Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000228/2012201 + (ML120310173)
- ML120310274 + (ML120310274)
- ML120310311 + (ML120310311)
- IR 05000324/2011005 + (ML120310377)
- ML120310396 + (ML120310396)
- ML120310407 + (ML120310407)
- ML120310427 + (ML120310427)
- ML120310472 + (ML120310472)
- IR 05000333/2012302 + (ML120310565)
- ML120310645 + (ML120310645)
- ML12031A010 + (ML12031A010)
- ML12031A013 + (ML12031A013)
- ML12031A014 + (ML12031A014)
- ML12031A032 + (ML12031A032)
- 05000275/LER-2011-007-01, Regarding Inadequate Control Room Envelope Testing Due to Inadequately - Documented In-leakage Test Data + (ML12031A049)
- 05000266/LER-2011-001, Regarding Loss of Offsite Power to Unit 1 Safeguards Buses + (ML12031A069)
- GNRO-2012/00005, Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 2.1.1.2 + (ML12031A071)
- RS-12-020, Supplemental Information Supporting Request for Technical Specification Change for Minimum Critical Power Ration Safety Limit + (ML12031A073)
- ML12031A083 + (ML12031A083)
- ML12031A112 + (ML12031A112)
- IR 05000244/2011405 + (ML12031A116)
- ML12031A121 + (ML12031A121)
- ML12031A122 + (ML12031A122)
- ML12031A125 + (ML12031A125)
- 05000482/LER-2011-009-01, Regarding Inadequate Oil Analysis Causes Inoperable Auxiliary Feedwater Pump Longer than Allowed Outage Time + (ML12031A137)
- ML12031A138 + (ML12031A138)
- 05000461/LER-2011-004, Regarding Automatic Reactor Scram During Removal of Main Generator + (ML12031A145)
- ML12031A147 + (ML12031A147)
- ML12031A149 + (ML12031A149)
- WM 12-0003, Response to NRC Request for Additional Information Regarding 60-day Response to NRC Bulletin 2011-01,Mitigating Strategies + (ML12031A158)
- 05000324/LER-2011-002, For Brunswick, Unit 2, Regarding Unanalyzed Condition Due to Reactor Pressure Vessel (RPV) Head Detensioned During Startup + (ML12031A167)
- ML12031A168 + (ML12031A168)
- BSEP 12-0003, 2011 Sea Turtle Annual Report + (ML12031A169)
- ML12031A170 + (ML12031A170)
- ML12031A176 + (ML12031A176)
- ML12031A178 + (ML12031A178)
- ML12031A180 + (ML12031A180)
- IR 05000254/2011005 + (ML12031A181)
- ML12031A183 + (ML12031A183)
- LIC-12-0009, CFR 72.48 Evaluation Summary Report for July 23, 2010 Through December 31, 2011 + (ML12031A188)
- 05000397/LER-2012-001, Regarding DG-3 Inoperable for Longer than Allowed by TS Due to Failed Governor + (ML12031A193)
- ML12031A206 + (ML12031A206)
- ML12031A207 + (ML12031A207)
- ML12031A222 + (ML12031A222)
- ML12031A223 + (ML12031A223)
- ML12031A224 + (ML12031A224)
- PNP 2012-007, Special Report for Inoperability RIA-2327 of High Range Noble Gas Monitor + (ML12031A236)
- 05000255/LER-2011-004-01, For Palisades, Regarding Turbine-Driven Auxiliary Feedwater Pump Inoperable in Excess of Technical Specification Requirements Due to Unexpected Trip + (ML12031A237)
- PLA-6774, Request in Accordance with 10 CFR 50.55A(f)(4)(iv) for IST Components to Use Subsequent ASME Om Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval PLA-6774 + (ML12031A238)
- ML12031A248 + (ML12031A248)
- NLS2012002, Enclosure 2 to NLS2012002, Core Plant Bolt Stress Analysis Report (Non-Proprietary) + (ML12031A249)