05000410/FIN-2018003-0230 September 2018 23:59:59Nine Mile PointMinor Violation
05000220/FIN-2018001-0131 March 2018 23:59:59Nine Mile PointPotential Failure to Submit an 8-Hour Event Notification for a Valid Actuation of HPC
05000331/FIN-2017004-0131 December 2017 23:59:59Duane ArnoldFailure to Maintain Reactor Water Level within Procedurally Required Level Band Results in Reactor Recirculation Pump Runback
05000293/FIN-2017002-0230 June 2017 23:59:59PilgrimReporting of Unplanned Scrams with Complications Performance Indicator for Feedwater Regulating Valve Scram
05000440/FIN-2017002-0230 June 2017 23:59:59PerryImplementation of Enforcement Guidance Memorandum 11003, Revision 3
05000354/FIN-2017001-0331 March 2017 23:59:59Hope CreekOperations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment
05000440/FIN-2016001-0131 March 2016 23:59:59PerryFailure to Properly Implement System Operating Instructions to Maintain Control of Reactor Pressure Vessel Level
05000341/FIN-2015004-0131 December 2015 23:59:59FermiFailure to Satisfy Technical Specification Requirements During an Unplanned Operation with the Potential to Drain the Reactor Vessel
05000458/FIN-2015003-0130 September 2015 23:59:59River BendFailure to Operate the Unit 1 Feedwater System In Accordance With Procedures
05000397/FIN-2015003-0630 September 2015 23:59:59ColumbiaImplementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2
05000354/FIN-2015002-0430 June 2015 23:59:59Hope CreekOperations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment
05000263/FIN-2015002-0730 June 2015 23:59:59MonticelloOperations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable
05000410/FIN-2015001-0231 March 2015 23:59:59Nine Mile PointFailure to Perform an Adequate Review of Planned Work Activities Results in a Manual Reactor Scram
05000352/FIN-2015001-0331 March 2015 23:59:59LimerickOperability of High Pressure Coolant Injection and Entries into Operational Conditions at Low Reactor Pressures with High Reactor Water Level Trip Actuated
05000298/FIN-2014005-0231 December 2014 23:59:59CooperImplementation of Enforcement Guidance Memorandum 11-003, Revision 2, Causes Conditions Prohibited by Technical Specifications
05000388/FIN-2014008-0130 September 2014 23:59:59SusquehannaInadequately Maintained Procedures for Plant Shutdown to Hot Standby led to Reactor Water Level and Power Transients
05000458/FIN-2013005-0331 December 2013 23:59:59River BendOperations Prohibited by Technical Specifications for Operations with a Potential to Drain the Reactor Vessel
05000259/FIN-2013004-0530 September 2013 23:59:59Browns FerryReactor Vessel Water Level 1 Initiation Logic Including the Common Accident Logic Not Evaluated for Appendix R Fire Event
05000387/FIN-2013003-0430 June 2013 23:59:59SusquehannaImplementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1
05000237/FIN-2013002-0231 March 2013 23:59:59DresdenDeficiency In Abnormal Operating Procedures for Site Response to External Flooding Events
05000397/FIN-2012005-0531 December 2012 23:59:59ColumbiaFailure to Follow Shutdown Cooling Isolation Logic Bypass Procedures Results in Loss of Safety Function
05000324/FIN-2012004-0130 September 2012 23:59:59BrunswickFailure to Maintain Secondary Containment Operable During an OPDRV Activity
05000341/FIN-2011009-0330 June 2011 23:59:59FermiInadequate Procedures to Control the Plant from the Dedicated Shutdown Panel
05000263/FIN-2011002-0431 March 2011 23:59:59MonticelloLicensee-Identified Violation
05000271/FIN-2010008-0131 December 2010 23:59:59Vermont YankeeFire Scenario Resulting in Loss of Reactor Core Isolation Cooling System
05000387/FIN-2010004-0430 September 2010 23:59:59SusquehannaFailure to Accurately Model the Simulator for RPV Level Control Using the Integrated Control System
05000416/FIN-2010004-0730 September 2010 23:59:59Grand GulfLicensee-Identified Violation
05000461/FIN-2010002-0531 March 2010 23:59:59ClintonFailure to Correct Inadequate FWLCS Response Resulted in High Reactor Vessel Water Level (Level 8) Scram
05000324/FIN-2010002-0131 March 2010 23:59:59BrunswickFailure to Follow Procedures During Reactor Head Disassembly
05000298/FIN-2009005-1531 December 2009 23:59:59CooperLicensee-Identified Violation
05000324/FIN-2009002-0331 March 2009 23:59:59BrunswickFailure to Follow Procedures During Reactor Head Disassembly (Section 1R20)
05000387/FIN-2008004-0230 September 2008 23:59:59SusquehannaHPCI and RCIC Made Inoperable Due to Operator Actions During Shutdown
05000461/FIN-2008004-0130 September 2008 23:59:59ClintonFailure to Perform Adequate Post-Maintenance Testing Resulted in High Reactor Vessel Water Level (Level 8) Scram
05000458/FIN-2008002-0131 March 2008 23:59:59River BendInternal Operating Experience Not Used to Prevent Recurrence of Reactor Recirculation FCV Runbacks Insert Description (Section 1R19.1)
05000440/FIN-2007005-1131 December 2007 23:59:59PerryAdequacy of Reactor Core Isolation Cooling System Flow Controller Tuning Procedures
05000440/FIN-2007005-1031 December 2007 23:59:59PerryAdequacy of Reactor Core Isolation Cooling System Surveillance Testing
05000263/FIN-2006009-0230 June 2006 23:59:59MonticelloFailure to Perform a 50.59 Evaluation
05000237/FIN-2005014-0131 March 2006 23:59:59DresdenFailure to properly evaluate extended power uprate for its impact on post-scram reactor vessel water level to prevent water intrusion into the HPCI steam supply line