Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17215A837 + (ML17215A837)
- ML17215A838 + (ML17215A838)
- ML17215A840 + (ML17215A840)
- IR 05000219/2017002 + (ML17215A841)
- L-85-153, Forwards Revised Procedures Generation Package & Listing of All Locations of Items Identified in Draft Ser,Per NRC + (ML17215A845)
- ML17215A846 + (ML17215A846)
- ML17215A847 + (ML17215A847)
- ML17215A849 + (ML17215A849)
- L-85-154, Advises That Unmodified Batch B Assemblies Will Not Be Used Beyond Cycle 2 Operation,In Response to NRC . Addl Shoulder Gap Measurements Unnecessary + (ML17215A850)
- L-85-160, Forwards Fee for 841203 Application for Amend to License DPR-67 to Incorporate NUREG-0737 Tech Specs,Per Generic Ltr 83-37 + (ML17215A851)
- L-85-158, Forwards Sea Turtle Intake Entrapment Studies, Per Section 4.2.2 of App B to Environ Protection Plan.Netting Technique Will Be Continued,Per 840411 Recommendations from Meeting W/Natl Marine Fisheries Svc + (ML17215A858)
- ML17215A859 + (ML17215A859)
- ML17215A861 + (ML17215A861)
- ML17215A862 + (ML17215A862)
- ML17215A864 + (ML17215A864)
- ML17215A866 + (ML17215A866)
- ML17215A868 + (ML17215A868)
- ML17215A869 + (ML17215A869)
- ML17215A871 + (ML17215A871)
- ML17215A872 + (ML17215A872)
- ML17215A874 + (ML17215A874)
- ML17215A876 + (ML17215A876)
- L-85-199, Forwards Response to 841207 Request for Addl Info Re Proposed Amends to Licenses DPR-67 & NPF-16 + (ML17215A885)
- ML17215A886 + (ML17215A886)
- L-85-201, Informs of Completion of Rev 1 to First 10-yr Insp Plan. Distribution of Class 1 Butterwelds Changed Due to Potential for Stress Corrosion Cracking in Pressurizer Spray Piping & Evaluation to Assure Adequate Representation + (ML17215A887)
- L-85-194, Advises That Mi Cable Qualification Test Rept Completed & Applicable Procedures Re Inadequate Core Cooling Sys Implemented Per Commitment in .Tech Spec for Heated Junction Thermocouples to Be Submitted by June 1985 + (ML17215A890)
- L-85-210, Requests Mod of 840614 Confirming Orders Requiring Implementation of Upgraded Emergency Operating Procedures by 850701.Implementation of Emergency Operating Procedures Not Expected Until 860115 Due to Required Validation & Training + (ML17215A894)
- IR 05000244/2017002 + (ML17215A899)
- ML17215A915 + (ML17215A915)
- ML17215A924 + (ML17215A924)
- IR 05000277/2017002 + (ML17215A932)
- IR 05000280/2017403 + (ML17215A946)
- IR 05000338/2017404 + (ML17215A956)
- ML17215A968 + (ML17215A968)
- IR 05000373/2017002 + (ML17215A986)
- 05000324/LER-1917-003, Regarding Setpoint Drift in Main Steam Line Safety/Relief Valves Results in Three Valves Inoperable, + (ML17215A990)
- ML17215B011 + (ML17215B011)
- ML17215B012 + (ML17215B012)
- ML17215B013 + (ML17215B013)
- ML17215B014 + (ML17215B014)
- GO2-17-139, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report + (ML17215B031)
- ML17215B036 + (ML17215B036)
- ML17215B037 + (ML17215B037)
- ML17215B047 + (ML17215B047)
- ML17215B277 + (ML17215B277)
- ML17215B283 + (ML17215B283)
- ML17215B287 + (ML17215B287)
- IR 05000027/2017201 + (ML17215B522)
- GO2-17-141, Reply to a Notice of Violation; EA-17-028 + (ML17215B630)
- ML17215B792 + (ML17215B792)
- ML17216A006 + (ML17216A006)