Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML05186033430 December 2002Information Concerning a Forthcoming Shipment of Irradiated Nuclear Reactor Fuel by CP&L
TAC:MB585418 December 2002
BSEP-02-0198, Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations18 December 2002Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric ExaminationsNon-Destructive Examination
EVT-1
Unidentified leakage
TAC:MB637213 December 2002
ML02353050013 December 2002License Amendment No.251, Delete Requirement to Include Check Valve MVD-V5008 in Facility Check Valve ProgramSafe Shutdown Earthquake
Seismically rugged
BSEP 02-0191, Cycle 14 Startup Report12 December 2002Cycle 14 Startup ReportShutdown Margin
BSEP 02-0200, Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2)12 December 2002Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2)
BSEP 02-0192, November 2002 Monthly Operating Report for Brunswick Units 1 & 210 December 2002November 2002 Monthly Operating Report for Brunswick Units 1 & 2Power Uprate
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
BSEP 02-0169, GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus.30 November 2002GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus.Safe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Abnormal operational transient
Flow Accelerated Corrosion
Feedwater Controller Failure
Large early release frequency
MELLLA
Stress corrosion cracking
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Power Uprate
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
BSEP 02-0186, Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits22 November 2002Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits
ML02336006922 November 2002Reportable Condition Stability Option III: Period Based Algorithm T Specification
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02331027021 November 2002License Amendment 250 Regarding Containment Leakage Rate Testing ProgramProbabilistic Risk Assessment
Large early release frequency
Stress corrosion cracking
ML02330039421 November 2002Technical Specification Pages for Amendment 250High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
BSEP 02-0189, Correction to Application for Technical Specification Change20 November 2002Correction to Application for Technical Specification ChangeOffsite Dose Calculation Manual
BSEP 02-0188, Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change18 November 2002Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change
ML02329016218 November 2002Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not ReportableMELLLA
ML02319005614 November 2002Meeting with CP&L Green, non-cited Violation for Inadequate Fire Suppression in the Cable Spreading Room at Brunswick, Units 1 & 2
BSEP 02-0181, October 2002 Monthly Operating Report for Brunswick Units 1 & 214 November 2002October 2002 Monthly Operating Report for Brunswick Units 1 & 2Power Uprate
ML02326001213 November 2002Petitions for Review of Orders of the NRC
BSEP 02-0159, Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements13 November 2002Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System RequirementsPost Accident Monitoring
Incorporated by reference
BSEP 02-0182, Revisions to Plant Emergency Procedures7 November 2002Revisions to Plant Emergency Procedures
BSEP 02-0174, Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit7 November 2002Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety LimitReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
Affidavit
IR 05000324/200200328 October 2002IR 05000325-02-003 & IR 05000324-02-003, on 06/30/2002 to 09/28/2002, Brunswick, Units 1 & 2. Fire ProtectionSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Met Tower
Temporary Modification
Significance Determination Process
Annual Radiological Environmental Operating Report
Process Control Program
Excess Flow Check Valve
Safeguards Contingency Plan
Earthquake
Maintenance Rule Program
Fire Protection Program
BSEP 02-0177, Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2)25 October 2002Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2)Missed surveillance
BSEP 02-0175, Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw25 October 2002Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall FlawNon-Destructive Examination
Through-Wall Leak
Through Wall Leak
BSEP 02-0167, September 2002 Monthly Operating Report for Brunswick Units 1 & 211 October 2002September 2002 Monthly Operating Report for Brunswick Units 1 & 2Power Uprate
BSEP 02-0163, Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing8 October 2002Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate TestingNon-Destructive Examination
Probabilistic Risk Assessment
Coatings
Large early release frequency
Safeguards Contingency Plan
Moisture barrier
Fire Protection Program
TAC:MB56314 October 2002
ML0228302781 October 2002Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets
ML0228200321 October 2002Stability Option III: Possible Successive Confirmation Count Resets
ML0228000921 October 2002Closed Meeting Summary - Security Issues at Brunswick, Crystal River, Shearon Harris & H.B. Robinson Plants