- PNO-V-89-018, on 890316,discovered Nonconservative Assumptions Used in post-accident Control Room Exposure Calculations.Dose Could Exceed 200 Rem.Unusual Event Declared.Power Level Restricted to 52% Power + (ML17285A327)
- ML17285A328 + (ML17285A328)
- ML17285A329 + (ML17285A329)
- 05000397/LER-1989-003, :on 890209,control Room Emergency Filtration Sys Adsorber Charcoal Sample Not Taken After 720 H of Operation.Caused by Misinterpretation of Tech Specs.Charcoal Sample Analyzed & Procedure Revised + (ML17285A330)
- ML17285A332 + (ML17285A332)
- GO2-89-040, Forwards Supplemental Info Re Amend 6 to Offsite Dose Calculation Manual.Richland Potable Water Intake Considered Nearest Public Intake.Info Clarified on Page 8 + (ML17285A333)
- 05000397/LER-1988-036, :on 881118,inconsistency Noted Between Channel Functional Test Surveillance Procedure & Tech Specs for Div 1 4.16 Kv Emergency Bus Undervoltage Degraded Voltage.Caused by Inadequate Procedure.Tech Spec Revised + (ML17285A334)
- GO2-89-046, Forwards Amended Response to Notice of Violation Contained in Insp Rept 50-397/88-40.Corrective Actions:Guidance Document Will Be Prepared to Better Understand Processes Associated W/Relief from Tech Specs Re Vital Switchgear + (ML17285A336)
- GO2-89-047, Application for Amend to License NPF-21,implementing Requirements of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage + (ML17285A337)
- ML17285A342 + (ML17285A342)
- ML17285A345 + (ML17285A345)
- ML17285A347 + (ML17285A347)
- ML17285A348 + (ML17285A348)
- ML17285A351 + (ML17285A351)
- ML17285A355 + (ML17285A355)
- GO2-89-049, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Measures Taken to Ensure That Only molded-case Circuit Breakers Procured Under 10CFR50,App B QA Program Maintained as Stored Spares + (ML17285A356)
- GO2-89-051, Application for Amend to License NPF-21,revising Tech Specs 3/4.2.6 Re Power Flow Instability & 3/4.2.7 Re Neutron Flux Noise Monitoring in Support of Supply Sys Response to NRC Bulletin 88-007,Suppl 1 + (ML17285A358)
- ML17285A359 + (ML17285A359)
- ML17285A360 + (ML17285A360)
- GO2-89-053, Submits Revised Response to NRC Re Violation B Noted in Insp Rept 50-397/88-24.Corrective Actions: Troubleshooting Procedure Will Be Revised.Addl Info Re Verbal Procedure Deviations Also Encl,Per Request + (ML17285A361)
- ML17285A364 + (ML17285A364)
- ML17285A366 + (ML17285A366)
- GO2-89-054, Submits List of Property & Liability Insurance Coverage in Force for Facility + (ML17285A367)
- GO2-89-050, Submits Supplemental Info Re Request for Amend to License Condition 2.C.14 & Removal of Fire Protection Requirements from Tech Specs.Util Requests That NRC Not Act on Request to Delete Paragraphs 6.5.2.8.e & H & 6.8.1.g from Tech Specs + (ML17285A368)
- 05000397/LER-1989-004, :on 890226,mobile Crane Brought within Reach of safety-related Structures & Components W/O Safety Evaluation Being Performed.Caused by Lack of Procedures Controlling Use of Mobile Cranes.Crane Removed from Area + (ML17285A369)
- ML17285A375 + (ML17285A375)
- ML17285A378 + (ML17285A378)
- IR 05000397/1989004 + (ML17285A379)
- GO2-89-055, Confirms Commitments for Compliance W/Atws Rule 10CFR50.62 Re Recirculating Pump Trip,Per 890303 Telcon.Recirculating Pump Trip Logic Trip Scheme Will Be Redesign as Indicated in Encl Diagram + (ML17285A387)
- ML17285A392 + (ML17285A392)
- GO2-89-058, Forwards Proposed Change to NPDES Permit WA-002515-1 Re Monitoring of Residual Chlorine in Cooling Water Blowndown. Evaluation Council Will Consider Request as Formal Permit Mod + (ML17285A393)
- GO2-89-059, Application for Amend to License NPF-21,reducing Age Factor of Div 1 250-volt Dc Battery Sys to 20%,per 10CFR50.59,in Tech Spec 3/4.8.2, DC Sources + (ML17285A394)
- ML17285A395 + (ML17285A395)
- ML17285A396 + (ML17285A396)
- GO2-89-061, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-09.Corrective Action:Radiological Posting Restored to Correct Configuration.Health Physics Personnel Performing Tour of Plant for Compliance W/Radiological Control Progra + (ML17285A403)
- GO2-89-064, Forwards Status of Implementation of TMI Action Plan Items for Plant,Per 890414 Request.Implementation of Issue II.F.1.2.B Considered by Util to Be Complete Based on Last Ltr to NRC + (ML17285A411)
- 05000397/LER-1989-007, :on 890316,discovered That Two Tech Spec Surveillance Procedures Re Fire Protection Zones for Standby Svc Water Pump Houses & Power Generation Control Cabinet Inconsistent.Action Statements Implemented + (ML17285A412)
- IR 05000397/1989009 + (ML17285A413)
- GO2-89-065, Forwards Amends 3,4,& 5 to Offsite Dose Calculation Manual Re Tech Spec Section 6.14.2a, Administrative Controls. Amends Cover Semiannual Reporting Requirements & near-field Dilution Factor + (ML17285A414)
- ML17285A418 + (ML17285A418)
- IR 05000397/1989010 + (ML17285A420)
- ML17285A421 + (ML17285A421)
- IR 05000397/1989008 + (ML17285A423)
- 05000397/LER-1989-009, :on 880529,full Reactor Protection Sys Actuation Occurred Twice During Performance Testing.Caused by Inadequate Preoperational Test & trouble-shooting Procedures.Preoperational Procedure Revised + (ML17285A425)
- ML17285A427 + (ML17285A427)
- GO2-89-072, Supply Sys Nuclear Plant 2 Annual Environ Operating Rept 1988 + (ML17285A428)
- GO2-89-069, Forwards Application to Amend License NPF-21,authorizing Onsite Disposal of Very Low Level Radwaste by Burying Eight Moisture Separator Reheater Tube Bundles W/Associated Assemblies & Four Small Spools of Piping + (ML17285A430)
- ML17285A431 + (ML17285A431)
- GO2-89-070, Part 21 Rept Re Defect in Limitorque Valve Motor Operator Model SMB-2 W/Soft Worm Shaft Clutch Gear Assembly.Caused by Failure to Install Split Spacer of Worm Shaft Clutch Gear assembly.Safety-related Valves Manually Operated + (ML17285A432)
- 05000397/LER-1988-030, :on 880825 & 26,full Reactor Protection Sys (RPS) Actuations Occurred.Caused by Switch Overtravel.Rps Power Supply Select Switch Returned to Normal Position & Scram Reset + (ML17285A433)
- ML17285A434 + (ML17285A434)