Text
Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report
No. 50-335/81-18
This refers to the routine safety inspection
conducted
by Mr. S.
A. Elrod of this
office on July
11 - August 10, 1981, of activities authorized
by
NRC Operating
License
No.
DPR-67 for the St. Lucie facility.
Our preliminary findings were
discussed
with Mr. C.
M. Wethy, Plant Manager, at the conclusion of the
inspection.
Areas
examined
during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection
consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
We have examined actions
you have
taken with'egard to previously identified
enforcement matters.
These
are discussed
in the enclosed
inspection report.
One
new unresolved
item is identified in the enclosed
inspection report.
This
item will be examined
during subsequent
inspections.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter
and the enclosed
report will be placed
in the
NRC's Public Document
Room.
If the report contains
any information that you believe to
be exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone within ten days
from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days
from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter
has
been
delayed
such
that less
than
seven
days are available for your review, please notify this
office promptly so that
a
new due date
may
be established.
Consistent with
section 2.790(b)(1),
such application must
be accompanied
by an affidavit
executed
by the owner of the information which identifies the document or part
thereof sought to
be withheld, and
a full statement
of the reasons
on the basis
of which it is claimed that the information should
be withheld from public
, disclosure.
This section further requires
the statement
to address
with
specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information
t
sought to
be withheld shall
be incorporated
as far as possible into a separate
8111050723
811014
ADOCK 05000335
6
~ ~,
~
g
~
'
Florida Power
5 Light Company
SFP p g )981
t
part of the affidavit. If we do not hear
from you in this regard within the
specified periods
noted above,
the report will be placed in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Project
Branch 2, Division of
Resident
and Reactor Project
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection
Report
No. 50-335/81-18
cc w/encl:
C.
M. Wethy, Plant Manager
N. Heems, Assistant
gA
Construction
Manager
B. J.
Escue,
Plant Manager
bcc w/encl:
NRC Resident
Inspector
Document
Management
Branch
State of Florida
RI Ig
1 rod: r
t
8/q~/81
RII
HC ance
8 V/81
KLan is
8/g,'i/81
PI I
P JKe
ogg
g/2,/81
~ l
"I
1
'
s'l