FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SUBJECT:
Forwards insp rept 50-397/94-12
on 940222-0402
& notice of
violation.NRC concerned
that programs
to assure
completion
of NRC commitments
not effective.
I
54ZY
D
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
ACCESSION NBR:9405020167
DOC.DATE: 94/04/22
NOTARIZED: NO
DOCKET
CIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
UTH.NAME
AUTHOR AFFILIATION
EACH,A.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power
Supply System
NOTES:
INTERNAL:
RECIPIENT
ID CODE/NAME
PDIV-3 PD
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS1
RES/HFB
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORDiJ
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE DI
EG
L
02
RGN'4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
S/.
F
EXTERNAL: EG&G/BRYCE,J.H.
1
1
1
1
NRC PDR
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24, ENCL
24
t
UN IT E D STATE6
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA ORIVE, SUITE 400
ARLINGTON, TEXAS 76011.6064
APR 22 I9M
Docket:
50-397
License:
Washington Public
Power Supply System
ATTN:
J.
V. Parrish,
Assistant
Managing
Director for Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/94-12
This refers to the inspection
conducted
by
identified in the enclosed report, of this
April 2,
1994.
This inspection
included
a
your Washington Nuclear Project 2.
At the
findings were discussed
with you and those
the enclosed report.
Mr. R.
C. Barr,
and the inspectors
office on February
22 through
review of activities authorized for
conclusion of the inspection,
the
members of your staff identified in
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
of activities in progress.
Several
issues
contained
in this report highlight that improved engineering
support of plant operations
is warranted.
Specifically,
a number of
deficiencies
were identified by the inspectors
regarding the control
room
heating, ventilation,
and air conditioning system.
These deficiencies
could
have
been identified and corrected
by your engineering staff, or by other
members of the plant staff, if a more questioning attitude existed.
Additionally, engineering
support of supply system considerations
to extend
the present
fuel cycle and to implement
changes
to rated core power during the
upcoming outage,
could have
been
more thorough.
Specifically, senior
management
failed to provide effective and timely communication of their plans
to extend Cycle
9 operation to the fuels engineering organization.
This
resulted
in extensive efforts to provide
a new core reload design analysis
at
a late date in the fuel cycle.
We are concerned that your programs to assure
completion of NRC commitment's
are not effective.
Specifically, in your response
to the
1993
SALP report,
you commited to perform system walkdowns with teams of personnel.
However,
several
previous
NRC inspection reports
have documented that your staff had
not performed
system walkdowns with the necessary
frequency or the requisite
degree of detail to assure
a high quality condition of your safety systems.
The inspectors
found, during this inspection period, that the walkdowns of the
control
room
HVAC system were not of sufficient detail or depth to identify
9405020agy 9404~
ADOCK 05000397
Q
PBR
gg)1
Washington Public Power Supply
System
and correct the types of deficiencies
which were identified by the Resident
Inspectors
during their walkdowns of the system.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
These violations concerned your failure to take prompt
corrective action for the degraded
condition of your control
room emergency
chiller, which is required to be operable
by the Washington Nuclear Project
2
operating license,
and your failure to follow procedures
for control
room
ventilation and to provide appropriate
procedural
direction for breaker
lineups.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions
taken
and any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"
a copy of
this letter and the enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosures:
l.
Appendix A - Notice of Violation
2.
Appendix
B -
NRC Inspection
Report
50-397/94-12
~s
. Bill Beach, Director
Division of Reactor Projects
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,- WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
G.
E.
C. Doupe,
Esq.
3000 George Washington
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
fl
Washington Public
Power
Supply
System
Energy Facility Site Evaluation Council
ATTN:
Warren Bishop,
Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
H. K. Kook,
WNP-2 Licensing Hanager
P.O.
Box 968,
HD PE20
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Regulatory
Programs
Hanager
P.O.
Box 968,
(Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
& Strawn
ATTN:
H. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
APR 22 l994
E-Hail r epor t to D. Sul l ivan
(DJS)
bcc to DHB (IEOl)
bcc distrib. by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E)
RIV File
K. Perkins
J. Clifford, NRR (HS:
13E16)
R. Huey,
WCFO
G. Cook,
WCFO
bcc w/Enclosure
1 only:
M. Smith,
WCFO
J. Bianchi,
WCFO
D. Clevenger,
WCFO
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E)
Chief (DRP/TSS)
Resident
Inspector
S. Richards,
WCFO
P. Johnson,
WCFO
Leah Tremper,
OC/LFDCB, HS:
HNBB 4503
RIV:SRI*
RBarr
4/15/94
C:DRP/E*
DKirsch
4/15/94
SRichards
4/15/94
ADD:DRP*
KPerkins
4/15/94
D
P
A Be ch
4/
/94
- previously concurred
Washington Public Power Supply
System
APR 22 l994
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E)
RIV File
K. Perkins
J. Clifford, NRR (MS:
13E16)
R. Huey,
WCFO
G.
Cook,
WCFO
bcc w/Enclosure
1 only:
M. Smith,
WCFO
J. Bianchi,
WCFO
D. Clevenger,
WCFO
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E)
Chief (DRP/TSS)
Resident
Inspector
S. Richards,
WCFO
P. Johnson,
WCFO
Leah Tremper,
OC/LFDCB,
MS:
MNBB 4503
RIV:SRI*
RBarr
C:DRP/E*
DKirsch
4/15/94
SRichards
4/15/94
ADD:DRP*
KPerkins
4/15/94
D:
P
A Be ch
4/
/94
- previously concurred