8 Docket Ho.:
50-389 APPLICAHT:
Florida Power and Light Company, (FPSL)
FACILITY:
St. Lucie Plant, Unit 2
SUBJECT:
SUNIARY OF I'1EETING HELD IH BETHESDA NRYLAHD WITH FP5L ON OCTOBER 21, 1982 REGARDING CONTROL ROON DESIGN REVIEW /TENS A meeting was held on October 21, 1982 bete>een the NRC and FPSL to discuss human engineering discrepancies (HED) and the actions to be taken.
The results of the discussion for each HED is provided in the attachment.
lg Victor Nerses, Project Itanager Licensing Branch No.
3 Division of Licensing Encl osu} e:
As stated cc:
See next page 8211170521 8211'08' j"'c~
-PDa-ADDCa 0SOOoa89 A,
PDR OFFICE/
SURNAMEP OATE P DL:LB 3
~ o~i ~
~r)t ~ ~ o
~ ~ ~ ~ ~ ~ ~
VH5Vs'"1T/)"782""'
ton
"'I':7t'7HP"'"'
I
~
~ ~ ~ ~ 0
~ ~ ~ ~ 0 ~ ~ 0 ~ ~ ~ ~ ~ ~ 0 ~ 0 ~
r ~ ~ ~I ~\\ ~ 0 ~ ~
~ ~ ~ ~ ~ ~ 0 ~
~ 0 ~
~ 0 ~ ~ ~ 0 ~ 10 ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ ~ 0
~ 0 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQPO: 1981~960
e 3
ST.
LUCIE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P. 0.
Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad 8 Toll 1025 Connecticut Avenue, N.N.
Washington, D.
C.
20036 Norman A. Coll, Esq.
Steel Hector 5 Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N.
E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 S'outh AlA Jensen Beach,"Flordia 33457 Regional Adminstrator - Region II U. S.
Nuclear Regulatory Commission 101 Marietta Street Suite 3100, Atlanta, Georgia 30303
gt
Attendees October 21, 1982 HRC Staff Ann Ramey-Smith R. J.
Eckenrode Steve Eirod Kerry Landis Dennis Serig Y. Nerses Essen Cor Cliff Baker FPSL J.,Sheetz R.
Sweeney E.
H. Roger Hark Tagliamonte
~
~
\\
Document Control (5
3Bg)
NRC PDR L PDR NSIC TERA-LB>3 Reading J.
Lee G. Knighton Project Manager VNerses
- Attorney, OELD E. L. Jordon Regional Administrator, Region J.
M. Taylor MEETING
SUMMARY
Xov8 198~
PARTICIPANTS NRC Ann Ramey-Smith R. J.
Eckenrode Steve Eirod Kerry Landis Dennis Serig VNerses
v I
l I
~f
Part A
~ lg h t
~u C-'3 HUTQH ENGINEER IHG DISCREPANCIES TO BE CORRECTED PRIOR TO ISSUANCE OF AN OPERATING LICENSE This section contains a description of those discrepancies which must be corrected prior to issuance of an operating license.
Following each discrepancy is a statement of the Florida Power and Light Company's (FPL) commitment for corrective action.
A. 1.0 CONTROL ROON WORKSPACE I IHDING h.1.1 There are two large floor obstructions in the form of thick plywood sheets attached to the floor One is between the control console mockups and one is near the restroom location.
(l.2)"
RESPONSE
'I a gi 2
FINDING A.1.2 The plywood sheets referenced in the above finding are presently covering two blockouts which will.be used as control cable routine paths.
The blockout located between the control console mockups will be covered by the operator's work desk and will not provide a
traffic interference problem.
The second blockout located near the restroom was provided for the positioning of the auxiliary control panel and will not provide any traffic flow restrictions.
Presently a review is being conducted for relocating the auxiliary control panel.
If the panel is relocated, then the subject blockout will be filled thus eliminating the IrippIng hazard.
The temporary phone attached to Panel 202 has a long cord which presents a tripping hazard in an operator pathway.
It was noticed that phone cords in Unit 1 presented a similar tripping hazard.
(1 3)
RESPONSE
lIHDIHG The temporary phones'will be removed and the permanent communication system will be installed prior to issuance of an operating license thus eliminating the subject tripping hazard.
A. 1.3 There are no provisions for key storage and no procedures for key access control for keys used in the Control Room and for keys used at the Remote
.hutdown Panel.
(li6)
'Throughout the report the use of parentheses, such as (1.4), refers to the
, section and finding +umber used in the HFEB Control Room Design Review/Audit report, dated September 10, 1981.
St.
Lucie'SSER fI1 C-3
Part A
RESPOHSE F IUDIHG Key storage will be provided as well as the necessary key access control procedures for those keys used in the Control Room and Remote Shutdown Panel prior to fuel load.
The Remote Shutdown Panel SIS block keys will be maintained at RAB control access point.
A.l. 4 All of the panels had controls which were less than 3 inches from the front edge of the benchboard.
The benchboard hardrails had not been installed at Unit 2 at the time of the review.
It was noted that the Unit 1 benchboard rails obscure the view of many controls and displays from the operator console.
(1. 10)
RESPONSE
FINDING The St. Lucie Unit Ho.
2 handrails will be installed at a lower position on the subject benchboards'o as to not obscure the view of those controls and displays, which are located on the front edge of the benchboards,
.rom the operator console.
The handrails will be installed prior to issuance of an operating license.
A.1.5 The normal lighting level in the backpanel areas was inadequate.
The level at Backpanel 206 was 5.5 ft-candles, which is even less than the minimum requirement of 10 ft-candles for a passageway.
(1.12)
RESPONSE
FINDING Incident light levels will be reviewed and brought up to acceptable levels as outlined in HUREG-0700.
fhis item will be scheduled for implementation prior to issuance of an operating license.
A. 1.6 Glare was a problem throughout the control room.
At the time of the
- review, no di ffusing grid had been placed over the fluorescent lighting as has been done in Unit 1.
The glare in Unit 2 had a varying impact from one instrument to the next, with the worst case being nearly total obscuration of displayed informaton.
(1. 13)
RESPOHSE A re-evaluation of the glare problem will be performed after the diffusing grid has Seen installed.
Those items. then still found to.
have glare problems will have suitable backfits implemented prior to issuance of an operating license.
St.
Lucie SSER Nl C-4
Part A
FINDING A.1.7 There is no direct means of testing the operability of control room emergency lighting.
(1.14)
RESPONSE
FINDING There will be a direct means of testing the operability of the.
control room emergency lighting system prior to issuance of an operating license.
A. 1.8 The emergency lighting illumination levels were too low for accurate reading of panel di'splays and labels.
Readings varied from 22.6 to 1.9 ft-candles.
The Panel 204 reading was 8.3 ft-candles.
(1.15)
RESPONSE
FINDING Lighting diffusers were not installed at the time of the audit.
Upon installation, incident light readings will be taken.
Based on data from the above, additional lights, as required, will be installed to bring emergency control room illumination to acceptable levels 'as outlined in HUREG-0700.
This item will be scheduled for implementation prior to issuance of an operating license.
A. 1.9 The two separate Control Transfer Panels for the Remote Shutdown Panel are not provided with, security devices to prevent unauthorized transfer of control between the Control Room and the Remote Shutdown Panel.
(1. 16)
RESPONSE
The Remote Control Transfer Panels will have a security seal for security purposes.
Operations of any control transfer switch is annunciated in the control room.
These provisions will be implemented prior to issuance of an operating license.
k A. 2. 0 CON1UNICATIOHS FINDING A.2.1 The communications equipment and procedures for Unit 2 were not completed and could not be evaluated.
(2. 1)
RESPONSE
The SL-2 communications system is currently under design.
The system will be reviewed in accordance with the communications section of HUREG-0700.
This item is scheduled to be implemented prior to issuance of an operating license.
St.
Lucie SSER ifl C-S.
~
i
~,I l
I
~ >>
Part A
A.3.0 AHHUHCIATORS Q ~R>>>> ~fS FIIIOIIIO
. A.3.1 The function of the annunciator tile labeled ANNUNCIATOR POWER SUPPLY on annunciator Panel i( is not clear.
(3.1)
RESPONSE
The tile will be re-engraved to read "Annunciator Backup Power Supply" prior to the issuance of an operating license.
2 bl F IHDIHG A.3.2 There are no annunciators for the HYDRAZTHE system.
(3. 2)
RESPONSE
Results of an engineering review of the system have identified any/all required annunciators for the Hydrazine system.
These will be added to the annunciator system prior to issuance of an operatng license.
FINDING S
A.3.3 Some annunciator tiles with multiple inputs do not have reflash capabi 1 ity.
(3.4)
RESPOIISE E3 Q bi JOE 8>>'o Vl,(>>l&
R
~
FINDING Hultiple input annunciator windows will undergo assessment as to reflash capability.
Any that do not "reflash" and require the function will be provided with the "reflash" and "reaudible" function.
This item will be reviewed and implemehted prior to issuance of an operating license.
R, A.3.5 The annunciator audible alarms are only marginally louder than the ambient noise in the control room.
(3.8)
RESPONSE
bl I
FINDING The volume, frequency, and modulation of annunciator audible are adjustible.
Audible signal characteristics will be manipulated to conform to the NUREG-0700 guidelines prior to issuance of an operating license.
s4 Kl~4 VO
~< \\
O '%EV>>>>>>>>
~I El A.3.6 The annunciator audible alarm devices for Panels
- 201, 203, and 205 are located behind the panels, maki'ng it difficult for operators to localize the source of an alarm.
(3.9)
'>>I >>
St. Luc!e SSER Nl C-6
Part A
I q C-v
RESPONSE
F INOIHG A.3.7 The sound sources will be mounted such that signals will propagate directly into the control area without having to pass through the control room boards.
This item will be implemented prior to issuance of an operating license.
The annunciator illumination system does not ensure that an indication of alarmed conditions will be provided to the operator if failure of an annunciator light flasher occurs.
In case of flasher failure of an alarmed tile, the tile light should illuminate and burn steadily.
(3. 10) bl r&4.VI) ~ i Cb 5 s v lvL
~
I IHDIHG
RESPONSE
Each annunciator panel has a test function which illuminates every window and verifies the flasher function.
Any dark window indicates bulb or annunciator failure.
Any annunciator that does not flash has a failed flasher.
The test will be performed once a shift.
A.3.8 ttone of the annunciator panels in the control room have labeling of their vertical or horizontal axes to aid in matrix location and identification of individual tiles.
(3.12)
RESPONSE
~<5k) ii caL (a
r 5
tQ 4Dtv Y'i v) Quest FINDING tkatrix type location cues will be added to the annunciator panels and annunciator response procedures.
This item will be implemented prior to fuel load.
s~ sg A.3.9 Blank annunciator tiles on almost all annunciator panels are illumi-nated during normal operation.
(3.13)
RESPONSE
FINDING A.3. 10 Blank annunciator tiles will be extinguished.
This will be accom-plished prior to fuel load.
Nany annunciator tile legends are wordy..Some tiles have as many as 14 words.
(3. 14)
RESPONSE
bl 54 C
Annunciator verbiage is being reviewed and will be limited in content in accordance. with NUREG-0700.
St.
Lucie SSER Nl C-7
FINOING A.3. 11 Part A
Annunciator tiles are to be re-engraved, using standardized abbrevia-tions and syntax, limiting number of words/abbreviations per tile.
This item is scheduled for implementation prior to issuance of an operating license.
Annunciator font size (0.2 inches in height) is too small for reliable reading from the operator annunciator control positions.
(3.15)
RESPOIISE i,q.
.1 EE 4 "i
~C$
C XEW ~/11 lt RP 4E bl 4C
\\)
Ccv co-
-~
'Qc R~ na
~~44Js IZ 4 FP4L ~.((
~
.I ~
R C
Vlcp a
1 m Epc
<RR~~
1 c
C FIIIOIIIR A.3. 12 F INOING A.3. 13 Annunciator tiles are to be re-engraved, using larger, more readable font.
This item is scheduled for implementation prior to issuance of an operating license.
The space between legend lines on annunciator tiles is less than 1/2 the character height.
(3.17)
RESPONSE
The space between legend lines on the annunciator tiles will comply with NUREG-0700.
This item will be implemented prior to issuance of an operating license.
One annunciator board on the Line Repeat Panel has two redundant sets of controls located within 12 inches of each other.
(3.18)
RESPOIISE
~ P 3.g
'I ~ El J
1 CCNPI.
C k( ~'(
E~ 4cu.k Ya~ o~we vA~LI 4 > > ~Z
~ "
Cl F
One set of annunciator controls will be removed prior to fuel load.
1 ~
RP C
FINDING A.3. 14 There are no separate silencing controls on any annunciator control systems.
(3. 19)
.s4.
l Ci
~ rE
~ II I
C+
C E
Florida Power and Light intends to install a three second automatic annunciator master silencer on Unit No.
2 prior to issuance of an operator license.
The three-second master silencer would automatic-ally silence the incoming audible alarm after three seconds giving the operator sufficient time to glance at the incoming alarm to determine its significance; however, still allowing him freedom to continue the task at hand until such time as he could reset the sub-ject alarm.
After the audible signal is silenced it would be reactivated and the process r epeated for an incoming alarm.
St.
Lucie SSER lI1 C-8
Part A d
FINDING A.3.15 'he relative=-location of annunciator control button groups is not the same from panel to panel and the annunciator control buttons are not arranged in the same order in the control group at each panel.
(3.20)
F IHOIHG.
RESPONSE.
The annunciator control button will be located such that they are in the same configuration in the control group as each panel and where possible they will be placed in the same general locale on the subject panels.
In addition, these controls will be demarcated to assist in distinguishing them from other control push buttons.
This backfit will be implemented prior to issuance of 'an operating license.
A.3.16 Annunciator Panel N contains a tile with a temporary label.
The WASTE NAHAGEHEHT LOCAL ALARH GROUND DETECTEO POWER FAILURE tile label is handwritten on the face of the tile.
(3.21)
RESPONSE
The subject tile will be engraved in accordance with the annunciator tile lettering specification to be issued as part of the annunciator labeling review which is scheduled for engineering completion prior to fuel loading.
A.4 0 CONTROLS FIHOIHG A.4.1 Some controls needed to perform system operating tasks are not in the control room.
(4. 1)
Examples:
a)
Auxiliary Feedwater Pump Start Bypass control b)
Condensate Puay 2C control
RESPONSE
a)
Auto-start of the Auxiliary Feedwater System has not been installed.
The future design will include the start bypass control and will be implemented prior to issuance of an operating license.
b)
Condensate pimp 2C is a spare pump used when pumps 2A or 2B are out of service for maintenance.
2C pump is manually aligned to either the 2A or 28 4160 bus, depending on which pump it is St.
Lucie SSER ill
, C-9
Part A
~
~
~ 'I FINDItfG replacing.
The control switch for that associated pump then becomes the control switch for 2C pump.
No further action is required on this item.
A.4.2 Some process controllers on Panels 205 and 206 have inoperative OPEN/CLOSE pushbuttons that are disconnected and have no control function. '4.3)
Examples:
bj co gg~~ ~ ((c Ai ~
a)
HIC-3618 b)
HIC-3628 c) flIC-3638 d)
HIC-3648 e)
SI Loop 2AZ Check Valve Leakage IIESPDI5E
~ The non-functional control buttons will be removed and the holes blanked.
This item will be completed prior to issuance of an operating license.
FINDING A.4.3
'I fhe Turbine Trip pushbutton is not protected to prevent unintentio'nal operation.
(4.4)
RESPONSE
Jfkf I
bl
('
I SI CJ4 I
II'mI ~
FINDING A.4.4 An elevated switchguard will be provided on this switch.
This will be implemented prior to fuel load.
The SI Loop Check Valve Leakage HIC-3638 process controller operates in reverse of the conventional operation of other process controllers in the control room.
(4.5)
- IESP01IE
~/8 ff J
bl These control buttons are not functional and will be removed and the holes covered prior to issuance of an operating license.
FINDING A.4.5 Some rotary switches do not conform to the OPEN-Right (Clockwise)/
CLOSE-Left (Counterclockwise) convention for switch positions.
(4.6)
=xamples:
a)
Generator tlo.
2 switch on Line Repeat Panel has OPEN-Left/CLOSE-Rightpositions.'/Z4 l
Z St.
Lucie SSER foal
-C-IO
Part A
FINDING b)
Turbine Drain Valve controls on Panel 201 have OPEN-Left/AUTO-Center/CLOSE-Right positions.
c)
Loop 2A2 and Loop 201 Charging Line Valve controls have RESET-Left/CLOSE-Hiddle/OPEN-Right position~.
RESPOIISE present Florida Power and Light convention is:
(1) Valve control switches operate such that open is to the right and closed is to the left with red lights indicating flow/opened and green lights indicating no flow/closed.
(2) Breaker control switches to operate such that closed is to the right and open/trip is to the left with red lights indicating energized/closed and green lgihts indicating de-energized/
open.
In addition, the convention is to have the green indicating lights on the left of the control switch and the red indicating lights on the right.
Shape coding of breaker control handles, i.e.,
thumb switches will be used to reduce operator confusion.
The control board is scheduled to be reviewed for consistency of convention application with discrepancies resolved prior to issuance of an operating license.
The turbine drain valve control on panel 201 will be corrected to conform to the above mentioned convention prior to issuance of an operating license.
A.4.6 Some keyswitches have a black ring that might be interpreted as a
color code while other keyswitches do not.
There is no apparent significance of this difference.
(4. 7)
RESPONSE
FINDING The black rino indicates that the valve is "Locked Open."
Absence of the black ring means the valve is "Locked Closed."
One valve does not conform to this, and will be changed prior to fuel loading.
The backlit legend pushbuttons and the backlit legend indicator lights in several arrays on Panels 201 and 202 are identical in appearance,
- size, and shape.
Control/display substitution errors are possible.
(4. 9)
Examples:
a)
OEH Valve Test panel b)
Generator Megavar displays c)
Diesel Generator controls and displays St.
Lucie SSER /f1 C-11
Part.A
RESPONSE
FINDING This finding will be addressed and resolved through control and display labeling and coding.
Implemention will be complete prior to issuance of an operating license.
A.4.8 Covers on backlit legend pushbuttons and indicators are interchange-able and are not coded to identify their correct location in the control/display arrays.
(4.10)
RESPONSE
FIHOIHG Identifying markings will be placed on the removable portion of the units and the housing, thereby identifying the appropriate positions of removable control or display units.
This item will be implemented prior to issuance of an operating license.
A.4.9 Some keyswitches do not conform to the keyswitch orientation convention used in the control room.
(4. 11)
Examples:
a)
Hinimum Flow Header A Isolation.Valve V-3496 switch on Panel 206.
b)
OEH Turbine Control OPC switch on Panel 201.
RESPONSE
Keyswitch positions will be oriented to be consistent with Control Room conventions (key teeth down) and backfits implemented prior to fuel loading.
FINDING A.4.10 Rotary switches and keyswitches have unlabelled positions.
(4.12)
Examples:
a)
SIAS Block Channel SA and SB keyswitches on Panel 206 b)
HSIS Block Channel SA and SB keyswitches on Panel 206 c)
Trip Circuit Reset rotary switches on the RPS Panel
RESPONSE
These positions will be labeled prior to issuance of an operating license.
St.
Lucie SSER 81 C-12
0 l
a n
l r
s I
~ S I
Part A F IHDIHG A.4.11 Rotary selector switches on Panel 201 have pointers engraved in the switch handle that are not marked with a contrasting color to make them readable.
(4. 16)
Examples:
a)
Exciter Supply Breaker b)
Generator Ground Detector c)
Voltage Adjuster d)
Base Adjuster
RESPONSE
The switch handles will be provided with high contrast pointers.
This item will be implemented prior to fuel loading.
A.S.O OISPIAYS F IHDIHG A.5.1 Assuming its label is correct, the AUX FEEDWATER HDR C FLOW/PRESSURE indicator FI-09-ZC/PI-09-BC on Panel 202 should display values of two different variables.
The installed meter can displa 1
variable.
(5. 1) an isp ay on y one
RESPONSE
The correct meter will be capable of displaying both variables.
The proper indicator will be installed prior to fuel loading.
'"ct'~ a 4(q i 5
Al bl
~I C
c o-
-~
5 gEY ~
)
~ 'EV~
~
PIIIOIIIG A.5.2 PINGING 5
A.5.3 There is no distinction between the three backlit indicators labeled HI POWER TRIP on the RPS Hatrix Test Panel nor between the two indicators labeled HI RATE.
(5.2)
RESPONSE
be im lem The above components will be appropriately labeled.
Th t
e e
is i em will emented prior to issuance of an operating license.
PR-25-1A PR B The data channel identification labels for HVAC P 1 t d
ane ren recorders
-I, and PR-25-2 do not indicate which recorder scale recorders.
(5.3) to use with each variable displayed on the multi-range multi-h 1
'-c anne S2 s~H l
5;3 "lcd]
2 Rw
\\
C
~
Si 4Pll'VP
)=
s
~I P
St.
Lucie SSER Nl C-13
t
~
4 8
P f
1
RESPONSE
- Part, A
l ER. Rl
$J 4
RP Vj FINDING A.5.4 F IHOIHG A.5.5 FINDING A. 5.6 The scales for the above will be appropriately labeled and identified.
Tpis item will be implemented prior to issuance of an operating license.
On Panel 201, the GENERATOR EXCITER FIELD OC VOLTS meter scales are not marked to indicate positive and negative values.
(5.4)
RESPONSE
The display will be appropriately labeled "Voltage Regulator Hull Heter."
This will be accomplished prior to fuel loading.
On Panel 201, the VIBRATION PHASE ANGLE HETER VBI-22-1 and the ECCENTRICITY PHASE AHGI.E llETER ECC-22-1 do not have indications of positive or negative above and below zero.
Also, their scales are graduated in 10's above zero and in 30's below zero.
(5.5)
RESPONSE
The extreme values for these displays will be appropriately labeled.
These are standard meters, throughout all Florida Power and Light power plants and to change them could have a negative effect.
This labeling effort will be completed prior to fuel loading.
The LEO displays generally have poor readability due to glare, scratchable face plate surfaces, and poor contrast.
(5.8)
Example:
a)
LItlE REPEAT PANEL b)
PANEL 203 c)
HEGAVAR PANEL d)
PRESSURIZER PRESSURE
RESPONSE
Glare and potential face plate scratching will be addressed through display shielding to reduce incident light to the display surface and protect face plates.
Oisplay contrast will be further evaluated and reported on within the reporting requirements of HUREG-0700.
bl
~ P St.
Lucie SSER Nl C-14
Part A
FIttDIttg A.5. 7 Several meters, primarily G.E. circular meters, have confusing scale markings..
The scale spacing is non-linear and there are no graduations near the zero marking on the meter scale.
Also, it is not clear what downscale meter pointer position indicates a meter failed condition.
(5.10)
Example:
a)
GEttERATOR ANPERES AN-88108 and AM-8810C on Panel 201 b)
GEttERATOR KILOVOLTS VN-881
RESPONSE
These meters are not operated at the lower ranges.
The scales are such that accuracy and readability are of high quality in the normal operating range.
Downscale meter position will be reviewed as part of the long-term design review.. Normal operating ranges will be-marked on the meter face.
FINDING A.5.8 Several meter scales have thick black marks to extend major tick mapks to the scale numerals.
These marks give the misleading appearance of minus (-) signs in front of the meter scale numerals.
(5.11)
Examples:
(HVAC Panel )
a)
PDIS-25-18 b)
PDI-25-158
RESPONSE
The marks viewed as being interpreted as minus (-) signs will be removed.
This will be accomplished prior to fuel loading.
FIIIGIGG A.5.9 There are several displays which use unconventional scale graduations.
(5.12)
Examples:
a)
Panel 201:
DIESEL GENERATOR 28 NVARS YARN-1616 b)
Panel 204:
WIDE RAttGE X POWER JI-0018 c)
Panel 203:
LOOP 2A COLD LEG TENP TIC-ill d)
Diesel Gen 28 Frequency St.'ucie SSER Ill C-15
g J
e
Part A
F INOING
RESPONSE
The displays listed in the finding will be modified as follows Heter faces will be color coded to reflect normal operating ranges prior to issuance of an operating license.
Oisplays will be reviewed for scale convention during the long-term control room review and reported on in accordance with HUREG-0700.
A.5.10 Green FPL tape (denoting equipment turnover to FPL) and meter calibra-tion.certification stickers obstruct labels and meter scales in several places and generally clutter the appearance of the boards.
(5. 13)
RESPONSE
FIHOJNG The above clutter will be removed prior to plant low power operation and after system turnovers have been completed.
A.5.11 On the Line Repeat Panel there is either a reversal of Green-Left/
Red-Right convention of indicator light positions or the colored lamps are incorrectly installed.
(5.15)
RESPONSE
~
The lamps have been reversed to conform to the predominant control room convention.
FIII0 IIIG A. 5. 12 There is a widespread use of amber and blue colors for electrical system status lights while.a red/green/amber convention is used on most other systems in the control room.
(5. 16)
RESPONSE
FINOIHG A lighting color convention will be established with implementation prior to issuance of an operating license.
A. 5. 13 The CONTAINMENT H2 PURGE CONTROL VALVE FCV-25+ on the HVAC Panel violates the conventional color coding of indicator lights by using green to indicate OPEN and red to indicate CLOSEO.
(5. 17)
RESPONSE
The lights have been changed to conform to the control room color convention.
StG Lucie SSER Nl C-16
~
~
4 II
Part A
FIHDIHG A.5.14 On Panel 203, the PRESSURIZER PRESSURE NETERS PIC-1105 and PIC-)106 indicate an increase in pressure by a downward movement of the pointer.
(5. 18)
RESPONSE
The meters will be rotated and new scales installed such that they indicate an increase in pressure by an upward movement of the pointer.
This item will be implemented prior to issuance of an operating license.
F INGOING A.5.15 t'IHDING A. 5. 16 FIttDIHG On process controller vertical scales, circular meters, and large horizontal trend recorders, the pointers obscure scale numerals.
(5.19)
Example:
a)
GEHERATOR TENPERATURE TR-22-30
RESPONSE
ttormal operating bands will be marked on meters prior to issuance of an operating license.
The obscuration of numerals will be reviewed as part of the long-term evaluation in accordance with ttUREG-0700.
The CONDENSATE tt STtt GEN BLOWDOWN CONDUCT CR-05-1 trend recorder does not have a legend to distinguish between pen colors.
(5.20)
RESPONSE
An appropriate label will be provided which clearly identifies pen colors and their meanings.
This will be implemented prior to fuel load.
A.5.17 The 0-5 psi operating band on the COttTAIttttENT PRESSURE PIS-07-28 display on Panel 206 is very small compared to the full range of the display scale (0-100 psi).
(5.21)
RESPONSE
The correct instrument is scaled 0-15 psi.
This instrument is correct for its intended use during accident conditions and will be installed prior to issuance of an operating license.
St.
Lucie SSER IIl
" 'C-17
FINDING Part A
N
~
-l J
'v Q A. 5.18 Throughout the control room, there is a lack of demarcation of the
'"normal", "safe", "caution", and "danger" ranges on display instruments.
(5.22)
RESPONSE
- 5'l6 bl
~;i LOo~th.s,k
~
~
GINNING This item will be addressed as part of the ongoing labeling and demarcation program which is scheduled to be implemented prior to issuance of an operating license.
A.5.19 The Reactor Protection System Trip Status.Panel has indicator lights which indicate OPEN on the bottom or left and CLOSED on the top or right.
Both of these indicator light positions are opposite of normal convention.-
(5.23)
RESPONSE
qadi fl bl The position of these lights will be corrected to conform to the established Control Room convention prior to issuance of an operating license.
FINDING A.5. 20 There are no lamp tests in the control room other than those for the annunciators.
(5.24)
RESPONSE
bl 8
\\
VJ I 1 Yr4 Ie~
N Nir
- A method will be developed to verify operability of the indicating lamps in the Control Room prior to fuel loading.
The following methods will be utilized for the verification:
a) direct indication by lamp test circuit, e. g., annunciator test b) installing a filament warming circuit to extend the filament life c) verification via redundant intelligence available on the board d) evaluation of manufacturer's filament life rating to determine changeout requirements e) the safety-related NOV positiori indication and breaker indication for safety-related pumps will be periodically tested as part of the pump and valve test program f) nonsafety-related NOV and breaker indications will be tested as part of the monthly, equipment rotation program.
St. Lucie SSER tl
.C-18
Part A
FINDING A.5. 21 F IH'3IHG A.5. 22 FINDING A. 5. 23 On Panel 201, the BATTERY 2A and BATTERY 28 status lights are single blue lights.
There is no indication whether the light indicates normal or abnormal state when lit.
(5.25)
RESPONSE
The above light's labels wi]1 be more clearly defined and will con-form to established color code convention.
This will be accomplished prior to fuel loading.
On the HVAC Panel, each of the following systems has three associated indicator lights, two of which are red:
(5.26)
CONTAIHHENT FAH COOLERS:
2NVS-1A, 18, 1C10
RESPONSE
The red lights indicate speed.
Center is the slow speed; the right red light is the fast speed.
These lights will be appropriately labeled.
This backfit will be implemented prior to issuance of an operating license.
Several recorders are supplied with paper which is scaled differently than the scale on the recorder face.
For example, the BORON CONCEN-TRATION RECORDER AP-2203 on PANEL 205, if installed as planned; will have four selectable ranges but will have only a single full range paper (0-2000).
Thus, if the operator selects (0-500) range, a
reading of 250 will be recorded as 1000, etc.
(5.27)
Other examples:
a)
Panel 201:
GENERATOR FREQUENCY RECORDER F-REC-881 b)
Panel 202:
FEEDWATER At(0 STEAN GENERATOR BLOMDOMH PHR-05-1.
RESPONSE
a)
Mill have proper scales prior to operating license.
b)
Mill have proper scales prior to operating license.
Boron concentration changes gradually over core life.
There would be no sudden transients requiring the use of multiole scales during normal operation.
This recorder will use lined unscaled paper.
The shift operator is aware of his boron concentration and relies on periodic chemistry readings for verification.
St.
Lucie SSER Nl C-19
Part A
F INDI HG A. 5. 24 FIHDIHG A.5. 25 FINDING A.5. 26 FINDING The trend recorders on the HVAC Panel have data legend labels on the glass window which obscure the graph paper.
The operator must open the recorder in order to read information.
(5.28)
RESPONSE
Labels will be repositioned so that displayed information is unobscured.
, This will be implemented prior to fuel loading.
A (0-125) nonlinear scale is used on the REACTOR HAKEUP WATER FLOW FRC-2210X display where a linear scale wou]d do just as well.
(5.30)
RESPONSE
Florida Power and Light agrees with priority assignment of this item.
Oue to the unique design of the instrument and long lead time for procurement, replacement may be after fuel load but will be implemented at the first opportunity after delivery but no later than first refueling.
Emphasis during training and temporary labeling will be used as an interim measure.
Several displays have no labeling to indicate what units their scales are measured in.
(5.31)
Examples:
a)
Panel 205:
WASTE GAS FLOW RECORDER"FR-6648 b)
Panel 203:
PRESSURIZER SPRAY-HIC-1100 c)
Panel 206:
REFUELING WATER TANK LEVEL-LR-07-20
RESPONSE
Appropriate labels will be installed prior to issuance of an operating license.
A.5.27 The X POWER HETER on the Reactor Protection System Panel has a
broken glass face.
(5.32)
RESPONSE
The glass will be replaced prior to fuel loading.
St.
Lucie SSER Nl C-20
~
~
1
~
8 E
.Part A
r
- h. i 4.g
~ ~
~ I.g
-r g v v>
-L CQKIAM4 A.6.0 LABELS AND LOCATION AIDS FINDING A.6.1 A number of controls and displays on Panel 203 have labels which are either missing or appear to be incorrect.
(6. 1)
RESPONSE
All labels will be reviewed as part of the labeling study.
Those missing labels will be installed and those incorrect labels will be corrected.
This discrepancy will be corrected prior to issuance of an operating license.
F INDIIIG A.6.2 FINDING A.6.3 FINDING A.6.4 Hany trend recorders on Panel 205 and the IIVAC Panel have blank labels or labels which do not identify the display's function.
(6. 2)
RESPONSE
This iten will be reviewed during the labeling study and blank labels and/or nondescriptive labels will be corrected prior to issuance of an operating license.
There are missing labels on the Plant Auxiliary Panel for switches and for switch position indicators.
(6.4)
I
RESPONSE
Those missing labels on the Plant Auxiliary Panel will be installed prior to fuel loading.
Some of the Auxiliary Feedwater Pump and Valve controls have unlabeled "Auto" positions.
(6.5)
Example:
a)
AUX FM PUHP/2A DISCH to SG2A VALVE
RESPONSE
Those pump and valve controls with unlabeled "Auto" positions will have these positions properly labeled prior to issuance of an operating, license.
This item will be included as part of the ongoing labeling study.
.4
~rI dl
( ~
~rI I'I b(
,(
c St.
Lucie SSER ffl 6-21
Part A
FINDING 4.6.5 On Panel 201 the BATTERY VOLTS 2A meter VN-1000 is incorrectly labeled as BATTERY VOLTS 2B.
(6.7)
RESPONSE
Volt meter VH-1000 will have its label corrected prior to issuance of an operating license.
FINDING A.6.6 The LOOSE PARTS INNITOR CABINET contains switches whose control functions and positions are not labeled.
(6.8)
RESPONSE
Correct Tabels will be provided prior to fuel loading.
FINDING A.6.7 Several toggle switches on the Reactor Regulating System Panel apd on the Reactor Coolant Pump Vibration Nonitor Panel have unlabeled swi tch pos itions.
(6. 9)
RESPONSE
Appropriate labels will be provided prior to fuel loading.
FINDING A.6.8 FINDING On Panel 206, the key switch pos itions on the HSI 5 block switch are not labeled.
(6.10)
RESPOHSE The HSIS block key switches will have their positions marked and properly labeled prior to issuance of an operating license.
A.6.9 LPSI LOOP 2A FLOW HETER on Panel 206 is mislabeled.
It should read 2Al.
(6.lgl
RESPONSE
LPSI LOOP 2A FLOW HETER on Panel 206 will have.its label corrected as part of the labeling program review.
This item will be corrected prior to issuance of an operating license.
FINDING A.6. 10 The LPSI HEADER PRESSURE HETERS 2A and 28 on Panel 206 are either mislabeled or in the wrong panel locations.
(6. 12)
St.
Lucie SSER fIl C"22
t
~"
~
g
Part A
l
~t
~ 4 ch c
Q gpss > w FINDING RESPOHSE These recorders/indicators are required to be powered from two independent safety grade power sources.
To comply with the additional requirements of R.G. 1.75 these displays were located in the asso-ciated electrical train to achieve the required separation.
As an interim measure prior to issuance of an operating license, demarcation will be used to make these items stand out.
The detailed control room review will include evaluation of relocating the recorders.
USIA.
A.6. 11 The CONDENSER VACUUM DISPLAY (PI-10-7B) on Panel 201 has a mislabeled scale.
It should read "Inches Hg Vacuum"'instead of "Inches Hg ABS".
(6. 13)
RESPONSE
'Yulti hh FINDING The condenser vacuum. display will be labeled as "inches ilG" prior to fuel loading.
A. 6. 12 F IHDIHG The FEEOMATER PUMP 2A FLOM label on Panel 202 is incorrect.
It should read FEEOWATER PUMP 2B FLOM.
(6. 15)
RESPONSE
The indicator will be appropriately labeled prior to fuel loading.
"/zz i
A.6. 13 The functional difference between the dual Steam Generator meters on the four EHGIHEERIHG SAFEGUAROS LOGIC CABINETS is not labeled.
(6. 16)
RESPONSE
Appropriate labels will be provided prior to issuance of an operating license.
FINDING A.6. 14 There is no hierarchical arrangement of labels by system and subsystem throughout the control room.
(6. 17)
RESPONSE
bl A labeling and demarcation eftort is underway.
Hierarchical labeling and demarcation will be provided.
This program is scheduled for completion prior to issuance of an operating license.
Sx.
Lucie.SSER ttl C-23
Part A
FINDING A.6.15 On Panel
- 201, component identification labels are not consistently larger than component status (e.g., "start", "stop", "auto") labels.
(6.18)
RESPONSE
FINDING Component identifying labels will be provided which are larger than component status labels.
This will be done prior to fuel loading.
A.6.16 Label placement convention is inconsistent throughout the control room.
(6. 19)
RESPONSE
FINDING Label placement is under review.
Mowever, as part of labeling effort, label visibilitywill take precedence over location consis-tency (except where substitution errors are likely due to inconsistent label locations).
This item will be completed prior to issuance of an operating license.
A.6. 17 Labels on Panel 201 have been placed under displays and are often obscured by the overhanging bezel of the display they are intended to identify.
(6.20)
RESPONSE
'INDING During relabeling, labels will be placed'in nonobscured locations prior to issuance of an operating license.
A.6.18 The label for the backpanel that contains the L 5 N PROCESS AND COOLING WATER TEMP.
SELECTOR is below the switch array and is obscured.
(6.21)
RESPONSE
FINDING The label will be relocated to a more visible position.
This item will be completed prior to fuel loading.
A.8.19 The WASTE GAS FLOW trend recorder on Panel 205 has no label to indicate what parameter is being monitored.
(6.22)
St.
Lucie SSER If1 C"24
l I
v t
I il 1
c 1
4
~
Part A
FINDING A.6.20 FINDING A. 6,? I
!'INDIHG
RESPONSE
The parameters
'on all recorders will be appropriately labeled prior to issuance of an operating license.
On Panel 202, the labeling for the light pairs representing the UHS CANAL BARRIER VALVES (I-S3"21-13, 14) is ambiguous.
There is one label for two light pairs.
RESPONSE
The labeling will be changed to reflect the labeling of the two individual valves I-S3-21 and I-S3-21"14, respectively.
This item will be completed prior to fuel loading.
On Panel 201, labels for rotary switch control positions are not oriented horizontally and switch position labels are obscured by the control handl e..
(6. 24)
Example:
a)
AYAETER CONTROLS FOR BUS 2Al.
RESPOHSE The control handle will be mo'dified or changed so that switch position labels are not obscured.
Switch position label orientation will be further evaluated per the requirements of NUREG-0700.
This item will be completed prior to fuel loading.
A.6.22 On Panel 205, there is no indication on two-color trend recorders as to which color represents an actual reading and which represents the set point.
(6.25)
RESPONSE
Labels will be provided that identify the pen color meanings.
This item will be implemented prior to issuance of an operating license.
FINDING
.A.6.23 The REACTOR CHANNEL TRIP BUTTONS on Panel 204 are not labeled as to function.
The buttons should be labeled "TRIP".
(6.26)
St, Lucie SSER IIl
- C-25
RESPONSE
Part A
"'i
- 66. d
~
~
~1 cj(
The content of these labels will be reviewed and improved labels provided.
This item will be implemented prior to issuance of an operating license.
FINDING A.6.24 Host of the component labels on the FEEOWATER REGULATING RACK do not contain component identification numbers.
(6. 27)
RESPONSE
Permanent labels will be provided prior to fuel loading.
FINDING f,. L1 24/f1 b I 4
A. 6. 25 Labels on Panels <05 and 206 are very similar and can be confusing (6.28)
Examples:
a)
BORIC ACID GRAVITY FEED VALVE V-2508 and BORIC ACID GRAVITY FEED VALVE V-2509 b)
NPSI TO HOT LEG 2B VALVE V.-3551 and NPSI TO NOT LEG 2B VALVE V-3523
RESPONSE
Similar labels will be resolved as part of the relabeling effort.
This item will be implemented prior to fuel loading.
Is c) eIt FIHDINIA A.6.26 On Panel 206, there is an error on the HPSI NOR B TO LOOP 2B2 label.
It should read LPSI instead of HPSI.
(6.29)
RESPONSE
Errors in labeling will be corrected as part of the relabeling effort.
This item will be corrected prior to issuance of an operating license.
FINDING A.6.27 Abbreviations are not used consistently in labels.
(6.30)
Examples:
a)
Panel 266:
CCfl PUWP 26 (CCU = ~coo onen'oo)ing water)
I~2'1
~g4 t>
I bl C3o 'I<<fI I
bl
~$4.;
6
~
I
)
h
~
a n
~'
li St.
Lucie SSER ffl C-26 6
r 4
II I
Part A
-4 1
~
I
~
~
I F
INDI'tG A. 6.28 FIHDIttG A.6. 29 F ItlDIHG A.6.30 b)
Panel 203:
CCW FROM RCP ZA1 FLOW (FIA-1158)
(CCW = core cooling water) c)
Panel 205:
COMP COOL'G WATER.
RESPONSE
Standardized abbreviations are to be employed during St.
Lucie Unit No.
2 relabeling.
Presently this item is scheduled for implementation prior to issuance of an operating license.
Labeling of units on scales of trend recorders,
- counters, and process controllers on Panel 202 is inconsistent and often is redundant with the control label.
(6.31)
Example:
a)
FEEOWATER TO SG 2A REG VALVE BYPASS LIC-9005
RESPONSE
This item will be addressed as part of the St.
Lucie Unit No. 2 relabeling effort.
This effort is scheduled for implementation prior to fuel loading.
Pushbuttons on Panels 201 and 203 have two labels which present redundant information.
(6.32)
Example:
a)
Panel 201:
TURBINE TRIP and TRIP b)
Panel 203:
RCP 2Al VIBRATIOtt RESET and RESET.
RESPONSE
Redundant labels will be removed.
This item will be implemented prior to issuance of an operating license.
Some labels are difficult to read due to insufficient color contrast between label surface and lettering.
(6.34)
RESPONSE
Figure background contrast will be improved as part of relabeling.
This item is scheduled to be implemented prior to issuance of an operating license.
9 St, Lucie SSER ttl
'C-27
4 It I
~~z Part A
~ tt
~
p(r c
I '4 t
C
~v 4>>
C-ZQ FINDING A.6.31.
Engraved labels on all panels in the control room have become obscured by gt ime.
(6.35)
RESPONSE
!!!!!II!JG Relabeling will use black characters on a white background, reducing obscuration by grime.
This effort is scheduled to be implemented prior to issuance of an operating license.
~ t l.
t>>
t I
A.6.32 FINDING A.6.33 On the P..nt Auxiliary Panel, the annunciator control button labels are illegible and the ACKNOMLEOGE buttons are not labeled.
(6.36)
RESPONSE
These controls will be appropriately labeled as part of the ongoing labeling study which is scheduled for implementation prior to issuance of an operating license.
Panels 203 and 206 have labels, whose characters are separated by less than the minimun recommtended space (I/6 character height).
(6.37)
RESPONSE
bl bl
,t>>'
IHDlilG A.6.34 During St.
Lucie Unit Ho.
2 relabeling, character spacing will conform to the requirements of HUREG-0700.
This iten is scheduled as part of the relabeling effort to be implemented prior to fuel.
loading.
Line spacing is less than 1/2 character height on almost all labels in the control room.
(6.38)
RESPONSE
FINDING During St.
Lucie Unit 2 relabeling, line spacing will be 1/2 character height or greater.
Line spacing will conform to the requirements of NUREG-0700 and will be implemented prior to fuel loading.
!>>I A.6.35 Several controls on Panel 201 have temporary labels to indicate associated circuit breakers.
(6.39)
J>>.
I'a St.
L'ucie SSER /f1 C-28
Part A
I uX >
~ 9 r'.u C-29
RESPONSE
F IHDIHG A.6.36 A review of existing labels (permanent and temporary) will be conducted.
During St.
Lucie Unit Ho.
2 relabeling all information will appear on permanent labels.
This effort is scheduled for implementation prior to fuel loading.
The permanent label for the STATION BATTERY 2B VOLTS meter is in'correct and has oeen replaced by a temporary label.
However, both labels are still in place.
(6.40)'ESPONSE 40 I tI Il F INDIHG A.6. 37 This will be corrected with correct, permanent labels.
This labeling effort is scheduled for completion prior to fuel loading.
On Panel 201, the label for the 480V BUS TIE SWITCH 2AB-2 is hand" written in ink on the panel surface.
(6.41) n>
9c
RESPONSE
F INDIHG A permanent label will be provided.
This item is scheduled to be implemented prior to fuel loading.
A.6.38 Tag outs on Panel 201 obscure displays located below them on the control panel.
(6.42)
RESPONSE
F INDIHG A. 6. 39
. A method of tagging which does not obscure adjacent switches will be implemented prior to issuance of an operating license.
On Panel
- 201, susmlary labels and demarcation lines are not used to identify and separate systems surrounding mimics.
Labels do not always appear above mimic areas.
(6.43)
Example:
a)
Electrical distribution buses
RESPONSE
3I bl Summary labeling and demarcation lines will be used to more clearly identify and separate those specific controls which are not associated
. St.
Lucie SSER Nl C-29
0
,h
~
1 t
~
Part A C-so F IUDIHG A.6.40 with the surrounding mimic areas.
This item will be completed prior to fuel loading.
REACTOR TRIP A and C pushbuttons on Panel 201 are adjacent to the TURBINE TRIP pushbutton.
REACTOR TRIP is a safety function and its controls should be readily distinguishable from the TURBINE TRIP control.
(6.44)
RESPONSE
bl w
F IHOING Reactor Trip pushbuttons will be conspicuously demarcated and labeled.
This item is scheduled for implementation prior to issuance of an operating license.
A.6.41 The color coding and shading of control labels on the HVAC Panel is inconsistent with the rest of the control room.
(6.45)
RESPONSE
Any color coding of labels during the relabeling study will offer consistent color meanings.
This item is scheduled for implementation prior to issuance of an operating license.
FINDING A.6.42 Himics in general are not consistently color coded.
For example, there is an inconsistent use of color in the Power Oistribution Himic on Panel 201.
The colors yellow and blue are used for volt-ages of 6.9KV and 4. 16KY and yellow and. blue are also used for protective channels B and 0.
(6.46)
RESPONSE
5 F IHOING Consistent mimic color and codings means will be provided.
This will be implemented prior to issuance of an operating license.
A.6.43 On Panel
- 205, the annunciator TEST control is color coded red, which is inconsistent with coding of other annunciator controls.
(6.47)
RESPONSE
This control will be changed to black.
This backfft will be imple-mented prior to issuance of an operating license.
St. Lucie SSER Nl
. C-30
~
hI I
~
I I
~
y
~
Part A
4 4.v
~ <4 v Q co FINDING A.G;44 The Line Repeat Panel Nimic has incomplete mimic lines and arrows.
(6.48)
RESPONSE
F IHDING A. fi.45 The mimic will be completed.
This item will be completed prior to fuel loading.
Color codes of labels are generally based upon the power supply for the component instead of the component function.
This color code scheme is helpful for maintenance but is not a useful aid for the operator.
(6.49)
RESPONSE
/v fl I
bl 7 FCG ~
vo, The present labels are scheduled to be replaced with black on white labels;
- however, a small color dot indicator will be used to denote power train.
Presently this item is scheduled to be completed prior to issuance of an operating license.
FIHDIHG A.G.46 There is a lack of grouping of Diesel Generator controls on Panel 201.
(6. 51)
RESPONSE
lai c
'lt-c.B R.T(
The Diesel Generator controls are grouped in accordance with the associated distribution system as depicted by the board mimic.
Displays are located directly above associated controls.
Summary labeling and demarcation lines will be used to more clearly define grouping of associated diesel generator controls.
This item will be implemented prior to issuance of an operating license.
A.3.0 PANEL LAYOUT FINDING A.U. 1 On Panel 203, there is a lack of consistency in the column alignment of similar displays.
For example, UPPER CAVITY PRESSURE indicators are not aligned vertically in the same column.
(8.5)
RESPONSE
t4 ll 3
bl This ss a labeling problem and not a lack of consistency.
The span of the gauges indicates they are installed in a consistent manner.
The labeling will be corrected prior to fuel loading.
St.
Lucie SSER Nl C-31
l I
c'I l
I 1
I
~
l I
f I
Part A
I
~ ~
.!'j YQ C -sa.
F INDI FIG A.8.2 On Panels 205 and 206 it is difficult to locate and identify specific controls located in large matrices of controls which are identical in appearance.
The control arrays do not have aids such as system funtional grouping, functional color coding, or demarcation to facilitate operator actions.
(8.7)
RESPONSE
'tht ft L
hi F IIIIING lhese control arrays will incorporate system functional grouping and demarcation to facilitate operator actions.
This item will be implemented prior to issuance of an operating license.
~
j.
A.8.3 The indicator lights for OIESEL GEN.
2A LOAOIHG status on Panel 201 are not arranged in <he conventional operational loading sequence.
(8.9)
RESPONSE
2 b1
~'
IHDING loading sequence on Panel 201 will be arranged. in a consistent
. manner prior to issuance of an operating license.
A.8.4 Gn Panel
- 203, some controls are not arranged by importance or fre-
. ouency of use.
(8.10)
Examples:
a)
ANttUNCIATOR controls
.b)
REACTOR COOLNlT PUMP controls
~t
~
!l
RESPONSE
~
t
~
~
~
~
Presently the ANNUNCIATOR controls located on Panel 203 are scheduled to be moved to the lower right-hand corner of Control Board 204.
lhese controls are scheduled for relocation prior to receiving an operating license.
F INDIHG A.8.5
'fhere is a poor grouping of indicator lights in several places on Panel 206.
(8. 11)
Examples:
a)
~nfl Z
bl I
~I St.
Lucia SSER ttl C-32 N
I I I I I t
- Part A
\\
."'i
<u
~ <
vQ u U>
~ y
<4<
RESPONSE
FINDING A.8.6 These controls and associated indicating lights will be demarcated to improve control/display relationships.
This item is scheduled for implementation prior to issuance of an operating license.
On Panel 203, several controls/displays are arranged horizontally on
'he upright panel while related controls/displays are arranged vertically on the benchboard.
(8.12)
Example:
a)
Reactor Coolant Pumps 2A1, 2A2, 281, 282
RESPONSE
~
gdZ
'l/ir i bl F INOIIIG These controls and displays will incorporate demarcation, hierarchical
- labeling, and summary labeling to bette define these control/display relationships.
This item is scheduled for implementation prior to fuel loading.
A.8.7 There is a reversal from normal left-to-right convention of the indicator lights for the LPSI HDR A TO LOOP 2Al VALVE and the LPSI HDR A TO LOOP 2A2 VALVE on Panel 206.
(8. 13)
RESPONSE
l3
/t4AI 2
bl The arrangement of the HIPSI and LIPSI control displays will be reviewed and rearranged to complement the control/display demarcation effort.
This item is scheduled for implementation prior to issuance of an operating license.
F INDII(G A.B.B The AUX FEEDWATER HEADER FLOW trend recorders on Panel 202 are arranged in BCA left~to-right sequence instead of ABC.
(8.15)
RESPONSE
~IdiQ I
3 These recorders will be rearranged to conform to the control grouping.
This item is scheduled for implementation prior to fuel loading.
F INDING A.8.9 There are many locations in the control room where components are not arranged left-to-right and/or top-to-bottom, and are not identi-fied in alphabetical or numerical sequence.
(8. 16) s s'If~
i z
bl St..
Lucie SSER tl C-33
+<.
Part A
~\\y C-3y FINDING A.8. 10 FIND IHG A.B.jl F IttOIttG Examples:
a)
The HOLDUP TAtlK LEVEL ItlOICATORS on Panel 205 are ananged from right, to left.
b)
On Panel
RESPONSE
a)
The HOLDUP TAtlK LEVEL ItlDICATORS will be rearranged to agree with left to right convention.
b)
The HDR B and HDR A ISOL VALVE key operated switches and indi-cating lights will be reananged to agree with top to bottom convention.
These will be implemehted prior to issuance of an operating license.
The locations of LitiUIO WASTE FLOW VALVES FCV-6627Y and FCV"6627K status indicator displays and valve control switch positions violate the upper/left - lower/right layout convention for associated controls and displays in a mixed horizontal and vertical layout.
The upper set of indicator lights for valve Y is associated with the right
'osition of the valve control. 'he lower set of indicator lights for valve X is associated with the left position of the control..
(8.17)
RESPONSE
The light positions will be reversed to agree with left/right-top/bottom convention.
This item will be implemented prior to issuance of an operating license.
On Panel 206 the meter for SI TANK 2A2 LEVEL is a narrow range instrument.
It should be a wide range meter to be consistent with similar level displays on the panel.
(8. 18)
RESPONSE
SI TANK 2A2 LEVEL instrument LIA-3311 will be replaced with the proper wide range indicator.
This item will be implemented prior to fuel loading.
bl A.8.12 There are excessively long meter strings of more than five vertical meters per string on Panels 201 and 203.
(8.20)
St. Lucie SSER ¹1 C-34
hvar y Part A
t
<<t
<v Examples:
a)
EXPANSION STEAM AREA b)
COHOENSER STEAM AREA
RESPONSE
Labels (suhmary and component) and demarcations will be provided to provide visual anchors breaking up -strings into smaller groups.
This item will be implemented prior to issuance of an operating license.
FINDING A. 8. 13 There is string of 10 J-handles on Panel 203.
It is difficult to readily distinguish individual controls in the string.
(8.21)
RESPONSE
g.2l Labels (su+nary and component) and demarcations will be provided to provide visual anchors breaking up strings into smaller groups.
This item will be implemented prior to issuance of an operating.
license.
FINOIHG A. 8. 14 The REACTOR COOLANT PUMP 2B2 control on Panel 203 is located in a cluster with the PRESSURIZER BACKUP HEATER BANK controls.
The pressurizer heater controls are used frequently.
This location of the reactor'oolant pump control among frequently operated controls increases the likelihood of accidental shutoff of the reactor coolant pump.
(8. 22)
RESPONSE
~ 22 'ifxgi l
FINDING Finding to be resolved via demarcating and summary labeling of RCP controls, pressurizer relief controls, pressurizer
- heaters, and shape coding of RCP handles.
This item to be implemented prior to issuance of an operating license.
A.8.15 'he CRT display on Panel 204 is difficult to view from the operator's position at the ROD POSITION CONTROLS because of the poor viewing angl e.
(8. 23)
RESPONSE
~13 The analog display is in close enough proximity to the CEA control panel to eliminate any viewing problem.
This will be verified utilizing guidelines of NUREG-0700 or ior to issuance of an operating license.
St.
Lucie SSER ifl C-35
F INOIHG A.8. 16 Part A
Electrical test points for Reactor Coolant Temperature are included in front panel.
If they are'sed only for calibration, they should be placed in other than prime control areas.
If they are used for operations, they should be replaced by an appropriate display.
(8. 24)
RESPONSE
4 ~
we) w ww 4
3'l
-.1 w.
C Sw d
C-3c A.9.0 FINDING These test points will be relocated to another area prior to fuel loading.
CONTROL/DISPLAY INTEGRATION A.9. 1 Panel 202 benchboard controls are mirror imaged while corresponding vertical displays are not.
(9.2)
RESPONSE
bl FINOING The display associated with the Aux Feedwater controls on Panel 202 will be arranged to be consistent with the associated controls.
This effort will be combined with the upgrade requirements of the Aux Feed system and is scheduled for implementation prior to issuance of an operating license.
w A.9.2 The right portion of Panel 202 contains 5 different subsystems (circulating water, condensate, primary makeup,
- intake, and screen wash), which are not arranged in a logical layout.
(9.5)
RESPONSE
~ tl w
l1
\\.1'ICE 0 ~ w
~
FINDING Demarcation will be implemented as an interim measure prior to issuance of an operating license.
This item will be reviewed as part of the long term design review in accordance with NUREG-0700.
A.9.3 Fisher-Porter controllers are inconsistent with each other.
Some are fixed scale/moving pointer, while others are moving scale/fixed pointer.
This requires operator to move the set point rotary wheel up to increase on some controls and down to increase on others.
(9.6)
Examples:
(Panel 205) a)
REACTOR HAKEUP FLOW (FRC-2210X) b)
FLASH TANK LEVEL (FCV-6627Y)
St.
Lucie SSER
((1 C-36
Part A
RESPONSE
a)
Prior to issuance of an operating license "increase arrows" will be placed to clarify operation of those movable scale controllers.
b)
These controllers will be reviewed in the Detail Control Room Design Review and reported on in accordance with NUREG-0700.
St.
Lucie SSER 41 C-37.
Part 8
HUsRNll ENGINEERING DISCREPAHCIES THAT HAVE BEEN DOWNGRADED TO PRIORITY 3 This section contains a description of those discrepancies which have been downgraded to Priority 3.
Following each discrepancy is a statement of the rationale for the downgrading provided by Florida Power and Light Company-(FPL) and acceptable to the HFEB.
B. 3.0 ANHUNCIATORS FINDING 8.3.1 The annunciator system does not have a separate First Out Panel for the reactor systems.
Annunciator Panel C, for the turbine, is the only annunciator panel with First Out reset capability.
(3.5)
RESPONSE
The Sequence oT Events Recorder is currently employed to print out sequence of events of Reactor Trip signals.
The initiating signal is printed as part of this sequence.
Therefore, the SER is the main means of identifying the cause of the trip.
This item will be addressed as part of the long-term design review and reported on in accordance with NUREG-0700.
FINDING 8.3.2 On all annunciator panels, the only indication that an annunciated condition has been cleared is the extinguishment of the light.
(3.7)
RESPONSE
F INDIHG The present annunciator system is consistent with Florida Power and Light's standard design philosophy.
Clearing of an annunciator is indicative of a back to normal condition which is a safe condition and requires no operator action.
It is felt that having the operator responsible for acknowledging return to normal conditions during a plant transient or other evolution requiring his attention could impede his judgement and affect his response time in reacting to a given situation.
This item will be reviewed as part of.the long-term design review and reported on in accordance with NUREG-0700.
8.3.3 Some annunciators used in startup will be normally lit during full-power operation.
(3. 11)
Examples:
a)
POWER HIGH RANGE OF CHANGE and TRIP BYPASSED tiles on annunciator Panel L
St.
Lucie SSER Nl C-38
Part 8 4
~
iC 4
4.0 I
I Gl v)
P gGGG n~ 6
RESPONSE
An engineering review will be conducted to identify annunciators which will be normally lit during full-power operations.
This item will be reviewed as part of the detail design-review and reported on in accordance with NUREG-0700.
F INOING 8.3.4 The operator cannot read all of the annunciator tiles on Panels 205 and 206 from the annunciator acknowledge control location because of the oblique viewing angle from the control location.
(3.16)
RESPONSE
The operator would walk to the annunciator panel regardless of the location of-the acknowledge control.
This item will be included as part of the detailed control room design review reported on in accord-ance with HUREG-0700..
8.4.0 CONTROLS IIIIDIIIG 8.>>. I The Fire Pump lA and 18 Stop controls on panel 202 are unnecessary controls to that panel.
These controls are not related to systems operations controlled from that panel.
(4.2)
RESPONSE
The Fire Pump controls will be reviewed as par t of the long-term effort and reported as part of NUREG"0700.
8.5. 0 OISP LAYS F IHDIHG 8.5.1 On Panel 204, the CEA'Secondary Rod Position display is made up of a high contrast checkerboard pattern of bright yellow on white.
This pattern is very disturbing to look at because of color afterimages.
(5. 9)
RESPONSE
This will be the subject of the long-term review and reported on in accordance with NUREG-0700.
FIIIDIHG 8.5. 2 liultipoint impact recorders have too many data channels on each recorder.
Some recorders have as many as 24 data channels.
Similar impact recorders in Unit 1 were found to be overprinting their data.
(5.29)
St.
Lucie SSER I/I C-39 I
~
e Gi[i, I
4
~
.E
Part B
RESPONSE
,These impact recorders are used for trend values.
An off-normal condition would be seen as a departure from normal trend at which time the point would be readable.
This will be looked at. as part of the long-term review in accordance with NUREG-0700.
B.8. 0 PANEL LAYOUT
'FINDING 8.8.1 On Panel 206 unrelated displays have been placed between related displays for CCW FROM SHUTDOWN, ~ CCW FROM FUEL POOL, and CONTAINMENT SPRAY.
(8. 3)
RESPONSE
Florida Power and Light will review this item as part of the detailed control room design review and it will be reported on in accordance with NUREG-0700.
FINDING 8.8. 2 FINDING',B.S.3 The VOLUME CONTROL TANK DISCH VALVE V-2501 and the REFUELING WATER TO CHARGING PUMPS VALVE V-2504 on Panel 205 are spatially separated by other letdown, charging and VCT controls.
There is a general lack of logical layout of charging,
- letdown, and VCT controls on this panel for task oriented optimization.
(8.4)
RESPONSE
This item will be incorporated into long"term review and reported in accordance with NUREG-0700.
The CONDENSATE STORAGE TANK IIIGii LEVEL and CONDENSATE LOW LEVEL annunciator tiles on annunciator Panel g are not near or above associated system displays.
(8.5)
RESPONSE
The CONDENSATE STORAGE TANK HIGH LEVEL and LOW LEVEL annunciator tiles are located on Panel G, not on Panel g.
Panel G is located on Control Board 202 and the displays are located 4 feet to the right and are readable from the associated control location.
The annunciator display relationship will be addressed as part of the long-term review in accordance with NUREG-0700.
St.
Lucie SSER 81 C-40
'k.
wl
~ ~
4 I
)
II k
f
~
Part B
B.9.0 CONTROL/DISPLAY INTEGRATION i IHDING 8.9.1 There is little system functional logic to the layout of Panel 205.
For example, a normal blending operation would involve the use of the BORIC ACID HAKEUP PUMP 2A,, the DORIC ACID kNKEUP FLOW VALVE, the REACTOR HAKEUP WATER STOP. VALVE, and the REACTOR HAKEUP FLOM VALVE controls and the indicators for BORIC ACID FLOW, REACTOR HAKEUP MATER FLOM and VOLUHE CONTROL TANK LEVEL.
These controls and displays are not logically grouped to perform this operation.
(9. 1)
RESPONSE
This item will be incorporated into the long-term'review and reported on in accordance with NUREG-0700.
St.
Lucie
.SSER Nl C-41
r z,
~ ~.,i I