ML17285A332
| ML17285A332 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/28/1989 |
| From: | Hutchison L, Powers C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8903220263 | |
| Download: ML17285A332 (9) | |
Text
gc CELEBRATED Dl BUTiON DEMONS TIOYi SYSTEM REGULATO NFORMATION DISTRIBUTION TEM (RIDS)
A1 ac DOCKET FACIL:50;$97 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1989.W 890309 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL 3 SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTHiR INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DREP/RPB 10
@KG= --
01 EXTERNAL: EGGG SIMPSONiF LPDR NSIC COPIES LTTR ENCL 1
0 1
0 10 10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PDS PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 iNUDOCS-ABSTRACT RGN5 EGGG WILLIAMS,S NRC PDR COPIES LTTR ENCL 5
5 1
1 2
2 1
1 1
1 1
1 1
1 1
1 NCTE 'IO ALL 'KIDS" RECIPIEFK:
PZZASE HELP US TO REDUCE HASTE!
CGPI'ACT 'IHE DOCXIMEWZ CXWIK)L DESK RQCN Pl-37 (EXT. 20079)
KO ZZZMZNRm YOUR KAME FBCN DDKBIHKION LISTS MR DOCUKEWIS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 32 ENCL 30
OPERATING DATA REPORT WNP-2 01-Mar-89 i.
DOCKET: 50-397 2.
REPORTING PERIOD:
- 3. 'TILITY CONTACT:
FeI3-89 OUTAGE + ON-LINE HOURS LEONARD HUTCHIBON (509) 377-2486 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
3323 1200.9 1100 1140 1095 10 ~
POWER TO WHICH RESTRICTED'F ANY (NET MWe) 11.
REASONS FOR RESTRICTIONS~ IF ANY:
N/A 12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14 RX RESERVE BHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18 GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25 FORCED OUTAGE HOURS MONTH 672 652.2 0.0 631.1 0.0 1593600 522890 502226 93.9/
93.9/
68.3/
67.9%
6.1/
40.9 YEAR CUMULATIVE 1416 369'20.2 1284.2 27501.7 0.0 340.4 124'9.4 26414.0 0.0 381.7 3511000 72622205 1166370 24199870 1122742 23291050 88.2/
71'/
88.2/
72.6/
72'/
57.6/
72.1/
57.3/
6 ~3/
9 5l 83.6 2775.2 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE~DURATION):
27 IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
N/A 8903220263 890228 PDR ADOCK 05000397 R
PNU
~ed $
i/i
F
~
~ g 1
W
'I
~ I p Pi
BEKAT PERIOD FEB 1989 men th, year LAIT Sf IUTDOi'iNS / REDUCTIONS DOCKET NO.
UNIT NNIE OnTE COMPLETED DY TELEPl ONE 50-3 WNP-2 3/1/89 LB HUTCHISON 86 BG.
I>inE Xiii IKiT8 HUIS
~t.
1i0 89-02 1-30-89 "F
30.4 A
4 89-03 2-2-89 F
10.4 iZCRO
<<W ul llÃf EB ELECON HF 'ZZZ CONCLUDED OUTAGE WHICH RESULTED FROM A FAULT ON AN INSULATOR IN SWITCHYARD.
THE INSULATOR
'AS REPLACED AND REMAINING INSULATORS WERE CLEAN D.
GENERATOR WAS REMOVED FROM SERVICE DUE TO MAIN CONDENSER VACUUM PROBLEMS; LOW VACUUM WAS CAUSED BY HIGH CONDENSATE TEMPERATURE AS A RESULT OF COOLING TOWER PROBLEMS.89-04P 2-.18-89 S
0 RB CONROD REDUCED POWER TO PERFORM A SCHEDULED CONTROL ROD SEQUENCE EXCHANGE WNP-2 ENTERED THE MONTH SHUTDO'HN.
SUBSEQUENTLY RETURNED TO POWER OPERATION AND INCURRED 1 FORCED OUTAGE S 't'Y AND 1 POWER REDUCTION IN FEBRUARY AS DESCRIBED ABOVE.
TYPE F-Forced S-Schcd A-Equip Failure 0-Maint or Test
~
C-Ref ue ling O-Beg<>la tory Des triction E-Operator Training h License Examination F-Admin 0-Oper Error H-Other l-Manual 2-Manual Scram 3-lhtto Scram 4-Continued 5 neducod Load 9-Other SYSTEM k COMPON:.NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LiEA) File (NUBEG-0161)
r e
MONTH FEBRUARY 19 DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 17.
DOCKET 'NO.
50-397 UNIT WNP"2 DATE 3/1/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POWER LE VEL (MwE-Net) 81 2.
3.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
49 722 793 816 820 825 826 825 811 824 824 824 822 825 819 18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
536 58 823 821 820 821 821 827 826 823 824 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
'f These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'X line (or the restricted power level line).
In such
- cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 March 9, 1989 U.S. Nuclear Regulatory Commission Document~ Control Desk:
Washington, D.C.
20555
Dear Sir:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for February 1989 as required by our Technical Specifications 6.9.1.6.
Very Truly Yours, C.
M.
owers (M/D 927M)
WNP-2 Plant Manager CNP/lc Enclosure cc: Nr.
Nr.
Ns.
Nr.
Nr.
J.
B. Martin G. J.
Bosted Dottie Sherman J. T. Wheelock W.
H. Lovelace NRG Region V
NRG Site Representative (901A)
ANI, Farmington GT INPO NRG, Washington D.C.
~
~
~