PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 OCT 2008 0 PSEG LR-N08-0238 Nuclear LLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 1 and UNIT 2 FACILITY OPERATING LICENSE NOS. DPR 70 and DPR-75 NRC DOCKET NOS. 50-272 and 50-311
Subject:
SALEM EMERGENCY AC (EAC) MARGIN COMMITMENTS Salem Generator Station (Salem) personnel performed a root cause as a result of the 4Q07 Salem Unit I EAC Mitigating Systems Performance Index (MSPI)
YELLOW indicator. The analysis concluded that while the Salem EAC system currently meets all required licensing and regulatory requirements, modifications to decrease the risk significance contribution of the Emergency Diesel Generators (EDGs) would be prudent.
Our-preliminary engineering analysis shows that providing alternate auxiliary power source(s) to the 500kV switchyard controls and support systems will reduce the risk significance of the EDGs. PSEG will implement the modification by December 31, 2009.
Attachment I contains a list of commitments. Attachment 2 provides a list of milestones.
If you have any questions or require additional information, please do not hesitate to contact Mr. Justin Weame at (856) 339-1351.
Sincerely, Robert C. Braun Site Vice President Salem Generating Station Attachments (2) 95-2168 REV. 7/99
Document Control Desk 2
LR-N08-0238 OCT 2 2 2008 C
Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Project Manager - Salem Unit 1 and Unit 2 U. S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555-0001 USNRC Senior Resident Inspector - Salem Unit 1 and Unit 2 (X24)
Mr. P. Mulligan Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625
LR-N08-0238
SUMMARY
OF COMMITMENTS COMMITMENT TYPE COMMITMENT COMMITTED DATE OR ONE-TIME ACTION PROGRAMMATIC "OUTAGE" (YesINo)
(Yes/No)
PSEG Nuclear will implement 12/31/2009 Yes No physical improvements to the-facility that will result in an improvement in EAC system margin by December 31, 2009.
(CM-SC-2008-105)
LR-N08-0238 Milestones for EAC MSPI Margin Improvement Milestone Date Engineering Analysis Completed 4/30/2009 Parts Procured 6/15/2009 Procedures Revised 9/30/2009 Revised PRA Internal Events Model Approved 9/30/2009 Operations and Maintenance Trained 11/15/2009 MSPI Basis Document Updated to Reflect PRA Change 12/31/2009 Revised MSPI Basis reflected in CDE 12/31/2009