Text
e s
GFU Nuclear g
g{
P.O. Box 388 Forked River, New Jersey 08731 609-693-6000 Writer's Direct Dial Number:
October 4, 1983 Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Crutchfield:
Subject:
Oyster Creek Nuclear Generating Station SEP IPSAR Supplement Docket No. 50-219 Your letter of August 10, 1983 requested that GPU Nuclear provide an updated schedule of the SEP issues which require refined engineering analyses or continuation of ongoing evaluations. The letter also transmitted a table which lists the original commitment dates for submittal of all open issues and actual submittal dates for those topics whose analyses had already been submitted.
As shown in the attachment, we have included additional actual submittal dates which were inadvertently omitted by the NRC staff (indicated by asterisks). Also included are dates of recent submittals.
According to our records, most of the evaluations (approximately seventy i
percent) which were originally scheduled to be submitted by this date have l
already been transmitted to you. Some of the delays were caused by:
further analyses necessitated by the initial evaluation results, unavailability of a l
computer code in a timely manner and diversion of manpower to support the ongoing refueling outage.
As our practice has been in the past, we will continue to inform the NRC Project Manager for the Oyster Creek Systematic l
Evaluation Program of any delays, with justification and new submittal date.
Very truly yours, 1
,A 1
yLV Pet 5r 8. Fiedler l
Vice President and Director Oyster Creek PBF/ dam j
Enclosure D ')
- D
\\\\
8310110217 831 ooh;9 DR ADOCK 050002 PDR GPU Nuclear is a part of the General Pubhc UOhties System
o cc: Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l
NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731
At tachc:ent
}
OYSTER CREEK NUCLEAR GENERATING STATION STATUS OF ISSUES FROM NUREG-0822 REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONGOING EVALUATION SEP Licensee Actual Staff SER i
IPSAR Topic Commitment Submittal Issue Section Title Reference for Submittal Date Date Coments
- y 1.
4.1(7)
Flooding II-3.C 2/83 6/6/83 6/23/83 2.
4.3.1 Wind and III-2 12/82 2/2/83 4.3.2 Tornado Loadings 12/82 2/2/83 4.3.3 10/83 4.3.6 12/82 & 10/83 2/2/83*
Analysis of Reactor Bldg i 4.3.7 12/82 2/2/83*
roof capacity for tor-nado wind load was submitted on 3.
4.4(2)
Hydrostatic III-3.A 4/83 7/1/83 2/2/83.
j Loads 4.
4.6.1 Tornado Missiles III-4.A 3/83 9/16/83 4.6.2 1/83 9/16/83 4.6.4 12/84 5.
4.7 Turbine Missiles III-4.B 10/83 6.
4.8.2 Aircraft Hazards III-4.D 3/83 3/4/83*
5/3/83*
7.
4.10(2)
Emergency Conden-111-5.8 10/s3 ser Isolation B.
4.11(1)
Seismic III-6 Cycle X s
By letter dated 6/24/83 4.11(2) 12/82 1/20/83* r. 1/24/83*
staff requested
, 4.11(3)
Cycle X+8 months methodology and criteria 4.11(5)
Cycle X submittal by 11/30/83 9.
4.12 Design Codes III-7.B 12/83
- 10. 4.14(1)
Thermal Over-III-10.A 2/84 load Bypass
- 11. 4.16.1 Leak Detection V-5 1/84 4.16.2 Cycle X
SEP Licensee Actual Staff SER IPSAR Topic Commitment Submittal Issue Section Title Reference for Submittal Date Date Comnents
- 12. 4.17 RV Integrity V-6 12/82 3/10/83 4/28/83
- 13. 4.19 High/ Low Pressure V-11. A 1/83 R/4/83 Isolation
- 14. 4.20 Water Purity VI-12.A Cycle X
- 15. 4.23 ECCS Actuation VI-7.A.3 Cycle X
- 16. 4.25(1)
Automatic Bus VI-7.C.1 12/82 9/1/83 Transfers
- 17. 4.26.2 RTS Testing VI-10.A Cycle X 18, 4.27(1)
RPS Isolation VII-1.A 10/83 19, 4.31 On-site Power VIII-2 12/82 11/16/82*
(Diesel Generator)
- 20. 4.32 DC Monitoring VIII-3.B Cycle X 11/16/82 letter provided schedule for hardware mods
. Cycle X.
11/29/82 letter stated interim steps would be inplace by Cycle X 21, 4.34(3)
Ventilation IX-5 3/83 9/1/83 6/22/83 NRC letter Systems requested info. On battery 4.34(4) 1/84 connection integrity as part of final resolution
- 22. 4.26 Primary Coolant XV-16 Cycle X Activ ity T.S.
23.
4.38 MSIV Leakage XV-19 Cycle X Subnit results of review on maintenance practices and
' identify any needed enrrect ive ar. tion
..