Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML18094A80410 April 2018Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109
ML17038A5153 February 2017NRR E-mail Capture - (External_Sender) Oyster Creek Nuclear Generating Station Response to Environmental Questions Regarding the Mitigating Strategies Final Integrated Plan and SPF Instrumentation Compliance Letter
ML16228A06215 August 2016Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin
RA-14-092, Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions25 November 2014Supplemental Response to RAI Re Request for Extension to Comply with NRC Order EA-13-109: Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
RS-13-023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML06145059226 May 2006Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report
ML0412504406 May 2004G20040272 - J. M. Parks Ltr. Re. Oyster Creek License Extension
ML03204005911 July 200310 CFR 50.59 Summary Report for the Period July 2000 Through December 2002
ML20070B09720 June 1994Informs That Util Completed Addition of Double Angle Cross Braces to Bottom Chord of Reactor Bldg Roof Framing, Necessary for Resolution of SEP Topic III-2, Wind & Tornado Loadings
ML20125C3517 December 1992Discusses Evaluation of Upper Reactor Building & non-safety Architectural Components Subjected to tornado-wind Loading. Upper steel-framed Portion of Reactor Bldg Will Withstand tornado-wind Loading Generated by Total wind-speed
ML20125C3907 December 1992Safety Evaluation Re Upper Reactor Bldg & Nonsafety Architectural Components Subjected to tornado-wind Loading
ML20065Q3667 December 1990Application for Amend to License DPR-16,consisting of Tech Spec Change Request 192,permitting Draining of 15,000 Gallon Emergency Diesel Generator Fuel Oil Tank to Conduct Internal Insp & Possible Replacement
ML20058H70915 November 1990Discusses Integrated Plant Safety Assessment Sections 4.3 Re Wind & Tornado Loadings & 4.6 Re Tornado Missiles.Upper Reactor Bldg Structure Will Be Upgraded by Adding Cross Braces to Roof Framing
ML20247H49224 July 1989Discusses SEP Topic III-4A Re Tornado Generated Loading on Diesel Generator Bldg.Diesel Generator Bldg at Plant Adequately Protected from Postulated Tornado Missiles & Tornado Wind
ML20151X79312 August 1988Forwards Responses to 880526 Request for Addl Info Re SEP Topic III-4A, Tornado Missile
ML20151L89928 July 1988Summary of 880713 Progress Review Meeting W/Util in Rockville,Md Re Status of Licensing Actions.List of Participants & marked-up Copy of Staff Regulatory Info Tracking Sys Encl
ML20149H83310 February 1988Summary of 880106 Meeting W/Util & State of Nj in Bethesda,Md Re Status of Plant Licensing actions.Marked-up Licensing Action Rept,List of Attendees,Util Topical Rept on Fuel Reload Review & Cycle 12 Reload Schedule Encl
ML20238A73614 August 1987Discusses SEP Topic II-3B, Flooding Potential... & III-4A, Tornado Missiles. Util Upgrading Applicable Plant Emergency Operating Procedures to Reflect Method to Achieve Safe Shutdown If External Sources of Water Lost
ML20128G3903 July 1985Submits Proposed Resolution of NRC Concerns Re SEP Topic III-4.A on Tornado Missiles & Safe Shutdown Capability. Proposes Using Main Core Spray Pump to Supply Isolation Condenser.Sys Will Be Implemented During Cycle 11
ML20093M29330 September 1984Addendum to Util Pole Tornado Missile Analysis of Diesel Generator Compartments & Reactor Bldg Airlock Structure at Oyster Creek Nuclear Generating Station
ML20091J11331 May 1984Forwards Updated Schedule of Submittal Dates for Remaining SEP Topic Evaluation Items,Per 830810 Transmittal of 35 Items Requiring Refined Engineering Analyses or Continued Evaluations
ML20078F8974 October 1983Forwards Status of NUREG-0822 Issues Requiring Refined Engineering Analysis or Continuation of Ongoing Evaluation, Per 830810 Request.Addl Submittal Dates Inadvertently Omitted by Nrc,Indicated by Asterisks
ML20078A02616 September 1983Forwards Rev 1 to Oyster Creek Tornado Missile Risk Analysis, Per SEP Topic III-4.A.Tornado Missiles W/Potential to Disable Listed Structures Have Negligible Contribution to Core Melt Frequency
ML20078A03531 August 1983Rev 1 to Oyster Creek Tornado Missile Risk Analysis
ML20070T01731 October 1982Responses to NRC Questions for SEP Topic III-2:Wind & Tornado Loadings
ML20054H72221 June 1982Forwards Draft Evaluation of SEP Topic III-4.A, Tornado Missiles, Per NRC 820518-19 Site Visit.Some Sys at Site Not Adequately Protected from Tornado Generated Missiles.Exam of Facts Upon Which NRC Based Evaluation Requested
ML20041B00518 February 1982Submits Util Schedule for Completing Safety Assessment of Remaining SEP Topics & Addl Info Requested by NRC Staff at 811222 Meeting
ML20008F9607 May 1981Forwards Draft Assessments for SEP Topics XV-1,XV-3,XV-4, XV-5,XV-9,XV-20,XV-11,XV-13,XV-14,XV-15,XV-18,XV-19,XV-24, II-4,II-4.B,II-4.C,II-3.A,II-3.B,II-3.B.1,II-3.C,III-2, III-3.A,III-4.D,II-1.A,II.1.B & II.1.C