ML12305A286

From kanterella
Jump to navigation Jump to search
Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12305A286
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/29/2012
From: Mike Perito
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EA-12-051, GNRO-2012/0130
Download: ML12305A286 (3)


Text

  • -=- Entergy Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 Michael Perito Vice President, Operations Grand Gulf Nuclear Station Tel. (601) 437-6409 GNRO-2012/0130 October 29, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Initial Status Report in Response to March 12,20 12 Commission Order Modifying Licenses with Regard to Requirements for Reliab le Spent Fuel Pool Instrumentation (Order Number EA-12-051)

Grand Gulf Nuclear Station, Unit NO.1 Docket No. 50-416 License No. NPF-29

REFERENCES:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (GNRI-2012/00057)
2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29,20 12 (ML12221A339)

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission ("NRC

" or "Commission")

issued an order (Reference 1) to Grand Gulf Nuclear Station (GGNS

). Reference 1 was immediately effective and directs GGNS to have a reliable indicat ion of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 30,20 12. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms GGNS has received Refere nce 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as descri bed in Attachment 2 of Reference 1.

GNRO-2012/0130 Page 2 of 3 Major activities completed during this reporting period:

  • Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.

Planned activities for the next six months:

  • Development and submittal of the overall integrated plan.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:

  • None at this time.

Project milestones schedule through completion of installation and testing:

  • A project milestones schedule will be provided with the overall integrated plan.
  • Implementation of the order will be completed for GGNS Unit NO.1 prior to startup from Refueling Outage (RFO) Spring 2016.

This letter contains no new regulatory commitments.

If you have any questions regarding this report, please contact Jeffery A. Seiter at 601-437-2344.

I declare under penalty of perjury that the foregoing is true and correct; executed on October 26, 2012.

MP / jas cc: (see next page)

GNRO-2012/0130 Page 3 of 3 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Alan Wang Mail Stop OWFN/8 G14 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert J. Fretz Jr.

OWFN, Mailstop # 4A15A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert L. Dennig OWFN, Mailstop # 10E1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner OWFN, Mailstop # 11 F1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Mr. Mr. Blake A. Purnell OWFN, Mailstop # 12020 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Mr. Steven R. Jones OWFN, Mailstop # 10A1 11555 Rockville Pike Rockville, MD 20852-2378