Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12305A278 + (ML12305A278)
- ULNRC-05924, ULNRC-05924: Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) + (ML12305A283)
- ML12305A286 + (ML12305A286)
- ML12305A287 + (ML12305A287)
- LIC-12-0154, OPPD Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML12305A288)
- PLA-6923, Initial Status Report in Response to March 12, 2012 to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (ML12305A289)
- PLA-6924, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (ML12305A291)
- PLA-6925, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A292)
- JAFP-12-0123, Initial Status Report in Response to March 12,2012, Commission Order to Modify Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (ML12305A293)
- LIC-12-0155, OPPD Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A311)
- ULNRC-05925, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A312)
- L-PI-12-093, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A313)
- JAFP-12-0124, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML12305A314)
- ML12305A315 + (ML12305A315)
- JAFP-12-0125, Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A316)
- 05000333/LER-2012-002, Regarding High Pressure Coolant Injection Pressure Control Valve Failure + (ML12305A317)
- ML12305A318 + (ML12305A318)
- IR 05000269/2012004 + (ML12305A326)
- ML12305A327 + (ML12305A327)
- IR 05000005/2012001 + (ML12305A335)
- ML12305A338 + (ML12305A338)
- ML12305A342 + (ML12305A342)
- ML12305A343 + (ML12305A343)
- ML12305A344 + (ML12305A344)
- CNRO-2012-00006, Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants + (ML12305A359)
- ML12305A360 + (ML12305A360)
- ML12305A361 + (ML12305A361)
- PNP 2012-087, Proposed Alternative - Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW136 + (ML12305A362)
- 0CAN101203, – Units 1 and 2, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML12305A372)
- 0CAN101204, Units 1 and 2, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) + (ML12305A374)
- NG-12-0427, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (ML12305A375)
- NG-12-0428, NextEra Energy Duane Arnold, Llcs, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A376)
- NG-12-0426, NextEra Energy Duane Arnold, LLCs Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-04 + (ML12305A378)
- L-MT-12-095, Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Fo + (ML12305A381)
- L-MT-12-092, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12305A383)
- L-MT-12-089, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (ML12305A384)
- ML12305A394 + (ML12305A394)
- ML12305A406 + (ML12305A406)
- ML12305A416 + (ML12305A416)
- L-MT-12-088, Initial Status Report in Response to March 12, 2012 Commission Order Modifying - Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML12305A420)
- NL-12-2224, Proposed Alternative VEGP-ISI-ALT-08 in Accordance with 10 CFR 50.55a(a)(3)(ii) Response to Request for Additional Information + (ML12305A421)
- BW120108, Readiness for 95001 Supplemental Inspection + (ML12305A423)
- ULNRC-05922, Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f) + (ML12305A426)
- DCL-12-110, Response to Recommendation 9.3 Communications Requests 1 and 3 and the Evaluation of Existing Communications Systems Power Supplies + (ML12305A427)
- ML12305A428 + (ML12305A428)
- ML12305A435 + (ML12305A435)
- ML12305A436 + (ML12305A436)
- IR 05000261/2012004 + (ML12305A443)
- ML12305A451 + (ML12305A451)
- ML12305A458 + (ML12305A458)
- PNO-I-12-007, Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1 + (ML12305A460)