Letter Sequence Other |
|---|
|
Results
Other: AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1, AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program, AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL, AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function, AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced, AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date, ML20084D490, ML20100N189, ML20199L597, ML20199L624
|
MONTHYEARAECM-84-0090, Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790)1984-03-0707 March 1984 Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790) Project stage: Request ML20084D4901984-04-30030 April 1984 Part 21 Rept Re Westinghouse Relay Type SA-1 Reported in IE Info Notice 83-63.Initially Reported on 840307.RTE Delta Switchgear Div Requests to Be Advised If Util Upgrades Equipment,To Enable Records Mod Project stage: Other AECM-84-0378, Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area1984-07-26026 July 1984 Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area Project stage: Request AECM-84-0393, Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389)1984-08-0303 August 1984 Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389) Project stage: Request AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 11984-10-0505 October 1984 Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1 Project stage: Other AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program1984-11-0707 November 1984 Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program Project stage: Other AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL1984-11-21021 November 1984 Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL Project stage: Other AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function1984-11-28028 November 1984 Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function Project stage: Other ML20100N1891985-02-28028 February 1985 Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept Project stage: Other AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced1985-03-29029 March 1985 Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced Project stage: Other AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date1985-04-16016 April 1985 Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date Project stage: Other ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications Project stage: Other ML20199L5971986-06-26026 June 1986 Forwards Generic SER of Operability/Reliability of Emergency Diesel Generators Mfg by Tdi.Plans for Program Implementation Requested by 860715 Project stage: Other ML20199L6241986-06-26026 June 1986 SER Re Operability/Reliability of Tdi Emergency Diesel generator.Three-phase Plan for Assuring Generator Reliability Discussed.Sample License Conditions Encl Project stage: Other AECM-86-0172, Explains Actions in Response to Final Evaluations from Tdi Owners Group Program & Plans for Implementation of Programs Identified in NRC SER of Operability/Reliability of Tdi Emergency Diesel Generators.Fee Paid1986-07-18018 July 1986 Explains Actions in Response to Final Evaluations from Tdi Owners Group Program & Plans for Implementation of Programs Identified in NRC SER of Operability/Reliability of Tdi Emergency Diesel Generators.Fee Paid Project stage: Other ML20213G0931986-11-0707 November 1986 Requests Deletion of Parenthetical Expressions Added to 860912 Proposed Change to License Condition 2.C.(25)(b),per 860929 Telcon.Change Proposed to Be Consistent W/Ser Re Tdi Emergency Diesel Generators.Expressions No Longer Necessary Project stage: Request ML20211M4231986-12-0909 December 1986 Amend 26 to License NPF-29,changing License Condition 2.C.(25)(b) by Adding Maint & Surveillance Requirements for Tdi Emergency Diesel Generators Project stage: Other ML20211M4331986-12-0909 December 1986 Safety Evaluation Supporting Amend 26 to License NPF-29 Project stage: Approval AECM-86-0394, Forwards Application for Amend to License NPF-29,revising Tech Specs for Diesel Generator Testing,Allowed out-of-svc Time & Surveillance Requirements for Offsite & Onsite Ac Electrical Sources.Fee Paid1986-12-0909 December 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs for Diesel Generator Testing,Allowed out-of-svc Time & Surveillance Requirements for Offsite & Onsite Ac Electrical Sources.Fee Paid Project stage: Request 1984-08-03
[Table View] |
Text
f
$ 1,6 kw
,a
- Docket No. 50-416 Distribution
. Docket File '
Mr. Oliver D. Kingsley, Jr.
NRC PDR BGrimes Vice President, Nuclear Operations Local PDR JPartlow Mississippi Power & Light Company PD#4 Reading P0'Brien P. O. Box 23054 RBernero LKintner Jackson, Mississippi 39205 Young, OELD ACRS (10)
EJordan LGHulman
Dear Mr. Kingsley:
CBerlinger
SUBJECT:
OPERABILITY / RELIABILITY OF EMERGENCY DIESEL GENERATORS MANUFACTURED BY TRANSAMERICA DELAVAL, INC.
Enclosed is the NRC staff's generic safety evaluation report (SER) of the Transamerica Delaval, Inc. (TDI) Owners' Group program to validate and upgrade, as necessary, the design and manufacturing quality of the TDI diesel generators for nuclear standby service.
The staff has concluded that implementation of the maintenance / surveillance programs identified in the SER will provide an acceptable technical resolutian of the concerns regarding reliability of TDI diesel generators for service at nuclear plants, following the crankshaft failure at the Shoreham nuclear plant.
Please provide your plans for implementation of the programs identified in the enclosed SER for Grand Gulf, Unit 1.
In order to meet the schedule for this licensing action, you are requested to provide this information by July 15, 1986.
If you cannot meet this date, please advise me within seven days of receipt of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Lester L. Kintner, Project Manager BWR Project Directorate #4 Division of BWR Licensing
Enclosure:
As stated cc:
See next page g....:.PD#4 DBL OFC :PD# D L NAME :LKintner
- WButler DATE :6/2.W86
- 6/2f/86 0FFICIAL RECORD COPY 8607090407 860626 DR ADOCK 05000416 PDR
..b I
f(
. UNITED STATES y
7, NUCLEAR REGULATORY COMMISSION 5
rj IVASHING TON, 0. C. 20555
.p O 36 M6 j
Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.
Vice President, Nuclear Operations Mississippi Power & Light Company P. O. Box 23054 Jackson, Mississippi 39205
Dear Mr. Kingsley:
SUBJECT:
OPERABILITY / RELIABILITY OF EMERGENCY DIESEL GENERATORS MANUFACTURED BY TRANSAMERICA DELAVAL, INC.
t Enclosed is the NRC staff's generic safety evaluation report (SER) of the Transamerica Delaval, Inc. (TDI) Owners' Group program to validate and upgrade, as necessary, the design and manufacturing quality of the TDI diesel generators for nuclear standby service.
The staff has concluded that implementation of the maintenance / surveillance programs identified in the SER will provide an acceptable technical resolution of the concerns regarding reliability of TDI diesel generators for service at nuclear plants, following the crankshaft failure at the Shoreham nuclear plant.
Please provide your plans for implementation of the programs identified in the enclosed SER for Grand Gulf, Unit 1.
In order to meet the schedule for this licensing action, you are requested to provide this information by July 15, 1986.
If you cannot meet this date, please advise me within seven days of receipt of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Lester L. Kintner, Project Manager BWR Project Directorate #4 Division of BWR Licensing
Enclosure:
As stated cc:
See next page l
Mr. Oliver D. Kingsley, Jr.
Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W.
Jackson, Mississippi 39201 Washington, D. C.
20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.
P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiama 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.
Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support i
U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company i
101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mi.ssissippi 39205 Mr. J. E. Cross Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.0- Box 756 i
Port Gibson, Mississippi 39150 l
Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150 22 l
l l
f