ML17212A977
| ML17212A977 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/14/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17212A974 | List: |
| References | |
| NUDOCS 8111050752 | |
| Download: ML17212A977 (3) | |
See also: IR 05000335/1981020
Text
1 4 198l
Florida Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos
-335/81-
nd 50-389/81-16
This refers
to the routine safety
inspection
conducted
by
W.
P. Kleinsorge of
this office
on August 18-21,
1981, of activities authorized
by
NRC Operating
License
No.
and
Construction
Permit
No.
CPPR-144
for the
St.
Lucie
facility.
Our preliminary findings were discussed
with Mr. B. J . Escue,
Unit 2
Site Manager, at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
This
item
and
references
to pertinent
requirements
are
listed
in
the
Notice
of Violation enclosed
herewith
as
Appendix A.
Elements
to
be
included
in your
response
are
delineated
in
Appendix A.
Two new unresolved
items are identified in the enclosed inspection report.
These
items will be examined during subsequent
inspections.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC's Public Document
Room.
If the report contains
any information that you believe to
be
exempt
from dis-
closure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days
from the
date of this letter
a written application to this office to withhold such infor-
mation.
If your receipt of this letter
has
been
delayed
such that less
than
seven days are available for your review, please notify this office promptly so
8iii050752 8ii028
ADQCK 05000335
G
Florida Power and Light Company
1 4 198'l
that
a
new due date
may
be established.
Consistent
with section
2.790(b)( 1),
such application
must
be accompanied
by an affidavit executed
by the owner of the
information which identifies the document or part thereof
sought to be withheld,
and
a full statement
of the reasons
on the basis of which it is claimed that the
information
should
be withheld from public disclosure.
This
section
further
requires
the statement
to address
with specificity the considerations
listed in
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from
you in this regard within the specified periods
noted above,
the report will be
placed in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-335/81-20
and 50-389/81-16
Paul J. Kellogg, Chief
Reactor Projects
Branch 2,
Division of Resident
and
Reactor Project Inspection
cc w/encl:
C.
M. Wethy, Plant Manager, Unit 1
N. Weems, Assistant
Construction
Manager
B. J.
Escue,
Plant Manager, Unit 2
bcc w/encl:
bcc w/encl:
NRC Resident Inspector
Document Management
Branch
State of Florida
e> sorge.
P/g /81
RII
w
RII
RII
gl
RII
RHerdt
CENurp'hy
AFG'ibibon //~e
RC
/el/81
f A/81
~/~/81
q ~I'/I]/81
I
~ l,
~,