Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML20310A3345 November 2020BrunswickEmergency Preparedness Exercise Inspection Request for Information
ML19301C2436 November 2019BrunswickCorrection of Errors in Attachment Pages Associated with License Amendment Nos. 293 and 321
ML19283D1728 October 2019Region II Operator Licensing Assistant
ML19233A07323 September 2019BrunswickIssuance of Amendment Nos. 293 and 321 to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO
ML19149A47117 September 2019BrunswickIssuance of Amendment Nos. 292 and 320, Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors
ML19242C12130 August 2019BrunswickNotification of NRC Supplemental Inspection (IP 95001) and Request for Information
IR 05000324/201900527 August 2019BrunswickUpdated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2, NRC Report 05000325/2019005 and 05000324/2019005
IR 05000324/20190029 August 2019Brunswick
07200006
Integrated Inspection Report 05000324/2019002 and 05000325/2019002; 07200006/2019001
IR 05000324/20190102 July 2019BrunswickBiennial Problem Identification and Resolution Inspection Report 05000325/2019010 and 05000324/2019010
ML19149A2101 July 2019BrunswickRegulatory Audit Summary, License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants
ML19142A48423 May 2019BrunswickEmergency Preparedness Program Inspection Request for Information
IR 05000325/201900715 May 2019BrunswickAssessment Follow-Up for Brunswick Steam Electric Plant, Unit 1 - NRC Inspection Report 05000325/2019007
ML19018A2066 May 2019BrunswickIssuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time
ML19120A43030 April 2019BrunswickNotification of Brunswick Steam Electric Plant Design Bases Assurance Inspection (Team) - U.S. Nuclear Regulatory Commission Inspection Report 05000325/2019011 and 05000324/2019011
ML19035A00622 April 2019BrunswickIssuance of Amendment Nos. 289 and 317 to Relocate the Pressure-Temperature Limits in the Technical Specifications to the Pressure-Temperature Limits Report
ML19081A07221 March 2019BrunswickNotification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
IR 05000324/20180064 March 2019BrunswickAnnual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Report 05000325/2018006 and 05000324/2018006
IR 05000324/20193014 March 2019BrunswickNRC Operator License Examination Report 05000325/2019301 and 05000324/2019301
IR 05000324/201800411 February 2019BrunswickNRC Integrated Inspection Report 05000325/2018004 and 05000324/2018004
IR 05000324/201820123 January 2019BrunswickNRC Inspection Report 05000325/2018201 and 050003242018201
ML18348B18516 January 2019BrunswickStaff Assessment of Flooding Focused Evaluation (EPID Nos. 000495/05000324/L-2018-JLD-0016 and 000495/05000325/L-2018-JLD-0016
ML18291B3229 January 2019BrunswickIssuance of Amendment Nos. 288 and 316 to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3
ML18264A2607 January 2019BrunswickIssuance of Amendment Nos. 287 and 315 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements
ML18298A0783 December 2018Brunswick2nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control
IR 05000324/20180032 November 2018BrunswickNRC Integrated Inspection Report 05000325/2018003 and 05000324/2018003; 05000325/2018502 and 05000324/2018502
ML18276A03011 October 2018BrunswickReassignment of U.S. Nuclear Regulatory Commission Branch Chief
IR 05000324/20184112 October 2018BrunswickCyber Security Inspection Report 05000325/20185411 and 05000324/2018411 - OUO Removed
ML18243A29827 September 2018BrunswickIssuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5
ML18249A40726 September 2018Perry
Wolf Creek
Watts Bar
Brunswick
Callaway
Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001)
ML18172A25818 September 2018BrunswickNon-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+)
IR 05000324/201800523 August 2018BrunswickUpdated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2, NRC Report 05000325/2018005 and 05000324/2018005
ML18197A4309 August 2018BrunswickRelief Request ISI-10 to Regarding Alternate Repair of Feedwater Nozzle Dissimilar Metal Welds
IR 05000324/201800223 July 2018BrunswickNuclear Regulatory Commission Integrated Inspection Report 05000325/2018002 and 05000324/2018002 and Exercise of Enforcement Discretion
ML18199A20917 July 2018BrunswickRequalification Program Inspection - Brunswick Steam Electric Plant
ML18106B1696 July 2018BrunswickIssuance of Amendment Nos. 284 and 312 Regarding Request to Allow Performance-Based Fire Protection Alternative for Thermal Insulation Material
IR 05000324/201801122 June 2018BrunswickNRC Design Bases Assurance Inspection (Programs) Report No. 05000325/2018011 and 05000324/2018011
ML18158A4837 June 2018BrunswickEmergency Preparedness Inspection and Request for Information
ML18137A14323 May 2018BrunswickCorrection to Issuance of Amendment Nos. 283 and 311 to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242)
ML18130A82615 May 2018BrunswickSupplemental Information Needed for Acceptance. Amendment Request to Revise the Technical Specifications to Relocate the Pressure Temperature Limit Curves to a Pressure and Temperature Limits Report
ML18130A65314 May 2018BrunswickProject Manager Assignment
ML18117A1914 May 2018BrunswickProposed Alternative to Defer Inspection of Reactor Vessel Instrumentation Nozzle 2B11-RPV-N11B Until the First Period in the 5th 10-Year ISI Interval
IR 05000324/20180012 May 2018BrunswickNRC Integrated Inspection Report 05000325/2018001 and 05000324/2018001
ML18128A38026 April 2018VogtleNotification of Licensed Operator Initial Examination 05000325/2018 and 05000324/2018301
ML18089A05516 April 2018BrunswickStaff Assessment of Response to 10 CFR 50.54(f) Information Request Flood-Causing Mechanism Reevaluation (Public)
ML18039A44413 April 2018BrunswickIssuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2
ML18010A8475 April 2018BrunswickRequest for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant, Units 1 and 2, Regarding Core Flow Operating Range Expansion (CAC No. MF8363 and MF8364; EPID L-2016-LLA-0009)
ML18068A62722 March 2018BrunswickReport for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109
IR 05000324/201801012 March 2018BrunswickNRC Team Inspection Report 05000325/2018010 and 05000324/2018010
ML18068A1519 March 2018BrunswickReassignment of U.S. Nuclear Regulatory Commission Acting Branch Chief
IR 05000324/201700628 February 2018BrunswickAnnual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2017006 and 05000324/2017006, 05000325/2017402 and 05000324/2017402, 05000325/2017501 and 05000324/2017501