UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 21, 2010 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Braidwood Station, Units 1 and 2
SUBJECT:
SUMMARY
OF THE SEPTEMBER 30, 2010, PUBLIC EXIT MEETING TO DISCUSS THE PRELIMINARY RESULTS FROM THE SPECIAL INSPECTION CONDUCTED AT BRAIDWOOD STATION On September 30, 2010, the Nuclear Regulatory Commission (NRC) held a public exit meeting at the Braidwood City Hall in Braidwood, Illinois. The meeting was between NRC Region III management and Exelon Generation Company, LLC (Exelon) management to present the preliminary results of the NRC Special Inspection that was conducted onsite at Braidwood Station in response to the dual unit trip that occurred on August 16, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML102590093 and ML102730329, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the sequential unit trip. This was followed by a discussion of the NRC=s Special Inspection scope and preliminary results of the inspection. As part of this exit meeting, Exelon acknowledged and responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosure:
As Stated cc w/encl: Distribution via ListServ
Enclosure Meeting Participants NRC G. Shear, Acting Director, Division of Reactor Projects, Region III R. Skokowski, Chief, Plant Support Branch, Division of Reactor Safety, Region III J. Jandovitz, Project Engineer, Division of Reactor Projects, Region III (SIT Lead)
N. Féliz-Adorno, Reactor Inspector, Division of Reactor Safety, Region III (SIT Member)
M. Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects, Region III (SIT Member)
V. Mitlyng, Public Affairs Officer, Region III Exelon - Braidwood Station A. Shahkarami, Site Vice President L. Coyle, Plant Manager R. Gaston, Regulatory Assurance Manager J. Gerrity, Licensing Engineer R. Hall, Environmental Lead K. Lopykinski, Communications N. Miller, Outreach Manager P. Simpson, Licensing Manager Illinois Emergency Management Agency C. Settles, Section Head M. Perry, Resident Inspector
October 21, 2010 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Braidwood Station, Units 1 and 2
SUBJECT:
SUMMARY
OF THE SEPTEMBER 30, 2010, PUBLIC EXIT MEETING TO DISCUSS THE PRELIMINARY RESULTS FROM THE SPECIAL INSPECTION CONDUCTED AT BRAIDWOOD STATION On September 30, 2010, the Nuclear Regulatory Commission (NRC) held a public exit meeting at the Braidwood City Hall in Braidwood, Illinois. The meeting was between NRC Region III management and Exelon Generation Company, LLC (Exelon) management to present the preliminary results of the NRC Special Inspection that was conducted onsite at Braidwood Station in response to the dual unit trip that occurred on August 16, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML102590093 and ML102730329, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the sequential unit trip. This was followed by a discussion of the NRC=s Special Inspection scope and preliminary results of the inspection. As part of this exit meeting, Exelon acknowledged and responded to the NRC=s assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosure:
As Stated cc w/encl: Distribution via ListServ See Previous Concurrences DOCUMENT NAME: G:\\DRPIII\\BRAI\\Braidwood SIT Meeting Summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MThorpe-Kavanaugh:dtp*
EDuncan DATE 10/19/10 10/21/10 OFFICIAL RECORD COPY
Letter to Exelon Generation Company, LLC, from E. Duncan dated October 21, 2010.
SUBJECT:
SUMMARY
OF THE SEPTEMBER 30, 2010, PUBLIC EXIT MEETING TO DISCUSS THE PRELIMINARY RESULTS FROM THE SPECIAL INSPECTION CONDUCTED AT BRAIDWOOD STATION DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Daniel Merzke RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPreports Resource