Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML18094A804 | 10 April 2018 | Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 |
ML17038A515 | 3 February 2017 | NRR E-mail Capture - (External_Sender) Oyster Creek Nuclear Generating Station Response to Environmental Questions Regarding the Mitigating Strategies Final Integrated Plan and SPF Instrumentation Compliance Letter |
ML16228A062 | 15 August 2016 | Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin |
RA-14-092, Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 25 November 2014 | Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-13-023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML061450592 | 26 May 2006 | Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report |
ML041250440 | 6 May 2004 | G20040272 - J. M. Parks Ltr. Re. Oyster Creek License Extension |
ML032040059 | 11 July 2003 | 10 CFR 50.59 Summary Report for the Period July 2000 Through December 2002 |
ML20070B097 | 20 June 1994 | Informs That Util Completed Addition of Double Angle Cross Braces to Bottom Chord of Reactor Bldg Roof Framing, Necessary for Resolution of SEP Topic III-2, Wind & Tornado Loadings |
ML20125C351 | 7 December 1992 | Discusses Evaluation of Upper Reactor Building & non-safety Architectural Components Subjected to tornado-wind Loading. Upper steel-framed Portion of Reactor Bldg Will Withstand tornado-wind Loading Generated by Total wind-speed |
ML20125C390 | 7 December 1992 | Safety Evaluation Re Upper Reactor Bldg & Nonsafety Architectural Components Subjected to tornado-wind Loading |
ML20065Q366 | 7 December 1990 | Application for Amend to License DPR-16,consisting of Tech Spec Change Request 192,permitting Draining of 15,000 Gallon Emergency Diesel Generator Fuel Oil Tank to Conduct Internal Insp & Possible Replacement |
ML20058H709 | 15 November 1990 | Discusses Integrated Plant Safety Assessment Sections 4.3 Re Wind & Tornado Loadings & 4.6 Re Tornado Missiles.Upper Reactor Bldg Structure Will Be Upgraded by Adding Cross Braces to Roof Framing |
ML20247H492 | 24 July 1989 | Discusses SEP Topic III-4A Re Tornado Generated Loading on Diesel Generator Bldg.Diesel Generator Bldg at Plant Adequately Protected from Postulated Tornado Missiles & Tornado Wind |
ML20151X793 | 12 August 1988 | Forwards Responses to 880526 Request for Addl Info Re SEP Topic III-4A, Tornado Missile |
ML20151L899 | 28 July 1988 | Summary of 880713 Progress Review Meeting W/Util in Rockville,Md Re Status of Licensing Actions.List of Participants & marked-up Copy of Staff Regulatory Info Tracking Sys Encl |
ML20149H833 | 10 February 1988 | Summary of 880106 Meeting W/Util & State of Nj in Bethesda,Md Re Status of Plant Licensing actions.Marked-up Licensing Action Rept,List of Attendees,Util Topical Rept on Fuel Reload Review & Cycle 12 Reload Schedule Encl |
ML20238A736 | 14 August 1987 | Discusses SEP Topic II-3B, Flooding Potential... & III-4A, Tornado Missiles. Util Upgrading Applicable Plant Emergency Operating Procedures to Reflect Method to Achieve Safe Shutdown If External Sources of Water Lost |
ML20128G390 | 3 July 1985 | Submits Proposed Resolution of NRC Concerns Re SEP Topic III-4.A on Tornado Missiles & Safe Shutdown Capability. Proposes Using Main Core Spray Pump to Supply Isolation Condenser.Sys Will Be Implemented During Cycle 11 |
ML20093M293 | 30 September 1984 | Addendum to Util Pole Tornado Missile Analysis of Diesel Generator Compartments & Reactor Bldg Airlock Structure at Oyster Creek Nuclear Generating Station |
ML20091J113 | 31 May 1984 | Forwards Updated Schedule of Submittal Dates for Remaining SEP Topic Evaluation Items,Per 830810 Transmittal of 35 Items Requiring Refined Engineering Analyses or Continued Evaluations |
ML20078F897 | 4 October 1983 | Forwards Status of NUREG-0822 Issues Requiring Refined Engineering Analysis or Continuation of Ongoing Evaluation, Per 830810 Request.Addl Submittal Dates Inadvertently Omitted by Nrc,Indicated by Asterisks |
ML20078A026 | 16 September 1983 | Forwards Rev 1 to Oyster Creek Tornado Missile Risk Analysis, Per SEP Topic III-4.A.Tornado Missiles W/Potential to Disable Listed Structures Have Negligible Contribution to Core Melt Frequency |
ML20078A035 | 31 August 1983 | Rev 1 to Oyster Creek Tornado Missile Risk Analysis |
ML20070T017 | 31 October 1982 | Responses to NRC Questions for SEP Topic III-2:Wind & Tornado Loadings |
ML20054H722 | 21 June 1982 | Forwards Draft Evaluation of SEP Topic III-4.A, Tornado Missiles, Per NRC 820518-19 Site Visit.Some Sys at Site Not Adequately Protected from Tornado Generated Missiles.Exam of Facts Upon Which NRC Based Evaluation Requested |
ML20041B005 | 18 February 1982 | Submits Util Schedule for Completing Safety Assessment of Remaining SEP Topics & Addl Info Requested by NRC Staff at 811222 Meeting |
ML20008F960 | 7 May 1981 | Forwards Draft Assessments for SEP Topics XV-1,XV-3,XV-4, XV-5,XV-9,XV-20,XV-11,XV-13,XV-14,XV-15,XV-18,XV-19,XV-24, II-4,II-4.B,II-4.C,II-3.A,II-3.B,II-3.B.1,II-3.C,III-2, III-3.A,III-4.D,II-1.A,II.1.B & II.1.C |