ML20137H37226 November 1985Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
Memorandum & Order Granting Extension of 851130 Deadline for Environ Qualification of Electrical Equipment to 860531 & Approving Proposal to Allow Operation w/35% Reactor Power Limit During Interim.Served on 851127Other
ML20211E08420 February 1986Robert Elliott
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Gulde R
Issue a to Fort St Vrain:Delayed Firewater Cooldown;Effect of Liner Cooling on Orifice Valve TempsOther
ML20209F18718 March 1986GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Bagierek A
Cadwallader G
Silady F
Fort St Vrain Steam Generator Temps During Interruption of Forced Cooling from 105% PowerOther
ML20205Q4887 May 1986Dean R
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Forwards Info Re Chernobyl Incident & Lack of Similarities Between Chernobyl & High Temp Gas Reactor Concepts Being Developed in Us.Discussion RequestedOther
ML20197B8939 May 1986Xcel Energy
Brey H
Forwards Chernobyl Nuclear Reactor Accident & Implications Upon Fort St Vrain, Per NRC Request to Assess Possibility of Graphite Fire.Accident Involving Graphite Oxidation Not CredibleOther
ML20197B9219 May 1986Xcel EnergyChernobyl Nuclear Reactor Accident & Implications Upon Fort St VrainOther
ML20205Q4839 May 1986Office of Nuclear Reactor Regulation
Harold Denton
Discusses Continued Operation of Facility in View of Accident at Chernobyl.Encl Analysis of Beyond Design Basis Scenario Concludes That Graphite Oxidation Could Be Terminated within 24 HOther
ML20205Q47714 May 1986NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Stello V
Forwards Memo & Supporting Info Re Reexam of Basis for Licensing Facility in View of Accident at Chernobyl. Continued Operation Justified Until Scheduled Shutdown on 860531.Issue Will Be Reexamined Prior to RestartOther
ML20207J7662 July 1986Hogan R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Yandell L
Baird J
Hackney C
Emergency Preparedness Insp Rept 50-267/86-15 on 860519-22. Violation Noted:Inadequate Emergency Response Training Program Evidenced by Lack of RecordsRequest
ML20237G42518 July 1986Office of Nuclear Reactor Regulation
Harold Denton
Responds to to Lw Zech Re Safety of Plant in Light of Recent Accident at Chernobyl Facility in Soviet Union.Evaluation Indicated That Radiation Doses Would Be So Low as Not to Require Evacuation of Local ResidentsOther
ML20210C96816 September 1986Office of Nuclear Reactor Regulation
Heitner K
Forwards Translation of Soviet Rept on Chernobyl Accident. Rept Should Be Reviewed & Matl Used to Update Previous Rept, Chernobyl Nuclear Reactor Accident & Implications. Requests Revised Rept by 861010.W/o EnclOther
ML20214S95825 September 1986Office of Nuclear Reactor Regulation
Heitner K
Requests That Util Take Listed Actions Re Three Repts Submitted Concerning Firewater Cooldown Analysis,Per NRC Review & 860917 Telcon.Response to Item 1 Requested within 15 Days of Ltr Date & Item 2 at Time Analysis SubmittedOther
ML20211E05830 September 1986GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Betts W
Effect of Delayed Firewater Cooldown W/Loss of Liner Cooling on Pcrv TempsOther
ML20215F2066 October 1986Xcel Energy
Brey H
Requests Extension of Time Frame to Review Soviet Rept on Chernobyl Accident & Assess Impact on Facility Safety.Util Will Define Areas to Be Further Investigated & Complete Schedule by 861022Other
ML20215G79610 October 1986Xcel Energy
Warembourg D
Advises That Info Requested in NRC Re Best Estimate Schedule for Resolution of Problems Encountered W/Firewater Cooldown Analysis Will Be Submitted as Part of Util Graduated rise-to-power ProgramOther
ML20211D33016 October 1986Miraglia F
Office of Nuclear Reactor Regulation
Comments on Program Plan for Utilizing Facility Experiences & Technical Support Activities to Best Advantage in Advanced HTGR Safety Studies.Focus of Program Plan Should Be Limited to Few Critical AreasOther
ML20197B07622 October 1986Xcel Energy
Brey H
Informs That Util Will Update & Submit Rept on Chernobyl Accident by 861126.Update Will Ctr on Graphite Related Concerns,Including Analysis of Worst Case Explosive Gas Mixtures & Comparison of Reactor Kinetics BehaviorOther
ML20211G58322 October 1986Xcel Energy
Robert Williams
Anticipates Completion of Steam Generator Analysis & App R Modeling Reanalysis Work by Feb 1987,per 860918 Telcon W/Nrc Re Steam Generator Cool Down Studies for App ROther
ML20215L53423 October 1986Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
Staff Requirements Memo Re Commission Briefing in Washington,Dc on Status of FacilityOther
ML20207K51213 November 1986Mcdonald C
Nichols M
Connors G
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Fort St Vrain Calculations for Circulator Temp-Related Operating LimitsOther
ML20214X36826 November 1986Xcel Energy
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Revised Chernobyl Nuclear Reactor Accident & Implications Upon Fort St VrainOther
ML20214X3584 December 1986Xcel Energy
Brey H
Forwards Revised Analysis of Chernobyl Nuclear Reactor Accident & Implications Upon Fort St Vrain. Chernobyl-type Accident Cannot Occur at Plant Due to Fundamental Design DifferencesOther
ML20207K5014 December 1986Antoinette Lewis
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Almajan A
Ryder R
Effect of Firewater Cooldown Using Economizer-Evaporator- Superheater (EES) Bundle on Steam Generator Structural Integrity. Draft Rept of Steam Generator Ability to Withstand post-App R Firewater Cooldown Transient EnclDraft Other
ML20211N36812 December 1986Xcel Energy
Brey H
Forwards Restart Interaction Schedule,Per 861205 RequestOther
ML20207K44612 December 1986Antoinette Lewis
Connors G
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Ryder R
Issue a to Effect of Firewater Cooldown Using Reheater on Steam Generator Structural IntegrityOther
ML20207K50622 December 1986Richards M
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Issue a to Effect of Intentional Depressurization on Cooldown from 39% Power Using One Reheater Module (1-1/2 H Delay)Other
ML20207K44123 December 1986GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Potter R
Issue a to Economizer-Evaporator-Superheater (EES) Cooldown from 39% & 78% Power Using Condensate or Firewater (1.5 H Delay)Other
ML20207K38630 December 1986Xcel Energy
Warembourg D
Forwards Analyses Supporting Power Operation Up to 39% Power Based on Safe Shutdown Cooling Following 90 Min Interruption of Forced Circulation.Conclusions of Repts Listed.Corrective Actions for LERs 86-020 & 86-026 Also ListedOther
ML20207P7797 January 1987Xcel Energy
Gahm J
Forwards Current Integrated Schedule for Restart & Power Ascension Activities.Schedule Incorporates Consolidated Schedular Info on Both Interaction Activities.Updates Will Be Provided Twice Per Month.W/One Oversize GraphOther
ML20207P99313 January 1987Xcel Energy
Holmes M
Johns J
Moffette J
SAR for Tech Spec Limiting Condition for Operation 4.3.1 Change Permitting Safe Shutdown Cooling W/Evaporator- Economizer-SuperheaterOther
ML20207P98715 January 1987Xcel Energy
Robert Williams
Forwards Application for Amend to License DPR-34,changing Tech Specs to Require Both evaporator-economizer Superheater Sections & Both Reheater Sections to Be Available During Operation at Power.Fee PaidRequest
ML20207P99115 January 1987Xcel EnergyProposed Tech Specs,Requiring Both evaporator-economizer Superheater Sections & Both Reheater Sections to Be Available During Operation at Power as Min Number of HXsOther
ML20207P98915 January 1987Xcel Energy
Robert Williams
Application for Amend to License DPR-34,requiring Both evaporator-economizer Superheater Sections & Both Reheater Sections to Be Available During Operation at Power as Min Number of Operable HXsRequest
ML20211E11026 January 1987Xcel Energy
Geaney G
Atkisson R
Fekete M
Rev a to Engineering Evaluation of Procedure to Recover from Actuation of Steam Line Rupture Detection/Isolation Sys for Power Levels Through P2Other
ML20209B69129 January 1987Office of Nuclear Reactor Regulation
Heitner K
Forwards Official Repts Made Public by DOE Re Review of N-reactor for Info & Review.Util Should Review Repts for Matl Potentially Relevant to Facility.W/O EnclApproval
ML20210A74830 January 1987Xcel Energy
Robert Williams
Requests Concurrence to Start Up & Operate Facility Through Graduated Rise to Power Up to 100% of Rated Power,Subj to Listed Constraints. Fort St Vrain 1987 Power Ascension Plan EnclOther
IR 05000267/198700230 January 1987NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Yandell L
Earnest A
Huff D
Partially Withheld Insp Rept 50-267/87-02 on 870106-09 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Matl Control & AccountingRequest
ML20210A75730 January 1987Xcel EnergyFort St Vrain 1987 Power Ascension PlanOther
ML20209G0432 February 1987Xcel Energy
Gahm J
Forwards Current Integrated Schedule for Plant Restart & Power Ascension Activities.W/One Oversize EnclOther
ML20210A7402 February 1987Xcel Energy
Brey H
Forwards Updated Nrc/Public Svc Co of Colorado Restart Interaction Schedule, Reflecting Current Target Dates & Recently Completed ItemsOther
ML20210N8833 February 1987Office of Nuclear Reactor Regulation
Heitner K
Forwards Request for Addl Info on 861230 & 870115 Submittals Re Analysis of Firewater Cooldown from 82% of Full PowerRAI
ML20211D9925 February 1987GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES
INC./GENER
Potter R
Gulde R
Issue a to Economizer-Evaporator-Superheater Cooldowns for Equipment Qualification & App R Events W/Vent Lines (1.5 H Delay)Other
ML20210P0195 February 1987Office of Nuclear Reactor Regulation
Heitner K
Summary of 870113 Meeting W/Util Re Completion of Equipment Qualification Program & Program & Approvals Required for Plant RestartMeeting
ML20210T6865 February 1987PROTO-POWER MANAGEMENT CORP.
Collette P
Geaney G
Rev a to Engineering Evaluation of Reanalysis of FSAR Accidents/Transients Relying on EES Cooling. W/Four Oversize DrawingsOther
ML20210T6556 February 1987Xcel Energy
Brey H
Provides Results of Confirmatory Analyses for FSAR Accidents Which Utilize Either EES or Reheater Section of Steam Generator for DHROther
ML20210T43611 February 1987Berkow H
Office of Nuclear Reactor Regulation
Requests Publication of Fr Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination & Opportunity for Hearing on 870115 Request Re Operation of evaporator-economizer-superheater SectionsOther
ML20211E97912 February 1987Xcel Energy
Brey H
Forwards Proposed Agenda & Slides for 870226 Meeting W/ Commission & Staff to Secure Commission Approval for Full Power Operation of FacilityMeeting
ML20211D89017 February 1987Xcel Energy
Brey H
Forwards Response to NRC 870203 Request for Addl Info Re Firewater Cooldown from 82% of Full Power,Per Util 861230 & sRequest
ML20207Q7943 March 1987Office of Nuclear Reactor Regulation
Heitner K
Forwards Second Request for Addl Info Re Util Analysis of Firewater Cooldown from 82% of Full Power Operation,Based on Review of 861230,870115 & 0217 SubmittalsApproval
ML20212M1025 March 1987Xcel Energy
Robert Williams
Forwards Assessment of Addl Concerns Per 870226 Request Re Restart of Facility.Events & Circumstances Involving Contracts Had No Adverse Impacts Re Plant Safety or Safe Plant OperationsOther