Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22356A29822 December 2022Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report
CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements22 December 2022Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting RequirementsNondestructive Examination
CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions22 December 2022Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML22354A19022 December 2022Response to Letter Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report
ML22353A08115 December 2022NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds
ML22348A09714 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088)
ML22348A04413 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100)Pressure Boundary Leakage
WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision12 December 2022Submittal of Emergency Plan Implementing Procedure Revision
ML22343A0698 December 2022NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103)Anticipated operational occurrence
ML22271A9147 December 2022Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level SchemeOperating Basis Earthquake
Earthquake
ML22329A1385 December 2022Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2
IR 05000390/20224201 December 2022Security Baseline Inspection 05000390/2022420 and 05000391/2022420 Cover LetterAffidavit
CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-0128 November 2022American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01Dissimilar Metal Weld
CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat28 November 2022Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio
ML22327A19028 November 2022Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000390 2023403; 05000391 2023403Cyber Security
ML22334A14222 November 202211-14-2022 Watts Bar Integrated Inspection Report
ML22346A05821 November 2022News Release-II-22-028: NRC Names New Resident Inspector at Watts Bar Nuclear Power PlantNew Resident Inspector
ML22318A00714 November 2022Integrated Inspection Report 05000390/2022003 and 05000391/2022003Boric Acid
Non-Destructive Examination
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Foreign Material Exclusion
Fire Protection Program
Downpower
ML22293A40814 November 2022Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule
ML22318A10414 November 2022Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide PresentationDissimilar Metal Weld
ML22314A03110 November 20222BProbabilistic Risk Assessment
Job Performance Measure
ML22257A0514 November 2022Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-AShutdown Margin
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 23 November 2022Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2
WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies1 November 2022Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies
CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update31 October 2022Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
IR 05000390/202201028 October 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000390/2022010 and 05000391/2022010Safe Shutdown
Tornado Missile
Large early release frequency
Earthquake
Very Low Safety Significance Issue Resolution
ML22276A16124 October 2022Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Cyber Security
Fire Protection Program
WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions17 October 2022Unit 2 - Emergency Plan Implementing Procedure Revisions
CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 5517 October 2022Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55
WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)17 October 2022Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)
ML22272A56812 October 2022Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance CodeIncorporated by reference
CNL-22-004, Completion of Actions Required by NRC Confirmatory Order EA-17-0225 October 2022Completion of Actions Required by NRC Confirmatory Order EA-17-022
IR 05000390/202230130 September 2022NRC Operator License Examination Report 05000390/2022301 and 050000391/2022301
WBL-22-057, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation26 September 2022American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 OperationMoisture barrier
ML22187A01920 September 2022Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps
PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request20 September 2022Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request
ML22187A18120 September 2022Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water TrainUltimate heat sink
Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML22256A29514 September 2022Operation of an Independent Spent Fuel Storage Installation Report 07201048/2022001
WBL-22-046, Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)8 September 2022Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)
ML22250A4857 September 2022Requalification Program InspectionJob Performance Measure
CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2 September 2022Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte
IR 05000390/202200531 August 2022Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - FinalFitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
ML22227A07115 August 2022NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected
ML22227A02612 August 2022NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12
IR 05000390/202200212 August 2022Integrated Inspection Report 05000390/2022002 and 05000391/2022002 and Exercise of Enforcement DiscretionHigh Radiation Area
Non-Destructive Examination
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Fire Protection Program
ML22227A02711 August 2022NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2
CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions11 August 2022Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML22173A1605 August 2022Ltr to the Honorable Thomas R. Carper Congressional Report for Missed Neima Milestone for Sequoyah Hydrologic Analysis License Amendment Request
ML22215A2753 August 2022NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554Pressure Boundary Leakage
ML22217A0843 August 2022NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301