Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-498, Advises of Postponement of Auxiliary Feedwater Logic Cabinet Installation Until Fall 1984 Fuel Outage.Mod Per Commitment to NUREG-0737 Incorporates Automatic Isolation of Faulted Steam Generator + (ML17213A700)
- L-82-496, Forwards Modified Responses to Items Submitted in ,Based on 821103 Telcon W/Nrc Re Control Room Design Review Per SER,NUREG-0843.Updated Status of Items 3.1 - 3.8 of Summary Human Engineering Rept Encl + (ML17213A702)
- ML17213A703 + (ML17213A703)
- ML17213A704 + (ML17213A704)
- ML17213A705 + (ML17213A705)
- ML17213A709 + (ML17213A709)
- ML17213A711 + (ML17213A711)
- ML17213A715 + (ML17213A715)
- ML17213A717 + (ML17213A717)
- ML17213A727 + (ML17213A727)
- ML17213A729 + (ML17213A729)
- ML17213A731 + (ML17213A731)
- ML17213A732 + (ML17213A732)
- L-82-511, Forwards Addl Info on Response to Seismic Qualification Review Team & Pvort Audit Findings,For Insertion in Util .Field Surveillance Confirmed Air Line Restraints Installed + (ML17213A735)
- ML17213A741 + (ML17213A741)
- L-82-513, Forwards Const/Startup Progress Update for Oct 1982.Fuel Load Target Date of 821028 Met + (ML17213A742)
- L-82-515, Confirms 821112 Telcon Agreement W/Util to Discontinue Hot Functional Testing of Reactor Vessel Internals Intended Solely to Increase Vibratory Cycles on Plant + (ML17213A743)
- ML17213A748 + (ML17213A748)
- ML17213A754 + (ML17213A754)
- ML17213A756 + (ML17213A756)
- ML17213A757 + (ML17213A757)
- L-82-516, Advises That Util Does Not Intend to Provide Separate Meteorological Instrumentation for Facilities Since Equipment in Place Meets NRC Meteorological Monitoring & Emergency Planning Criteria (NUREG-0654) + (ML17213A758)
- ML17213A759 + (ML17213A759)
- ML17213A760 + (ML17213A760)
- ML17213A762 + (ML17213A762)
- ML17213A767 + (ML17213A767)
- ML17213A769 + (ML17213A769)
- ML17213A775 + (ML17213A775)
- ML17213A789 + (ML17213A789)
- ML17213A790 + (ML17213A790)
- ML17213A795 + (ML17213A795)
- ML17213A840 + (ML17213A840)
- IR 05000133/2017002 + (ML17213A861)
- ML17213A863 + (ML17213A863)
- ML17213A873 + (ML17213A873)
- ML17213A874 + (ML17213A874)
- L-82-530, Forwards Revision to Re post-accident Sampling Sys.Completion Date Will Be Changed from Prior to Exceeding 5% Power to Prior to Initial Criticality + (ML17213A877)
- L-82-533, Forwards Response to Request for Analysis of Limited Small Feedwater Line Break W/Assumption of Single Failure & Availability of Offsite Power,To Verify That Sys Pressures Will Not Exceed 120% of Design Pressure + (ML17213A878)
- ML17213A881 + (ML17213A881)
- ML17213A882 + (ML17213A882)
- ML17213A883 + (ML17213A883)
- ML17213A885 + (ML17213A885)
- L-82-526, Forwards Resubmittal of Mechanized Preservice Exam of Selected Components of St Lucie Plant,Unit 2. Attachment Updates 821110 Submittal Which Had Missing Pages + (ML17213A886)
- ML17213A887 + (ML17213A887)
- ML17213A888 + (ML17213A888)
- ML17213A900 + (ML17213A900)
- ML17213A902 + (ML17213A902)
- ML17213A903 + (ML17213A903)
- ML17213A904 + (ML17213A904)
- L-82-534, Forwards Responses to Issues Raised in Environ Qualification Branch Review of Program.All safety-related Equipment Will Be Qualified Per NUREG-0588 by First Refueling + (ML17213A905)
- L-82-536, Forwards Responses to 820913 Request for Addl Info Re Degraded Grid Voltage Protection,Questions 1-4.Proposed Tech Spec Change to Verify Load Shedding of Emergency Busses Not Warranted Since Present Test Adequate + (ML17213A906)