Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
AECM-84-0090, Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790) | 7 March 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790) | Request |
ML20084D490 | 30 April 1984 | INC. Boyer R TRANSAMERICA DELAVAL | Part 21 Rept Re Westinghouse Relay Type SA-1 Reported in IE Info Notice 83-63.Initially Reported on 840307.RTE Delta Switchgear Div Requests to Be Advised If Util Upgrades Equipment,To Enable Records Mod | Other |
AECM-84-0378, Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area | 26 July 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area | Request |
AECM-84-0393, Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389) | 3 August 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389) | Request |
AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1 | 5 October 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1 | Other |
AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program | 7 November 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program | Other |
AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL | 21 November 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL | Other |
AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function | 28 November 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function | Other |
ML20100N189 | 28 February 1985 | TDI (TRANSAMERICA DELAVAL INC.) OWNERS GROUP | Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept | Other |
AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced | 29 March 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced | Other |
AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date | 16 April 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date | Other |
ML20203N417 | 30 April 1986 | Duke Energy Segrest A TDI (TRANSAMERICA DELAVAL INC.) OWNERS GROUP | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Other |
ML20199L597 | 26 June 1986 | Office of Nuclear Reactor Regulation Kintner L | Forwards Generic SER of Operability/Reliability of Emergency Diesel Generators Mfg by Tdi.Plans for Program Implementation Requested by 860715 | Other |
ML20199L624 | 26 June 1986 | NRC | SER Re Operability/Reliability of Tdi Emergency Diesel generator.Three-phase Plan for Assuring Generator Reliability Discussed.Sample License Conditions Encl | Other |
AECM-86-0172, Explains Actions in Response to Final Evaluations from Tdi Owners Group Program & Plans for Implementation of Programs Identified in NRC SER of Operability/Reliability of Tdi Emergency Diesel Generators.Fee Paid | 18 July 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Explains Actions in Response to Final Evaluations from Tdi Owners Group Program & Plans for Implementation of Programs Identified in NRC SER of Operability/Reliability of Tdi Emergency Diesel Generators.Fee Paid | Other |
ML20210E247 | 12 September 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Specs,Adding Addl Controls Re Maint & Surveillance & Mods of Tdi Owners Group Recommendations | Other |
AECM-86-0282, Application for Amend to License NPF-29,adding Addl Controls Re Maint & Surveillance & Mods of Tdi Owners Group Recommendations to Enhance Emergency Diesel Program.Fee Paid | 12 September 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Application for Amend to License NPF-29,adding Addl Controls Re Maint & Surveillance & Mods of Tdi Owners Group Recommendations to Enhance Emergency Diesel Program.Fee Paid | Request |
ML20213G093 | 7 November 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Requests Deletion of Parenthetical Expressions Added to 860912 Proposed Change to License Condition 2.C.(25)(b),per 860929 Telcon.Change Proposed to Be Consistent W/Ser Re Tdi Emergency Diesel Generators.Expressions No Longer Necessary | Request |
AECM-86-0394, Forwards Application for Amend to License NPF-29,revising Tech Specs for Diesel Generator Testing,Allowed out-of-svc Time & Surveillance Requirements for Offsite & Onsite Ac Electrical Sources.Fee Paid | 9 December 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Forwards Application for Amend to License NPF-29,revising Tech Specs for Diesel Generator Testing,Allowed out-of-svc Time & Surveillance Requirements for Offsite & Onsite Ac Electrical Sources.Fee Paid | Request |