GPU Nuclear Corporation Nuclear
- en:r388 o
Forked River, New Jersey 08731-0388 609 971-4000 Wnter's Direct Dial Number; C321-94-2095 June 20,1994 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219 Facility Operating License No. DPR-16 Oyster Creek SEP Topic 111-2, " Wind and Tornado Loadings"
References:
(1) GPU Nuclear Letter C321-90-2003," Integrated Plant Safety Assessment Sections 4.3, Wind and Tornado Loadings, and 4.6, Tornado Missiles," dated November 15,1990.
(2) NRC Safety Evaluation, " Evaluation of Upper Reactor Building and Non-Safety Architectural Components Subjected to Tornado-Wind Loading Items 1 and 11 of SEP Topic III-2 (TAC No. M79165)," dated December 7,1992.
GPU Nuclear committed in Reference i to upgrade the Reactor Building structure by adding cross braces to the roof framing. Reference 1 also identified the wind speed and associated probabilities for (1) FSAR design, (2) the pre-modification (existing) configuration, and (3) the post-modification configuration.
GPU Nuclear has completed the modifications to the Reactor Building roof (i.e.,
addition of double angle cross braces to the bottom chord of the Reactor Building roof i
framing) necessary for resolution of SEP Topic 111-2, " Wind and Tornado Loadings",
Reference 2. In the course of performing these modifications, missing and loose Reactor 9406290269 940620 PDR ADOCK 03000219
. 1l 0 P
PDR GPU Nuclear Corporation is a subsidiary of General Pubhc Utihties Corpo'ation
)
i C321-94-2095 Page 2 e
i Building roof bolts and sway brace deficiencies were discovered. GPU Nuclear has determined, based upon review of design calculations and engineering judgement, that the acceptable wind speed and associated probabilities for the pre-modification con 6guration were not significantly affected. All deficiencies were corrected during the modi 0 cation process and the Oyster Creek Reactor Building roof can now withstand wind speeds of at least 190 mph.
If you have any questions or comments on this submittal, please contact Mr. Michael Laggart, Manager, Corporate Nuclear Licensing at 0 01) 316-7968.
Very truly yours,
\\
DM John J. Barton
/p Vice President and Director Oyster Creek ce: Administrator, Region 1 Senior Resident Inspector Oyster Creek NRC Project Manager i