ML11166A037
| ML11166A037 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/10/2011 |
| From: | John Carlin Constellation Energy Group, EDF Group, Ginna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BL-11-001 | |
| Download: ML11166A037 (2) | |
Text
John Carlin Site Vice President CENG.
a joint venture of Co**neltion
'eDF Energ10 R.E. Ginna Nuclear Power Plant, LL(
1503 Lake Road Ontario, New York 14519-9364 585.771.5200 585.771.3943 Fax john.carlin.cenqllc.com R.E. GINNA NUCLEAR POWER PLANT June 10, 2011 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION:
SUBJECT:
Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 30 Day Response to NRC Bulletin 2011-01: Mitigating Strategies (1) NRC Bulletin 2011-01: Mitigating Strategies; Dated May 11,2011, (MLI 11250360)
(2) Letter from Douglas V. Picket (NRC) to John Carlin (Ginna LLC) dated July 26, 2007, R.E. Ginna Nuclear Power Plant -
Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026. (TAC No. MD4535) (ML072040409)
REFERENCES:
On May 11, 2011, NRC Bulletin 2011-01: Mitigating Strategies, Reference (1) was issued in order to confirm continued compliance with 10 CFR 50.54(hh)(2). R.E. Ginna Nuclear Power Plant LLC (Ginna LLC) 30 day response is as listed below:
- 1. Is the equipment necessary to execute the mitigating strategies, as described in your submittals to the NRC, available and capable of performing its intended function?
R.E. Ginna Nuclear Power Plant LLC (Ginna LLC) confirms that the equipment necessary to execute the mitigating strategies as approved by Reference (2) is available and capable of performing its intended function.
- 2. Are the guidance and strategies implemented capable of being executed considering the current configuration of your facility and current staffing and skill levels of the staff?
R.E. Ginna Nuclear Power Plant LLC (Ginna LLC) confirms continued compliance with 10 CFR 50.54(hh)(2) by maintaining executable guidance and strategies. The aforementioned guidance and strategies consider current facility configuration, staffing levels and staff skill levels.
44L41Q jji24~
W~PLAIEC -J OOQW'-I%
Document Control Desk June 10, 2011 Page 2 If there are any questions or if additional information is required, please contact Mr.
Thomas Harding at (585) 771-5219 or at Thomas.HardinqJr(ccenqllc.com STATE OF NEW YORK:
TO WIT:
COUNTY OF WAYNE:
I, John Carlin, being duly sworn, state that I am Vice President, R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC), and that I am duly authorized to execute and file this request on behalf of Ginna LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Ginna LLC employees and/or consultants. Suc n
at n h been reviewed in accordance with company practice and I believe it be r I
Subscribed apd sworn before me, a Notary Public in and for the State of New York and County of JVl*
O P-O C, this day of /6jL
-C', 2011.
WITNESS my Hand and Notarial Seal:
My Commission Expires:
Date Notary PublicT SHARON L MILLER Notar Public, State of New.York Registration No. 01Mt6017755-Monroe County Commission Expires December 21, 2 LI-CC:
W. M. Dean, NRC D.V. Pickett, NRC Resident Inspector, NRC (Ginna)