Start date | Site | Title | |
---|---|---|---|
05000410/FIN-2018003-02 | 30 September 2018 23:59:59 | Nine Mile Point | Minor Violation |
05000220/FIN-2018001-01 | 31 March 2018 23:59:59 | Nine Mile Point | Potential Failure to Submit an 8-Hour Event Notification for a Valid Actuation of HPC |
05000331/FIN-2017004-01 | 31 December 2017 23:59:59 | Duane Arnold | Failure to Maintain Reactor Water Level within Procedurally Required Level Band Results in Reactor Recirculation Pump Runback |
05000293/FIN-2017002-02 | 30 June 2017 23:59:59 | Pilgrim | Reporting of Unplanned Scrams with Complications Performance Indicator for Feedwater Regulating Valve Scram |
05000440/FIN-2017002-02 | 30 June 2017 23:59:59 | Perry | Implementation of Enforcement Guidance Memorandum 11003, Revision 3 |
05000354/FIN-2017001-03 | 31 March 2017 23:59:59 | Hope Creek | Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment |
05000440/FIN-2016001-01 | 31 March 2016 23:59:59 | Perry | Failure to Properly Implement System Operating Instructions to Maintain Control of Reactor Pressure Vessel Level |
05000341/FIN-2015004-01 | 31 December 2015 23:59:59 | Fermi | Failure to Satisfy Technical Specification Requirements During an Unplanned Operation with the Potential to Drain the Reactor Vessel |
05000458/FIN-2015003-01 | 30 September 2015 23:59:59 | River Bend | Failure to Operate the Unit 1 Feedwater System In Accordance With Procedures |
05000397/FIN-2015003-06 | 30 September 2015 23:59:59 | Columbia | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2 |
05000354/FIN-2015002-04 | 30 June 2015 23:59:59 | Hope Creek | Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment |
05000263/FIN-2015002-07 | 30 June 2015 23:59:59 | Monticello | Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable |
05000410/FIN-2015001-02 | 31 March 2015 23:59:59 | Nine Mile Point | Failure to Perform an Adequate Review of Planned Work Activities Results in a Manual Reactor Scram |
05000352/FIN-2015001-03 | 31 March 2015 23:59:59 | Limerick | Operability of High Pressure Coolant Injection and Entries into Operational Conditions at Low Reactor Pressures with High Reactor Water Level Trip Actuated |
05000298/FIN-2014005-02 | 31 December 2014 23:59:59 | Cooper | Implementation of Enforcement Guidance Memorandum 11-003, Revision 2, Causes Conditions Prohibited by Technical Specifications |
05000388/FIN-2014008-01 | 30 September 2014 23:59:59 | Susquehanna | Inadequately Maintained Procedures for Plant Shutdown to Hot Standby led to Reactor Water Level and Power Transients |
05000458/FIN-2013005-03 | 31 December 2013 23:59:59 | River Bend | Operations Prohibited by Technical Specifications for Operations with a Potential to Drain the Reactor Vessel |
05000259/FIN-2013004-05 | 30 September 2013 23:59:59 | Browns Ferry | Reactor Vessel Water Level 1 Initiation Logic Including the Common Accident Logic Not Evaluated for Appendix R Fire Event |
05000387/FIN-2013003-04 | 30 June 2013 23:59:59 | Susquehanna | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 |
05000237/FIN-2013002-02 | 31 March 2013 23:59:59 | Dresden | Deficiency In Abnormal Operating Procedures for Site Response to External Flooding Events |
05000397/FIN-2012005-05 | 31 December 2012 23:59:59 | Columbia | Failure to Follow Shutdown Cooling Isolation Logic Bypass Procedures Results in Loss of Safety Function |
05000324/FIN-2012004-01 | 30 September 2012 23:59:59 | Brunswick | Failure to Maintain Secondary Containment Operable During an OPDRV Activity |
05000341/FIN-2011009-03 | 30 June 2011 23:59:59 | Fermi | Inadequate Procedures to Control the Plant from the Dedicated Shutdown Panel |
05000263/FIN-2011002-04 | 31 March 2011 23:59:59 | Monticello | Licensee-Identified Violation |
05000271/FIN-2010008-01 | 31 December 2010 23:59:59 | Vermont Yankee | Fire Scenario Resulting in Loss of Reactor Core Isolation Cooling System |
05000387/FIN-2010004-04 | 30 September 2010 23:59:59 | Susquehanna | Failure to Accurately Model the Simulator for RPV Level Control Using the Integrated Control System |
05000416/FIN-2010004-07 | 30 September 2010 23:59:59 | Grand Gulf | Licensee-Identified Violation |
05000461/FIN-2010002-05 | 31 March 2010 23:59:59 | Clinton | Failure to Correct Inadequate FWLCS Response Resulted in High Reactor Vessel Water Level (Level 8) Scram |
05000324/FIN-2010002-01 | 31 March 2010 23:59:59 | Brunswick | Failure to Follow Procedures During Reactor Head Disassembly |
05000298/FIN-2009005-15 | 31 December 2009 23:59:59 | Cooper | Licensee-Identified Violation |
05000324/FIN-2009002-03 | 31 March 2009 23:59:59 | Brunswick | Failure to Follow Procedures During Reactor Head Disassembly (Section 1R20) |
05000387/FIN-2008004-02 | 30 September 2008 23:59:59 | Susquehanna | HPCI and RCIC Made Inoperable Due to Operator Actions During Shutdown |
05000461/FIN-2008004-01 | 30 September 2008 23:59:59 | Clinton | Failure to Perform Adequate Post-Maintenance Testing Resulted in High Reactor Vessel Water Level (Level 8) Scram |
05000458/FIN-2008002-01 | 31 March 2008 23:59:59 | River Bend | Internal Operating Experience Not Used to Prevent Recurrence of Reactor Recirculation FCV Runbacks Insert Description (Section 1R19.1) |
05000440/FIN-2007005-11 | 31 December 2007 23:59:59 | Perry | Adequacy of Reactor Core Isolation Cooling System Flow Controller Tuning Procedures |
05000440/FIN-2007005-10 | 31 December 2007 23:59:59 | Perry | Adequacy of Reactor Core Isolation Cooling System Surveillance Testing |
05000263/FIN-2006009-02 | 30 June 2006 23:59:59 | Monticello | Failure to Perform a 50.59 Evaluation |
05000237/FIN-2005014-01 | 31 March 2006 23:59:59 | Dresden | Failure to properly evaluate extended power uprate for its impact on post-scram reactor vessel water level to prevent water intrusion into the HPCI steam supply line |