ML17290B161
| ML17290B161 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/10/1994 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17290B162 | List: |
| References | |
| NUDOCS 9405160036 | |
| Download: ML17290B161 (6) | |
See also: IR 05000397/1994009
Text
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9405160036
DOC.DATE: 94/05/10
NOTARIZED: NO
DOCKET
CIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
TH.NAME
AUTHOR AFFILIATION
ALLAN,L.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards corrected first page of SALP rept 50-397/94-09.
Corrects first page of transmittal ltr,in which bottom line
was inadvertently omitted from.original issue.
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
NOTES:
RECIPIENT
ID CODE/NAME
PDIV-3 LA
CLIFFORDiJ
COPIES
LTTR ENCL
1
1
1
1
RECIPIENT
ID CODE/NAME
PDIV-3 PD
COPIES
LTTR ENCL
1
1
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFBPT
NRR/DRIL/RPEB
NRR/DRSS/PEPB
NRR/DRSS/RSGB
NUDOCS-ABSTRACT
OGC/HDS1
RES/HFB
EXTERNAL: EGSG/BRYCE,J.H.
NRC
2
AEOD/DOA
1
COMMISSION
1
NRR/DORS/OEAB
1
NRR/DRCH/HOLB
1
NRR/DRIL/RSIB
1
NRR/DRSS/PRPB
1
NRR/PMAS/ILRB
1
1
REG BIb
02
1
RGN4
FILE
01
1
L ST LOBBY WARD
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
32
ENCL
32
~y,ll IIEC(
C~
0
g'
+ **y4
UNIT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
MAY
) 0 l994
Docket:
50-397
License:
Washington Public Power Supply System
ATTN:
J.
V. Parrish, Assistant
Hanaging
Director for Operations
3000 George
Way
P.O.
Box 968,
HD 1023
Richland,
99352
SUBJECT:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(SALP)
(NRC
INSPECTION
REPORT 50-397/94-09)
The bottom line of the first page of the transmittal letter of the
subject report
was inadvertently omitted from the original issue.
Please
replace
the page that you have with the attached
corrected
page.
Sincerely,
Attachment:
As stated
. J.
Ca
an
Re i nal Administrator
cc w/attachment:
- Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
G.
E.
C. Doupe,
Esq.
3000 George Washington
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Warren Bishop,
Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
J.~00 j 7
9405160036
9405iO
ADOGK 05000397
Q
'- PDR
Washington Public Poler Supply
System
Washington Public Power Supply System
ATTN:
H. K. Kook,
WNP-2 Licensing Hanager
P.O.
Box 968,
HD PE20
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis,
Regulatory
Programs
Hanager
P.O.
Box 968,
(Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
H. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
NAY I 0 l994
E-Mail report to D. Sullivan
(DJS)
bcc to
DHB (IE40)
bcc distrib. by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
MNBB 4503
The Chairman
(MS:
16-G-15)
Commissioner
Rogers
(HS:
16-G-15)
Commissioner
Remick
(HS:
16-G-15)
Commissioner
de Planque
(HS:
16-G-15)
J.
H. Taylor,
EDO (HS:
17-G-21)
J.
H. Montgomery
J.
T. Gilliland,
PAO
Carol
Gordon
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E)
Branch Chief (DRP/TSS)
Records
Center,
G.
F. Sanborn,
RRIs at all sites
D. D. Chamberlain,
AD:DRSS
L.
W. Camper,
DRSS
B. Murray,
DRSS
C. A. Hackney
G.
N. Cook,
WCFO
RIV:C:DRP/ SS
D:
P
LAYandell df
AB e
h
JMMon
ornery
LJCallan
5/LO/94
5/<o /94
5/
/94
5/ i)94
Washington Public Power Supply
System
NAY I 0 Pg
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IE40)
bcc distrib. by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E)
RIV File
Leah Tremper,
OC/LFDCB, HS:
MNBB 4503
The Chairman
(HS:
16-G-15)
Commissioner
Rogers
(HS:
16-G-15)
Commissioner
Remick
(MS:
16-G-15)
Commissioner
de Planque
(HS:
16-G-15)
J.
M. Taylor,
EDO (HS:
17-G-21)
J.
H. Montgomery
J. T. Gilliland,
PAO
Carol'ordon
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E)
Branch Chief (DRP/TSS)
Records
Center,
G.
F. Sanborn,
RRIs at all sites
D. D. Chamberlain,
AD:DRSS
L.
W. Camper,
DRSS
B. Murray,
DRSS
C. A. Hackney
G.
N. Cook,
WCFO
RIV:C:DRP/ SS
D:
P
LAYandell df
AB e
h
DMMon
ornery
LJCallan
5/t9/94
5/1o /94
5/
/94
5/ 5/94