Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000445/2020004 | 9 February 2021 | Integrated Inspection Report 05000445/2020004 and 05000446/2020004 |
IR 05000445/2020003 | 10 November 2020 | Integrated Inspection Report 05000445/2020003 and 05000446/2020003 |
ML19221B727 | 9 August 2019 | Integrated Inspection Report 05000445/2019002 and 05000446/2019002 |
ML19144A343 | 22 May 2019 | Corrections for Comanche Peak Nuclear Power Plant, Units 1 and 2 - NRC Integrated Inspection Report 05000445/2019001 and 05000446/2019001 |
ML19130A154 | 10 May 2019 | NRC Integrated Inspection Report 05000445/2019001 and 05000446/2019001 |
IR 05000445/2017001 | 9 May 2017 | NRC Integrated Inspection Report 05000445/2017001 and 05000446/2017001 |
IR 05000445/2015004 | 4 February 2016 | NRC Integrated Inspection Report 05000445/2015004 and 05000446/2015004 |
ML16180A430 | 1 February 2016 | FSAR Amendment 107, Text - Chapter 15 |
ML15167A541 | 5 June 2015 | 2015-06 Draft Written Exam |
ML15167A546 | 5 June 2015 | 2015-06 Final Written Exam |
ML13071A632 | 21 February 2010 | Monthly Operating Reports Data |
ML081510173 | 27 June 2008 | Issuance of Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt |
CP-200800263, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt | 21 February 2008 | Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt |
ML072490358 | 31 August 2007 | WCAP-16840-NP, Rev. 0, Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report, Page 2.8.1-1 to End |
CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits | 16 August 2007 | Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 |
ML20207D609 | 31 December 1998 | 1998 Annual Operating Rept for Cpses,Units 1 & 2. with |
ML20216J306 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 |
ML20134C082 | 27 January 1997 | Submits Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident |
Information Notice 1996-45, Potential Common-Mode Post-Accident Failure of Containment Coolers | 12 August 1996 | Potential Common-Mode Post-Accident Failure of Containment Coolers |
TXX-9607, Forwards Rept That Discusses Violation of Section 2.C.(1) of Plant Operating License for Unit 2, Maximum Power Level | 25 March 1996 | Forwards Rept That Discusses Violation of Section 2.C.(1) of Plant Operating License for Unit 2, Maximum Power Level |
ML20101D046 | 29 February 1996 | Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 |
ML20148E667 | 31 March 1988 | Design Basis Analysis of Postulated Steam Generator Tube Rupture Event for Comanche Peak Steam Electric Station,Unit 1 |
NRC Generic Letter 1987-16 | 12 November 1987 | NRC Generic Letter 1987-016: Transmittal of NUREG-1262, Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses |