Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212A964 + (ML17212A964)
- IR 05000335/1981021 + (ML17212A966)
- ML17212A967 + (ML17212A967)
- L-81-431, Ack Receipt of IE Insp Rept 50-335/81-18,on 810711-0810.No Proprietary Info.Corrective Actions:Backfit Contractor Issued Procedure Re Fire Barrier Removal & Restoration + (ML17212A969)
- ML17212A970 + (ML17212A970)
- ML17212A971 + (ML17212A971)
- IR 05000335/1981018 + (ML17212A972)
- ML17212A973 + (ML17212A973)
- L-81-448, Ack Receipt of IE Insp Repts 50-335/81-20 & 50-389/81-16 on 810818-21.No Proprietary Info.Corrective Actions: Instructions Posted in Depositories in Each Bldg for Collection of All Unused E-7108 Electrodes + (ML17212A976)
- ML17212A977 + (ML17212A977)
- ML17212A979 + (ML17212A979)
- IR 05000335/1981020 + (ML17212A980)
- ML17212A981 + (ML17212A981)
- L-81-471, Forwards Proprietary & Nonproprietary Preliminary Assessment of St Lucie 2 Fuel Structural Integrity Under Faulted Conditions. Affidavit for Withholding Encl + (ML17212A982)
- ML17212A985 + (ML17212A985)
- ML17212A988 + (ML17212A988)
- ML17212A992 + (ML17212A992)
- ML17212A995 + (ML17212A995)
- ML17212A996 + (ML17212A996)
- ML17212A998 + (ML17212A998)
- L-81-475, Application to Amend App a of License DPR-67 to Obtain Relief from Prescribed Action in Table 4.4-2 Category for Steam Generator Tube Insps + (ML17212A999)
- ML17212B000 + (ML17212B000)
- ML17212B001 + (ML17212B001)
- L-81-474, Forwards Responses to NRC Request for Addl Info Re Battery Capacity & Load Shedding During Station Blackout.Responses Will Be Incorporated Into Future Amend to FSAR + (ML17212B003)
- ML17212B005 + (ML17212B005)
- ML17212B007 + (ML17212B007)
- ML17212B009 + (ML17212B009)
- L-81-481, Documents 811013 Telcon Between Nrc,Util & C-E Re Util Commitment to Perform Equipment Functional Testing & Submit Data Supporting Analytical Chemistry procedure.Post-accident Sampling Sys Irradiation Test Description Encl + (ML17212B010)
- L-81-484, Discusses re-exam of Stretch Power Application Re Sections 7.2.3 Loss of All Non-Emergency AC Power Event, & 7.3.4, Seized Rotor Event, Per Request + (ML17212B011)
- L-81-482, Advises That Plant Design Data Re Containment Sump Info,Per NRC 811007 Request,Will Be Provided by 820305 + (ML17212B012)
- L-81-490, Notifies That Info Requested in NRC 810505 Generic Ltr 81-21 Re Natural Circulation Cooldown Was Provided During Review of OL Application + (ML17212B015)
- L-81-487, Advises That Util Will Provide Fully Authorized & Approved Emergency Operating Procedure for Station Blackout by 810331,in Confirmation of 811118 Telcon.Procedure Will Incorporate NRC & C-E Comments + (ML17212B016)
- M170193, GE-Hitachi Nuclear Energy Americas, LLC - Submittal of Response to NRC Request for Additional Information + (ML17212B019)
- ML17212B019 + (ML17212B019)
- ML17212B022 + (ML17212B022)
- L-81-493, Forwards Responses to Requests for Addl Info Re Turbine Missile Analysis.Response Will Be Incorporated Into FSAR in Future Amend + (ML17212B026)
- L-81-488, Forwards Oct 1981 Const/Startup Progress Rept.Revised Sept 1981 Rept Also Encl + (ML17212B027)
- ML17212B035 + (ML17212B035)
- ML17212B036 + (ML17212B036)
- ML17212B037 + (ML17212B037)
- ML17212B038 + (ML17212B038)
- L-81-495, Advises of Commitment to Insure That Plant Staff Can Be Augmented to Levels Specified in Table B-1 of NUREG-0654, Revision 1,within 45 to 75 Minutes of Notification. Capability Meets Intent of 10CFR50.47(b)(2) + (ML17212B039)
- ML17212B054 + (ML17212B054)
- ML17212B059 + (ML17212B059)
- L-81-485, Forwards Public Version of Revision 10 to Radiological Emergency Plan,Consisting of Organizational Change Affecting Emergency Central Officer Position + (ML17212B061)
- L-81-500, Informs That Response to 811109 Auxiliary Sys Branch Questions 410.40 & 410.43-46 Will Be Submitted by 811218 + (ML17212B067)
- ML17212B068 + (ML17212B068)
- IR 05000335/1981026 + (ML17212B070)
- ML17212B071 + (ML17212B071)
- IR 05000335/1981023 + (ML17212B073)
- L-81-503, Forwards Rept of const/start-up Progress for Oct 1981 & Revised Rept for Sept 1981 + (ML17212B074)