Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110060026 | 30 December 2010 | 2010/12/30-Comment (27) of Harvey, on Nei'S Petition for Rulemaking PRM-26-5 Regarding 10 CFR Part 26, Fitness-for-Duty Programs. | |
RS-10-215, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11 | 29 December 2010 | Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11 | |
ML103270403 | 21 December 2010 | and Byron Station, Unit Nos. 1 and 2 - Issuance of Amendments Large Break Loss-of-Coolant Accident Analysis Using Astrum | Safe Shutdown Fire Protection Program |
ML103270435 | 21 December 2010 | Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum | |
RA-10-103, Cyber Security Plan RAI Response | 21 December 2010 | Cyber Security Plan RAI Response | Cyber Security |
ML103270445 | 21 December 2010 | Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum | |
TAC:ME5198 | 14 December 2010 | ||
RS-10-197, License Amendment Request to Revise Technical Specifications (TS) Sections 5.5.9, Steam Generator Program, and TS 5.6.9, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criteria | 14 December 2010 | License Amendment Request to Revise Technical Specifications (TS) Sections 5.5.9, Steam Generator Program, and TS 5.6.9, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criteria | Safe Shutdown Earthquake Nondestructive Examination Finite Element Analysis |
IR 05000456/2010009 | 26 November 2010 | Past operability Probabilistic Risk Assessment Significance Determination Process | |
ML103160506 | 19 November 2010 | PM Reassignment Ltr | |
RA-10-090, Submittal of Exelon Cyber Security Plan | 18 November 2010 | Submittal of Exelon Cyber Security Plan | Cyber Security |
IR 05000456/2010010 | 12 November 2010 | IR 05000456-10-010 & 05000457-10-010; 08/17/2010 - 09/30/2010; 11/12/2010; Braidwood Station, Units 1 & 2; Special Inspection for the August 16, 2010, Dual Unit Trip and Subsequent Equipment Issues | Shutdown Margin Past operability Temporary Modification Significance Determination Process Annual Radioactive Effluent Release Report Large early release frequency Annual Radiological Effluent Release Report |
ML103190426 | 8 November 2010 | Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000456/2010004 | 5 November 2010 | IR 05000456-10-004 & 05000457-10-004, on 07/01/2010 - 09/30/2010, Braidwood Station, Units 1 & 2, Temporary Plant Modifications; Surveillance Testing | Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Past operability Temporary Modification Locked High Radiation Area Significance Determination Process Process Control Program Fire Protection Program Scaffolding Operability Assessment |
ML103070239 | 3 November 2010 | Notice of Category 3 Public Meeting NRC Roundtable Discussion with NRC Commissioner William Magwood, IV | |
ML103060315 | 2 November 2010 | Technical Requirements Manual, Section 5.3, Special Reports. | |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |
IR 05000456/2010006 | 27 October 2010 | IR 05000456-10-006, 05000457-10-006 on 08/30/2010 - 09/17/2010, Braidwood Station, Units 1 and 2, Identification and Resolution of Problems | Condition Adverse to Quality Tornado Generated Missile Significance Determination Process Design basis earthquake Operability Determination Operability Assessment |
RS-10-163, Additional Information Supporting Request for License Amendment Regarding Large Break Loss-of-Coolant Accident Analysis Methodology | 25 October 2010 | Additional Information Supporting Request for License Amendment Regarding Large Break Loss-of-Coolant Accident Analysis Methodology | |
ML102950172 | 22 October 2010 | Core Operating Limits Report, Cycle 16 | Shutdown Margin |
ML102910182 | 21 October 2010 | Audit of the Licensee'S Management of Regulatory Commitments | Weld Overlay |
ML102950118 | 21 October 2010 | September 30, 2010, Summary of the Public Exit Meeting to Discuss the Preliminary Results from the Special Inspection Conducted at Braidwood Station | |
TAC:ME4035 | 21 October 2010 | ||
TAC:ME8470 | 15 October 2010 | ||
TAC:ME4815 | 14 October 2010 | ||
ML102861758 | 14 October 2010 | Notice of Forthcoming Public Meeting with Exelon Generation Company, LLC (EGC) (TAC Nos. ME4815, ME4816, ME4817, and ME4818), Braidwood & Byron, Proposed Measurement Uncertainty Recapture Power Uprate License Amendment Request | |
ML102780515 | 14 October 2010 | Withdrawal of License Amendment Request Related to Upper Cable Spreading Room Fire Protection Requirements | Fire Barrier Fire Protection Program |
ML102780660 | 13 October 2010 | Notice of Withdrawal of Application for Amendment to Facility Operating License | Fire Protection Program |
ML102780603 | 13 October 2010 | Withdrawal of License Amendment Request Related to Upper Cable Spreading Room Fire Protection Requirements | Fire Protection Program |
NRC-2010-0329, Braidwood, Units 1 and 2 and Byron, Units 1 and 2 - Notice of Withdrawal of Application for Amendment to Facility Operating License | 13 October 2010 | Braidwood, Units 1 and 2 and Byron, Units 1 and 2 - Notice of Withdrawal of Application for Amendment to Facility Operating License | Fire Protection Program |
ML102730456 | 8 October 2010 | Request for Additional Information (Rai), Related to Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds | |
ML102780239 | 4 October 2010 | Session 1 - Bill Buscher Presentation at October 4, 2010, Public Meeting on Groundwater Protection |