Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
LR-N09-0027, Reactor Vessel Outlet Nozzle Dissimilar Metal Weld Flaw Evaluation (Fall 2008 Outage) | 31 December 2008 | Reactor Vessel Outlet Nozzle Dissimilar Metal Weld Flaw Evaluation (Fall 2008 Outage) | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Dissimilar Metal Weld |
SCH08-141, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, Salem Generating Station, NJPDES Permit NJ0005622 for November 2008 | 22 December 2008 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, Salem Generating Station, NJPDES Permit NJ0005622 for November 2008 | NJPDES |
ML082810219 | 18 December 2008 | Withdrawal of Request for Exemption from 10CFR 50.82(a)(8) to Use Decommissioning Trust Funds for Disposal of Major Radioactive Components | Exemption Request |
ML083300079 | 17 December 2008 | Request for Additional Information Regarding Generic Letter 2004-02 | Mission time |
ML110050433 | 16 December 2008 | Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | |
LR-N10-0355, Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | 16 December 2008 | Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | |
LR-N10-0355, Salem/Operations, S2.OP-AB.ANN-0001(Q), Rev. 22, Loss of Overhead Annunciator System. | 12 December 2008 | Salem/Operations, S2.OP-AB.ANN-0001(Q), Rev. 22, Loss of Overhead Annunciator System. | |
ML110060705 | 12 December 2008 | Salem/Operations, S2.OP-AB.ANN-0001(Q), Rev. 22, Loss of Overhead Annunciator System. | |
ML110060405 | 12 December 2008 | Salem/Operations, S1.OP-AB.ANN-0001(Q), Rev. 24, Loss of Overhead Annunciator System. | |
LR-N10-0355, Salem/Operations, S1.OP-AB.ANN-0001(Q), Rev. 24, Loss of Overhead Annunciator System. | 12 December 2008 | Salem/Operations, S1.OP-AB.ANN-0001(Q), Rev. 24, Loss of Overhead Annunciator System. | |
IR 05000272/2008008 | 11 December 2008 | IR 05000272-08-008, on 09/29/2008 - 10/27/2008; Salem Nuclear Generating Station Unit 1; Supplemental Inspection 95002 for Degraded Mitigating System Cornerstone | Probabilistic Risk Assessment Significance Determination Process |
SCH08-140, NJPDES Permit No. NJ0005622, NJDEP Case No. 081107100509 Follow Up Report | 9 December 2008 | NJPDES Permit No. NJ0005622, NJDEP Case No. 081107100509 Follow Up Report | NJPDES |
SCH08-135, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 2008 | 24 November 2008 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 2008 | NJPDES |
LR-N08-0249, Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection Equipment | 21 November 2008 | Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection Equipment | Mururoa |
ML110050560 | 21 November 2008 | Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | |
LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | 21 November 2008 | Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | |
LR-N08-0258, Withdrawal of Request for Exemption from 10 CFR 50.82 (a)(8) | 19 November 2008 | Withdrawal of Request for Exemption from 10 CFR 50.82 (a)(8) | Exemption Request |
SCH08-132, Quarterly Remedial Action Progress Report, Second Quarter 2008 PSEG Nuclear, LLC, Salem Generating Station | 18 November 2008 | Quarterly Remedial Action Progress Report, Second Quarter 2008 PSEG Nuclear, LLC, Salem Generating Station | Grab sample |
IR 05000272/2008201 | 13 November 2008 | ||
ML083040315 | 12 November 2008 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2-Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
IR 05000272/2008004 | 12 November 2008 | IR 05000272-08-004 & 05000311-08-004; on 07/01/2008 - 09/30/2008; Salem Nuclear Generating Station Unit Nos. 1 and 2; Routine Integrated Report | High Radiation Area Fire Barrier Internal Flooding Nondestructive Examination Operability Determination Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld Substantial potential for overexposure Overexposure |
IR 05000272/2008404 | 4 November 2008 | IR 05000272-08-404, 05000311-08-404 & 05000354-08-404; on 08/25/2008-09/26/2008; PSEG Nuclear LLC; Salem and Hope Creek Generating Stations, Problem Identification and Resolution Inspection | Significance Determination Process Affidavit |
LR-N08-0252, Core Operating Limits Report - Cycle 20 | 3 November 2008 | Core Operating Limits Report - Cycle 20 | |
IR 05000272/2008006 | 3 November 2008 | IR 05000272-08-006, IR 05000311-08-006, & IR 05000354-08-006, on 09/19/2008, Salem and Hope Creek Generating Stations (Letter Only) | B.5.b Mitigating Strategies |
LR-N08-0256, Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel. | 31 October 2008 | Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel. | |
ML110060487 | 31 October 2008 | Salem/Operations, S1.OP-AB.CW-0001(Q), Rev. 30, Circulation Water System Malfunction. | |
LR-N10-0355, Salem/Operations, S1.OP-AB.CW-0001(Q), Rev. 30, Circulation Water System Malfunction. | 31 October 2008 | Salem/Operations, S1.OP-AB.CW-0001(Q), Rev. 30, Circulation Water System Malfunction. | |
LR-N08-0247, Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action | 30 October 2008 | Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action | |
LR-N10-0355, Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | 29 October 2008 | Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | |
ML110060159 | 29 October 2008 | Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | |
ML110060485 | 24 October 2008 | Salem/Operations, S1.OP-AB.CONT-0001(Q), Rev. 13, Containment Closure. | |
LR-N10-0355, Salem/Operations, S1.OP-AB.CONT-0001(Q), Rev. 13, Containment Closure. | 24 October 2008 | Salem/Operations, S1.OP-AB.CONT-0001(Q), Rev. 13, Containment Closure. | |
SCH08-121, Transmittal of Discharge Monitoring Report for the Month of September 2008 | 24 October 2008 | Transmittal of Discharge Monitoring Report for the Month of September 2008 | NJPDES |
IR 05000272/2008301 | 24 October 2008 | IR 05000272-08-301, 05000311-08-301, on 08/25/08 - 09/04/08; Salem, Units 1 and 2; Initial Operator Licensing Examination Report | |
LR-N08-0238, Submittal of Emergency AC (EAC) Margin Commitments | 22 October 2008 | Submittal of Emergency AC (EAC) Margin Commitments | |
ML082970174 | 22 October 2008 | Draft Request for Additional Information, Upcoming Conference Call | Mururoa |
Press Release-I-08-057, NRC Sends Special Inspection Team to Salem Nuclear Plant in N. J | 21 October 2008 | Press Release-I-08-057: NRC Sends Special Inspection Team to Salem Nuclear Plant in N. J | |
ML082900159 | 16 October 2008 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Fire Barrier Temporary Modification Emergency Lighting Fire Protection Program |
NTD-08-074, Voluntary Response to NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operating Licensing Exams | 15 October 2008 | Voluntary Response to NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operating Licensing Exams | Generic Fundamentals Examination |
ML082760758 | 14 October 2008 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Audit of the Licensee'S Management of Regulatory Commitments | Safe Shutdown |
ML082970217 | 13 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | |
ML082550218 | 10 October 2008 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Stroke time Incorporated by reference Power Operated Valves |
ML082800266 | 6 October 2008 | MR-1-2008-0010 - Plant Management Change for PSEG | |
ML110060489 | 1 October 2008 | Salem/Operations, S1.OP-AB.FUEL-0001(Q), Rev. 4, Fuel Handling Incident. | |
LR-N10-0355, Salem/Operations, S1.OP-AB.FUEL-0001(Q), Rev. 4, Fuel Handling Incident. | 1 October 2008 | Salem/Operations, S1.OP-AB.FUEL-0001(Q), Rev. 4, Fuel Handling Incident. | |
ML110060717 | 1 October 2008 | Salem/Operations, S2.OP-AB.FUEL-0001(Q), Rev. 5, Fuel Handling Incident. | |
LR-N10-0355, Salem/Operations, S2.OP-AB.FUEL-0001(Q), Rev. 5, Fuel Handling Incident. | 1 October 2008 | Salem/Operations, S2.OP-AB.FUEL-0001(Q), Rev. 5, Fuel Handling Incident. |