Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML111661005 + (ML111661005)
- ML111661007 + (ML111661007)
- ML111661017 + (ML111661017)
- ML111661019 + (ML111661019)
- ML111661085 + (ML111661085)
- ML111661087 + (ML111661087)
- ML111661097 + (ML111661097)
- ML111661099 + (ML111661099)
- ML111661113 + (ML111661113)
- ML111661115 + (ML111661115)
- ML111661324 + (ML111661324)
- 05000305/LER-1980-044-03, /03L-0:on 801229,noted That RCS Oxygen Sample Test Not Performed W/Frequency Required by Tech Specs.Caused by Personnel Error.Personnel Will Be Instructed in Implementation of Procedure + (ML111661460)
- ML111661461 + (ML111661461)
- ML111661466 + (ML111661466)
- ML111661467 + (ML111661467)
- 05000305/LER-1981-003-03, /03L-0:on 810122,supply Thermal Overloads Tripped During Testing of Valve CC400B (Component Cooling Water Inlet to Residual Heat Exchanger 1B).Caused by Wiring Error. Wiring Fault Identified & Corrected + (ML111661482)
- ML111661483 + (ML111661483)
- 05000305/LER-1981-010-01, /01T-0:on 810330,nonradioactive Liquid Found Discharged from Waste Neutralizing Tank to Svc Water Pretreatment Lagoon.Caused by Error in Calculation of Allowable Discharge Rates.Proposed Tech Spec Submitted + (ML111661509)
- ML111661510 + (ML111661510)
- 05000305/LER-1981-013-03, /03L-0:on 810422,during Facility Shutdown for Leak Rate Test,Investigation Revealed Cracked Root Weld on Vent Valve of Containment Sump B to RHR Pump 1B Piping.Caused by Sharp Blow of Unknown Origin.Repair Scheduled + (ML111661518)
- ML111661637 + (ML111661637)
- ML111661766 + (ML111661766)
- ML111661798 + (ML111661798)
- ML111661875 + (ML111661875)
- ML111661877 + (ML111661877)
- ML111661880 + (ML111661880)
- ML111661914 + (ML111661914)
- ML111662005 + (ML111662005)
- ML111662021 + (ML111662021)
- ML111662049 + (ML111662049)
- ML111662066 + (ML111662066)
- ML111662070 + (ML111662070)
- ML111662174 + (ML111662174)
- ML111662188 + (ML111662188)
- ML111662200 + (ML111662200)
- ML111662229 + (ML111662229)
- ML11166A020 + (ML11166A020)
- ML11166A028 + (ML11166A028)
- ML11166A029 + (ML11166A029)
- ML11166A037 + (ML11166A037)
- Press Release-III-11-020, NRC Schedules Public Meeting for June 15 to Discuss Davis-Besse Nuclear Power Plant Performance and NRC Oversight + (ML11166A044)
- ML11166A045 + (ML11166A045)
- Press Release-11-103, Licensing Board to Hold Teleconference Oral Argument June 27 on South Texas Project Reactor License Renewal Application + (ML11166A046)
- Press Release-11-102, Joint Press Release on Cooperation Regarding the Accident at TEPCO? Fukushima Dai-ichi Nuclear Power Plant; Gregory Jaczko, Chairman, Nuclear Regulatory Commisison, Goshi Hosono, Special Adviser to the Prime Minister O + (ML11166A047)
- Press Release-11-104, NRC Issues Final Safety Culture Policy Statement + (ML11166A058)
- Press Release-11-105, Nuclear Regulatory Commission Honors Employees June 14 in Rockville, MD + (ML11166A059)
- Press Release-I-11-019, NRC to Hold Public Meeting on June 8th in Seabrook, N.H., to Discuss Annual Assessment of Seabrook Nuclear Power Plant + (ML11166A060)
- Press Release-11-106, NRC Schedules Public Meeting June 23 to Discuss Implementing Fingerprint Rule for Research and Test Reactors + (ML11166A061)
- Press Release-11-107, NRC Issues License to TVA Authorizing Receipt of Fresh Nuclear Fuel for Watts Bar Nuclear Plant, Unit 2 + (ML11166A062)
- Press Release-11-108, NRC Schedules Public Meeting June 21 to Discuss Implementing Revisions to the Environmental Protection Regulations Rule for License Renewal of Nuclear Power Plants + (ML11166A065)
- Press Release-11-109, Opening Remarks of NRC Chairman Gregory B. Jaczko at the 60-Day Update from the Japan Task Force + (ML11166A066)