Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000455/2011016 + (ML112770516)
- ML11277A005 + (ML11277A005)
- BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 248 + (ML11277A010)
- ML11277A012 + (ML11277A012)
- ML11277A013 + (ML11277A013)
- ML11277A016 + (ML11277A016)
- ML11277A017 + (ML11277A017)
- 05000354/LER-2011-001, For Hope Creek Generating Station, Regarding HPCI Operation Credit in UFSAR Scenario Not Supported by Existing Documentation + (ML11277A019)
- ML11277A020 + (ML11277A020)
- SBK-L-11185, Submittal of Procedure Er 3.4, Revision 21 + (ML11277A021)
- ML11277A022 + (ML11277A022)
- 05000324/LER-2011-001, For Brunswick, Unit 2, Regarding Condition Prohibited by Technical Specifications Due to RWCU Instrumentation Inoperable + (ML11277A025)
- ML11277A026 + (ML11277A026)
- ML11277A029 + (ML11277A029)
- ML11277A031 + (ML11277A031)
- ML11277A032 + (ML11277A032)
- NRC-2011-0247, H. B. Robinson Steam Electric Plant, Unit 2 - Federal Register Notice - Environmental Assessment + (ML11277A032)
- Press Release-11-188, Licensing Board to Conduct Hearing Oct. 31 in Rockville, Md., on South Texas Project New Nuclear Reactor Application + (ML11277A034)
- Press Release-11-189, NRC Sponsors Icrp Symposium Oct. 24-26 in MD on International System of Radiological Protection + (ML11277A042)
- ML11277A046 + (ML11277A046)
- ML11277A047 + (ML11277A047)
- ML11277A049 + (ML11277A049)
- ML11277A113 + (ML11277A113)
- ML11277A131 + (ML11277A131)
- ML11277A148 + (ML11277A148)
- ML11277A163 + (ML11277A163)
- ML11277A239 + (ML11277A239)
- ML11277A240 + (ML11277A240)
- IR 05000461/2011301 + (ML11277A252)
- IR 05000269/2011018 + (ML11277A253)
- ML11277A265 + (ML11277A265)
- ML11277A267 + (ML11277A267)
- SBK-L-11181, License Amendment Request 11-05, Regarding Cold Leg Injection Permissive + (ML11277A268)
- SBK-L-11191, Third Ten-Year Interval Inservice Inspection Relief Requests + (ML11277A269)
- ML11277A270 + (ML11277A270)
- Press Release-11-190, NRC to Discuss Prioritizing Recommendations of Near-Term Japan Task Force Oct. 11 in Rockville, Md + (ML11277A280)
- ML11277A284 + (ML11277A284)
- ML11277A285 + (ML11277A285)
- ML11277A286 + (ML11277A286)
- ML112780054 + (ML112780054)
- ML112780095 + (ML112780095)
- PNO-III-11-012, Perry - Unplanned Shutdown Greater than 72 Hours + (ML112780137)
- 05000263/LER-1979-003-01, /01T-0 on 790301:containment Vent & Purge Isolation Valves Would Not Close During DBA-LOCA.Cause Unknown.Fisher Continential 18 & 20 Inch,Type 9220 Butterfly Valves Opening Is Administratively Controlled + (ML112780151)
- ML112780152 + (ML112780152)
- 05000263/LER-1979-008-01, /01T-0 on 790323:one Trip Output Relay Failed to Initiate Trip in No 12 Recirculation Motor Generator Set Field Breaker Trip Logic.Caused by Contact Which Was Disengaged from Socket.Contact re-engaged in Socket + (ML112780153)
- 05000263/LER-1979-005-03, /03L-0 on 790315:results of Special Test of Safety Relief Valve Effects on Torus Indicated Possible Excessive Opening Delay Time.Caused by Improper Installation of Insulation on Valve 67F.Maint Procedure to Modified + (ML112780156)
- 05000263/LER-1979-007-03, /03L-0 on 790318:valve Operability & Motor Current Check Signed Despite Current Outside Formula Spec.Caused by Misaligned Torque Switch.New Components Ordered + (ML112780160)
- DD-11-06, Letter from Annette L. Vietti-Cook, Secretary to Thomas Saporito Directors Decision DD-11-06 + (ML112780187)
- IR 05000255/2011012 + (ML112780190)
- ML112780266 + (ML112780266)