (ML17290B173)
- GO2-94-103, Responds to Request for Info Re 930709 Submittal to Increase WNP-2 Licensed Power Level + (ML17290B174)
- 05000397/LER-1994-007, :on 940410,RCIC Level 8 Isolation Instrument Calibr Outside TS Allowable Value.Caused by Failure to Self Check.Corrective Actions:Personnel Involved Counseled.W/ + (ML17290B175)
- GO2-94-105, Monthly Operating Rept for Apr 1994 for WNP 2 + (ML17290B176)
- ML17290B177 + (ML17290B177)
- ML17290B179 + (ML17290B179)
- ML17290B180 + (ML17290B180)
- GO2-94-116, Responds to Request for Addl Info Re 940217 Request for Amend to TS to Support Hydrostatic Testing + (ML17290B181)
- GO2-94-115, Forwards Response to NRC 931229 RAI Re Power Uprate,W/Regard to Increase of Bottom Head Pressure & High Pressure Scram Setpoint on Structural & Functional Integrity of Control Rod Drive Sys + (ML17290B182)
- 05000397/LER-1994-009, :on 940419,CI Provisions for Two Containment Monitoring Systems Were Inoperable Due to Inboard Valves Not Functioning as Ci Valves in Event of Loca.Corrective Action:Replace EFC Valves W/Check Valves + (ML17290B184)
- ML17290B186 + (ML17290B186)
- GO2-94-123, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Which Responds to Questions on Cycle 10 Operation + (ML17290B189)
- ML17290B190 + (ML17290B190)
- ML17290B191 + (ML17290B191)
- GO2-94-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/94-12.Corrective Actions:Two Deficiencies Associated W/Chiller CCH-CR-1B Corrected & Chiller Returned to Svc on 940411 + (ML17290B192)
- 05000397/LER-1994-008, :on 940426,CROs Observed Slight Reactor Power Fluctuations on Six Aprms.Caused by Degraded Condition of Reactor Recirculation (RRC) FCV Position Transmitter. Replaced RRC FCV Position Transmitters + (ML17290B194)