Comment (5) of David P. Helker on Behalf of Exelon Generation Company, LLC Opposing Draft Regulatory Guide DG-1222, Control of Preheat Temperature for Welding of Low-Alloy Steel.ML092930148 |
Person / Time |
---|
Site: |
Dresden, Peach Bottom, Point Beach, Byron, Braidwood, Limerick, Quad Cities, Zion, LaSalle |
---|
Issue date: |
10/01/2009 |
---|
From: |
David Helker Exelon Corp, Exelon Generation Co, Exelon Nuclear |
---|
To: |
Rulemaking, Directives, and Editing Branch |
---|
References |
---|
74FR31993 00005, DG-1222 |
Download: ML092930148 (1) |
|
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML23033A4602023-01-12012 January 2023 Comment (471) of Marguerite Winkel on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2 ML22010A0502022-01-0707 January 2022 Comment (274) E-mail Regarding Point Beach Draft SEIS ML22010A0452022-01-0606 January 2022 Comment (270) E-mail Regarding Point Beach Draft SEIS ML22010A0462022-01-0606 January 2022 Comment (271) E-mail Regarding Point Beach Draft SEIS ML22010A0482022-01-0606 January 2022 Comment (272) E-mail Regarding Point Beach Draft SEIS ML22010A0492022-01-0606 January 2022 Comment (273) E-mail Regarding Point Beach Draft SEIS ML22006A2442022-01-0505 January 2022 Comment (227) E-mail Regarding Point Beach Draft SEIS ML22006A2452022-01-0505 January 2022 Comment (228) E-mail Regarding Point Beach Draft SEIS ML22006A2462022-01-0505 January 2022 Comment (229) E-mail Regarding Point Beach Draft SEIS ML22006A2472022-01-0505 January 2022 Comment (230) E-mail Regarding Point Beach Draft SEIS ML22006A2552022-01-0404 January 2022 Comment (232) E-mail Regarding Point Beach Draft SEIS ML22006A2532022-01-0404 January 2022 Comment (231) E-mail Regarding Point Beach Draft SEIS ML22018A0812022-01-0404 January 2022 Comment (276) E-mail Regarding Point Beach Draft SEIS ML22006A2582022-01-0404 January 2022 Comment (233) E-mail Regarding Point Beach Draft SEIS ML22006A3372022-01-0404 January 2022 Comment (266) E-mail Regarding Point Beach Draft SEIS ML22006A3392022-01-0404 January 2022 Comment (267) E-mail Regarding Point Beach Draft SEIS ML22006A1932022-01-0404 January 2022 Comment (201) E-mail Regarding Point Beach Draft SEIS ML22004A3782022-01-0303 January 2022 Comment (46) of Kevin Kamps on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3772022-01-0303 January 2022 Comment (45) of Ann Behrmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3752022-01-0303 January 2022 Comment (43) of Mary Able on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3762022-01-0303 January 2022 Comment (44) of Wendy Fast on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22018A0802022-01-0303 January 2022 Comment (275) E-mail Regarding Point Beach Draft SEIS ML22006A3362022-01-0303 January 2022 Comment (265) E-mail Regarding Point Beach Draft SEIS ML22004A3732022-01-0303 January 2022 Comment (42) of Jorge De Cecco on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3712022-01-0303 January 2022 Comment (41) on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3702022-01-0303 January 2022 Comment (40) of Kelsey Saari on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A0882022-01-0303 January 2022 Comment (152) E-mail Regarding Point Beach Draft SEIS ML22006A0892022-01-0303 January 2022 Comment (153) E-mail Regarding Point Beach Draft SEIS ML22006A0902022-01-0303 January 2022 Comment (154) E-mail Regarding Point Beach Draft SEIS ML22006A0912022-01-0303 January 2022 Comment (155) E-mail Regarding Point Beach Draft SEIS ML22006A0932022-01-0303 January 2022 Comment (156) E-mail Regarding Point Beach Draft SEIS ML22006A0962022-01-0303 January 2022 Comment (157) E-mail Regarding Point Beach Draft SEIS ML22006A1012022-01-0303 January 2022 Comment (158) E-mail Regarding Point Beach Draft SEIS ML22006A1022022-01-0303 January 2022 Comment (159) E-mail Regarding Point Beach Draft SEIS ML22006A1032022-01-0303 January 2022 Comment (160) E-mail Regarding Point Beach Draft SEIS ML22006A1042022-01-0303 January 2022 Comment (161) E-mail Regarding Point Beach Draft SEIS ML22006A1072022-01-0303 January 2022 Comment (162) E-mail Regarding Point Beach Draft SEIS ML22006A1082022-01-0303 January 2022 Comment (163) E-mail Regarding Point Beach Draft SEIS ML22006A1102022-01-0303 January 2022 Comment (164) E-mail Regarding Point Beach Draft SEIS ML22004A3592022-01-0303 January 2022 Comment (30) of Henry Berkowitz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A2062022-01-0303 January 2022 Comment (207) E-mail Regarding Point Beach Draft SEIS ML22006A2052022-01-0303 January 2022 Comment (206) E-mail Regarding Point Beach Draft SEIS ML22006A2042022-01-0303 January 2022 Comment (205) E-mail Regarding Point Beach Draft SEIS ML22006A1962022-01-0303 January 2022 Comment (202) E-mail Regarding Point Beach Draft SEIS ML22006A2002022-01-0303 January 2022 Comment (203) E-mail Regarding Point Beach Draft SEIS ML22006A2032022-01-0303 January 2022 Comment (204) E-mail Regarding Point Beach Draft SEIS ML22006A1112022-01-0202 January 2022 Comment (165) E-mail Regarding Point Beach Draft SEIS ML22004A3682022-01-0202 January 2022 Comment (38) of Bonita Staas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3672022-01-0202 January 2022 Comment (37) of Hannag Mortensen on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3652022-01-0202 January 2022 Comment (36) of Katherine Bauer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 2023-01-12
[Table view] |
Text
_,Exekon.
r" Exelon Nuclear www.exeloncorp.com Nuclear 200 Exelon Way Nuclear Kennett Square, PA 19348
ii*, !: II
October 1, 2009 Rulemaking and Directives Branch.,....5....
Office of Administration Mail Stop TWB-05-BO1 M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Comments Concerning Draft Regulatory Guide DG-1222, "Controlof PreheatTemperature for Welding of Low-Alloy Steel" (Federal Register Notice 74FR31993, dated July 6, 2009)
Exelon Generation Company, LLC (Exelon) is submitting this letter in response to a request from the Nuclear Regulatory Commission (NRC) for comments concerning Draft Regulatory Guide DG-1222, "Controlof PreheatTemperature for Welding of Low-Alloy Steel." DG-1222 is proposed Revision 1 to Regulatory Guide 1.50 (same title), dated May 1973.
10CFR50, Appendix B, requires that measures be established to ensure control of materials and of special processes such as welding and that proper process monitoring be performed.
DG-1222 describes a method acceptable to the NRC for implementing these requirements with regard to the control of welding for low-alloy steel components during initial fabrication.
Exelon appreciates the opportunity to comment on DG-1222, and offers the following comments for consideration by the NRC.
General Comments Section C, "Regulatory Position" Item 2 states that: "Forproduction welds, the preheat temperature should be maintaineduntil final postweld heat treatment or a hydrogen bakeout is performed between 200 and 400 0C (400 and 750 "F) for a minimum of four hours.... " Exelon considers the minimum "four-hour" period to be excessive for leaner material chemistries, thinner materials, and standard groove weld joint design and high heat input weld processes. Exelon suggests that a graduated scale approach be considered to allow for the variance associated with the factors previously discussed.
If you have any questions or require additional information, please do not hesitate to contact Mr.
Richard Gropp at 610-765-5557.
Respectfully, David P. Helker - S -* * -* '
Manager - Licensing