ML13008A32028 December 2012Transmittal of Report of Impingement of Atlantic Sturgeon
SCH12-041, Transmittal of Discharge Monitoring Report for the Month of November 201227 December 2012Transmittal of Discharge Monitoring Report for the Month of November 2012NJPDES
SCH12-040, New Jersey Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ000562220 December 2012New Jersey Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ0005622NJPDES
LR-N12-0406, PSEG Nuclear LLC - Decommissioning Funding Plan for the Independent Spent Fuel Storage Installations17 December 2012PSEG Nuclear LLC - Decommissioning Funding Plan for the Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Fuel cladding
RS-12-226, Proposed Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plans for Braidwood Byron, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Salem17 December 2012Proposed Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Funding Plans for Braidwood Byron, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and SalemDecommissioning Funding Plan
ML13023A38414 December 2012Comment (269) of Deborah W. Harris on Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor OperationEarthquake
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12335A22110 December 2012and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security PlanCyber Security
Fire Protection Program
ML12363A04710 December 2012Part 21 Report Re Failure to Comply with Certain PSEG Specifications as Required by PSEG Purchase Order
ML12334A3105 December 2012Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items
ML12355A3735 December 2012Transmittal of Report of Impingement of Atlantic Sturgeon
ML13109A5414 December 2012Salem - Miscellaneous Exam Material (Folder 1)
LR-N12-0379, Foreign Ownership, Control, or Influence Information for PSEG Nuclear LLC30 November 2012Foreign Ownership, Control, or Influence Information for PSEG Nuclear LLC
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G30 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 530 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
TAC:MF033730 November 2012
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
ML13052A67730 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
ML13052A67830 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
ML13052A67930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0367, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action30 November 2012Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action
ML12338A22530 November 2012NRR E-mail Capture - Logbook Entry: 11/30/2012
LR-N12-0289, License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor Indications30 November 2012License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor IndicationsGrab sample
Fuel cladding
ML12339A00629 November 2012Submittal of Core Operating Limits Report - Cycle 20
LR-N12-0380, Response to Question No. 4 and Follow-on Questions to NRC Request for Information Received on Security Plan Revision 1529 November 2012Response to Question No. 4 and Follow-on Questions to NRC Request for Information Received on Security Plan Revision 15
ML12314A38729 November 2012and Salem Nuclear Generating Station, Units 1 and 2 - Delayed Submittal of Initial Status Reports for Fukushima Orders Modifying Licenses Regarding Recommendations 4.2, 5.1, and 7.1 of the Near-Term Force Related to the ..Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
RS-12-207, Providing Notice of Change in Trustee for Nuclear Decommissioning Trust Funds29 November 2012Providing Notice of Change in Trustee for Nuclear Decommissioning Trust Funds
LR-N12-0366, Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary28 November 2012Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-7528 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75
LR-N12-0366, Salem and Hope Creek Emergency Plan Evacuation Time Estimate28 November 2012Salem and Hope Creek Emergency Plan Evacuation Time Estimate
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-14928 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
ML13052A67628 November 2012Salem and Hope Creek Emergency Plan Evacuation Time Estimate
ML13052A67528 November 2012Attachment to LR-N12-0366 - Study Kld TR-499, Rev 0 - 10CFR 50.54 (8) Summary
ML13052A68028 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J
ML13052A68128 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75
ML13052A68228 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
TAC:MF027626 November 2012
LR-N12-0370, Response to Recommendation 2.3: Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident26 November 2012Response to Recommendation 2.3: Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi AccidentFukushima Dai-Ichi
LR-N12-0372, Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident26 November 2012Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi AccidentFukushima Dai-Ichi
ML12334A39522 November 2012Comment (99) of Steve Shuput on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor OperationEarthquake
ML12334A39321 November 2012Comment (97) of Donna Selquist on Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation
ML12334A38821 November 2012Comment (92) of Geri Collecchia on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor OperationEarthquake
Chernobyl
SCH12-037, Submittal of Discharge Monitoring Report Report for the Month of October 201221 November 2012Submittal of Discharge Monitoring Report Report for the Month of October 2012NJPDES
ML12334A45121 November 2012SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response.Unanalyzed Condition
Fire Barrier
Internal Flooding
Hydrostatic
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML12326A34620 November 2012Initial Operator Licensing Written Examination Approval (Salem Generating Station, Units 1 and 2)
ML12353A45620 November 2012Final Written Examination with Answer Key (401-5 Format) (Folder 2)Missed surveillance
B.5.b Mitigating Strategies
Downpower
Coast down
ML12353A16020 November 2012NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)