Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML092920125 + (ML092920125)
- ML092920126 + (ML092920126)
- ML092920127 + (ML092920127)
- IR 05000280/2009301 + (ML092920128)
- ML092920129 + (ML092920129)
- ML092920131 + (ML092920131)
- ML092920134 + (ML092920134)
- ML092920137 + (ML092920137)
- ML092920156 + (ML092920156)
- NG-09-0764, Response to Request for Additional Information Regarding the Review of the License Renewal Application + (ML092920157)
- ML092920158 + (ML092920158)
- ML092920160 + (ML092920160)
- ML092920163 + (ML092920163)
- LR-N09-0220, Relaxation of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel + (ML092920165)
- ML092920168 + (ML092920168)
- ML092920182 + (ML092920182)
- ML092920184 + (ML092920184)
- ML092920185 + (ML092920185)
- ML092920186 + (ML092920186)
- ML092920187 + (ML092920187)
- ML092920190 + (ML092920190)
- ML092920191 + (ML092920191)
- ML092920280 + (ML092920280)
- IR 05000269/2009403 + (ML092920282)
- ML092920297 + (ML092920297)
- ML092920331 + (ML092920331)
- PNO-III-09-012, Perry, Manual Reactor Scram During Planned Shutdown + (ML092920340)
- ML092920347 + (ML092920347)
- 05000325/LER-2009-003, High Pressure Coolant Injection (HPCI) Inoperable Due to Automatic Closure of Inboard Isolation Valve + (ML092920353)
- IR 05000277/2009403 + (ML092920382)
- OI 4-2009-059, Ltr to Edward D. Halpin, Executive Vice President, STP Nuclear Operating Company, South Texas Project, from William B. Jones, Chief, Aces, Closure of Investigation (OI 4-2009-059), 10/19/2009 + (ML092920393)
- ML092920405 + (ML092920405)
- ML092920427 + (ML092920427)
- Press Release-II-09-058, NRC Begins Special Inspection at Nuclear Fuel Services + (ML092920431)
- NRC-09-0046, Modeling Scenarios for License Termination Plan Criteria + (ML092920460)
- ML092930010 + (ML092930010)
- ML092930015 + (ML092930015)
- Information Notice 2010-03, Failures of Motor-Operated Valves Due to Degraded Stem Lubricant + (ML092930025)
- 05000286/LER-2009-006, Re Automatic Trip Due to a Turbine-Generator Trip Caused by Actuation of the Generator Protection System Lockout Relay During a Severe Storm with Heavy Lightning + (ML092930088)
- ET 09-0019, Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System + (ML092930130)
- BW090095, Submittal of Analytical Evaluation in Accordance with IWC-3125(b) + (ML092930134)
- ML092930135 + (ML092930135)
- ML092930142 + (ML092930142)
- ML092930146 + (ML092930146)
- ML092930148 + (ML092930148)
- ML092930152 + (ML092930152)
- L-MT-09-096, Required 30-Day Offsite Dose Calculation Manual Report for the Monticello Nuclear Generating Plant + (ML092930153)
- RA-09-068, Sea Turtle Incidental Take Reports 2009-6, 2009-7, 2009-8, and 2009-9 + (ML092930168)
- NOC-AE-09002477, Revised Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue + (ML092930172)
- ML092930172 + (ML092930172)
- ML092930182 + (ML092930182)