IR 05000254/200800629 December 2008IR 05000254-08-006 and IR 05000265-08-006, on 11/17/2008 - 11/21/2008, Quad Cities Nuclear Power Station, Units 1 and 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies - Cover Letter OnB.5.b
PNO-III-08-013, A: Quad Cities Unit 2 Startup After Repairs to the Steam Piping Bellows Failure Inside of the Main Condenser - Update22 December 2008PNO-III-08-013A: Quad Cities Unit 2 Startup After Repairs to the Steam Piping Bellows Failure Inside of the Main Condenser - Update
ML08350057915 December 2008PNO-III-08-013, Quad Cities, Unit 2 Shutdown Due to a Steam Piping Bellows Failure Inside of the Main Condenser
ML08351023510 December 2008U.S. Dept of Homeland Security - Ltr. Transmitting a Copy of Final Report for 8/27/2008 Exercise & 10/9/2008 Out-of-Sequence Drills of the off-site Radiological Emergency Response Plans Site-specific to Quad Cities Nuclear Power Station
RS-08-155, Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.59 December 2008Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5Safe Shutdown
Battery sizing
IR 05000254/20080075 December 2008IR 05000254-08-007, 05000265-08-007(DRS), on 09/22/2008 - 10/24/2008, Quad Cities Nuclear Power Station, Units 1 and 2, Component Design Bases Inspection (CDBI)Safe Shutdown
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Design basis earthquake
Operability Determination
Battery sizing
Earthquake
Weak link
ML0834501614 December 2008GFE Annual Registration Letter - 2009 ExaminationsGeneric Fundamentals Examination
ML0833806183 December 2008Letter Quad Cities, Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000254-09-002 & 05000265-09-002Ultimate heat sink
RS-08-154, Request to Partially Implement Subsequent Edition of ASME OM Code, Section ISTC-5222, Condition-Monitoring Program and Mandatory Appendix II, Check Valve Condition Monitoring Program.3 December 2008Request to Partially Implement Subsequent Edition of ASME OM Code, Section ISTC-5222, Condition-Monitoring Program and Mandatory Appendix II, Check Valve Condition Monitoring Program.Incorporated by reference
TAC:ME02013 December 2008
ML08331007326 November 2008Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
ML08282017125 November 2008Relief Request No. RV-30G from Main Steam Electrometric Relief Valve 0203-3C Test Interval
RS-08-153, Registration of Use of Casks to Store Spent Fuel19 November 2008Registration of Use of Casks to Store Spent Fuel
ML08329035817 November 2008U.S. Dept of Homeland Security - Letter Transmitting One Copy of the Final Report for the 8/27/2009 Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for the Quad Cities Nuclear Power Station
ML13130A08214 November 2008FEMA Quad Cities Final Exercise Report, Exercise Date - August 27, 2008Nuclear Accident Reporting System
ML08289018414 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums13 November 2008Annual Report - Guarantees of Payment of Deferred Premiums
IR 05000254/200800410 November 2008IR 05000254-08-004, 05000265-08-004; on 07/01/2008 - 09/30/2008; Quad Cities Nuclear Power Station, Units 1 & 2; Flooding, Maintenance Risk Assessment, and Emergent Work ControlSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Scram Discharge Volume
Fire Protection Program
Incremental Core Damage Probability Deficit
Downpower
Operability Assessment
ML0831105937 November 2008Notice of Closed Meeting to Exelon Generation Company for SCWE Survey ReviewInattentive
PNO-III-08-012, A - Quad Cities Notice of Unusual Event Due to Onsite Explosion - Update29 October 2008PNO-III-08-012A - Quad Cities Notice of Unusual Event Due to Onsite Explosion - Update
ML08290034528 October 2008Request for Additional Information Related to Total Battery Resistance Technical Specification ChangeSafe Shutdown
ML08301009827 October 2008PNO-III-08-012 - Quad Cities Notice of Unusual Event Due to Onsite Explosion
RS-08-137, Registration of Use of Casks to Store Spent Fuel23 October 2008Registration of Use of Casks to Store Spent Fuel
ML08303014121 October 2008Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI
ML08297053621 October 2008Site Specific Implementation of B5b Phase 2&3 Mitigating Strategies Temporary Instruction InspectionB.5.b Mitigating Strategies
RS-08-134, Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.515 October 2008Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-0114 October 2008General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01Surveillance Frequency Control Program
Generic Issues Program
GOTHIC
IR 05000254/20084049 October 2008IR 05000254-08-404, IR 05000265-08-404, on 09/08/2008 - 09/12/2008, Quad Cities, Routine Security Baseline Inspection - Cover Letter
ML0828202737 October 2008Gfes Results September 2008Generic Fundamentals Examination
ML0827700347 October 2008Quad Cites Nuclear Power Station, Units 1 and 2 -Request for Additional Information Related to Total Battery Resistance Technical Specification Change
IR 05000254/20085023 October 2008IR 05000254-08-502, 05000265-08-502 on 08/25/2008 - 08/29/2008 for Quad Cities, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline InspectionSignificance Determination Process
ML1017402901 October 2008Ltr from R. Zuffa IEMA - Bureau of Nuclear Facility Safety, Inspection Report Quarterly Inspection Period: July 1 to September 30, 2008Safe Shutdown
High winds
High Radiation Area
Fire Protection Program