Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000254/2008006 | 29 December 2008 | IR 05000254-08-006 and IR 05000265-08-006, on 11/17/2008 - 11/21/2008, Quad Cities Nuclear Power Station, Units 1 and 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies - Cover Letter On | B.5.b |
PNO-III-08-013, A: Quad Cities Unit 2 Startup After Repairs to the Steam Piping Bellows Failure Inside of the Main Condenser - Update | 22 December 2008 | PNO-III-08-013A: Quad Cities Unit 2 Startup After Repairs to the Steam Piping Bellows Failure Inside of the Main Condenser - Update | |
ML083500579 | 15 December 2008 | PNO-III-08-013, Quad Cities, Unit 2 Shutdown Due to a Steam Piping Bellows Failure Inside of the Main Condenser | |
ML083510235 | 10 December 2008 | U.S. Dept of Homeland Security - Ltr. Transmitting a Copy of Final Report for 8/27/2008 Exercise & 10/9/2008 Out-of-Sequence Drills of the off-site Radiological Emergency Response Plans Site-specific to Quad Cities Nuclear Power Station | |
RS-08-155, Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5 | 9 December 2008 | Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5 | Safe Shutdown Battery sizing |
IR 05000254/2008007 | 5 December 2008 | IR 05000254-08-007, 05000265-08-007(DRS), on 09/22/2008 - 10/24/2008, Quad Cities Nuclear Power Station, Units 1 and 2, Component Design Bases Inspection (CDBI) | Safe Shutdown Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Design basis earthquake Operability Determination Battery sizing Earthquake Weak link |
ML083450161 | 4 December 2008 | GFE Annual Registration Letter - 2009 Examinations | Generic Fundamentals Examination |
ML083380618 | 3 December 2008 | Letter Quad Cities, Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000254-09-002 & 05000265-09-002 | Ultimate heat sink |
RS-08-154, Request to Partially Implement Subsequent Edition of ASME OM Code, Section ISTC-5222, Condition-Monitoring Program and Mandatory Appendix II, Check Valve Condition Monitoring Program. | 3 December 2008 | Request to Partially Implement Subsequent Edition of ASME OM Code, Section ISTC-5222, Condition-Monitoring Program and Mandatory Appendix II, Check Valve Condition Monitoring Program. | Incorporated by reference |
TAC:ME0201 | 3 December 2008 | ||
ML083310073 | 26 November 2008 | Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors | |
ML082820171 | 25 November 2008 | Relief Request No. RV-30G from Main Steam Electrometric Relief Valve 0203-3C Test Interval | |
RS-08-153, Registration of Use of Casks to Store Spent Fuel | 19 November 2008 | Registration of Use of Casks to Store Spent Fuel | |
ML083290358 | 17 November 2008 | U.S. Dept of Homeland Security - Letter Transmitting One Copy of the Final Report for the 8/27/2009 Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for the Quad Cities Nuclear Power Station | |
ML13130A082 | 14 November 2008 | FEMA Quad Cities Final Exercise Report, Exercise Date - August 27, 2008 | Nuclear Accident Reporting System |
ML082890184 | 14 November 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums | 13 November 2008 | Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000254/2008004 | 10 November 2008 | IR 05000254-08-004, 05000265-08-004; on 07/01/2008 - 09/30/2008; Quad Cities Nuclear Power Station, Units 1 & 2; Flooding, Maintenance Risk Assessment, and Emergent Work Control | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Internal Flooding Probabilistic Risk Assessment Temporary Modification Tornado-Generated Missile Significance Determination Process Scram Discharge Volume Fire Protection Program Incremental Core Damage Probability Deficit Downpower Operability Assessment |
ML083110593 | 7 November 2008 | Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review | Inattentive |
PNO-III-08-012, A - Quad Cities Notice of Unusual Event Due to Onsite Explosion - Update | 29 October 2008 | PNO-III-08-012A - Quad Cities Notice of Unusual Event Due to Onsite Explosion - Update | |
ML082900345 | 28 October 2008 | Request for Additional Information Related to Total Battery Resistance Technical Specification Change | Safe Shutdown |
ML083010098 | 27 October 2008 | PNO-III-08-012 - Quad Cities Notice of Unusual Event Due to Onsite Explosion | |
RS-08-137, Registration of Use of Casks to Store Spent Fuel | 23 October 2008 | Registration of Use of Casks to Store Spent Fuel | |
ML083030141 | 21 October 2008 | Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI | |
ML082970536 | 21 October 2008 | Site Specific Implementation of B5b Phase 2&3 Mitigating Strategies Temporary Instruction Inspection | B.5.b Mitigating Strategies |
RS-08-134, Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5 | 15 October 2008 | Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5 | |
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | 14 October 2008 | General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | Surveillance Frequency Control Program Generic Issues Program GOTHIC |
IR 05000254/2008404 | 9 October 2008 | IR 05000254-08-404, IR 05000265-08-404, on 09/08/2008 - 09/12/2008, Quad Cities, Routine Security Baseline Inspection - Cover Letter | |
ML082820273 | 7 October 2008 | Gfes Results September 2008 | Generic Fundamentals Examination |
ML082770034 | 7 October 2008 | Quad Cites Nuclear Power Station, Units 1 and 2 -Request for Additional Information Related to Total Battery Resistance Technical Specification Change | |
IR 05000254/2008502 | 3 October 2008 | IR 05000254-08-502, 05000265-08-502 on 08/25/2008 - 08/29/2008 for Quad Cities, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline Inspection | Significance Determination Process |
ML101740290 | 1 October 2008 | Ltr from R. Zuffa IEMA - Bureau of Nuclear Facility Safety, Inspection Report Quarterly Inspection Period: July 1 to September 30, 2008 | Safe Shutdown High winds High Radiation Area Fire Protection Program |