MONTHYEARRS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-094, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements2022-07-25025 July 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station2022-05-25025 May 2022 Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station RS-22-059, CFR50.46 Annual Report2022-05-0404 May 2022 CFR50.46 Annual Report RS-22-056, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-054, Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval2022-04-13013 April 2022 Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-030, Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations 2024-01-03
[Table view] |
Text
Exelon Nuclear www.exeloncorp .com Exelon 4300 Winfield Road Nuclear Warrenville, IL 60555 RS-08-134 October 15, 2008 U . S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos . 50-254 and 50-265
Subject:
Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8 .4.5 References : 1. Letter from J . L . Hansen (Exelon Generation Company, LLC) to U. S.
NRC, "Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5," dated December 21, 2007
- 2. Letter from J. S . Wiebe (U . S. NRC) to C. G. Pardee (Exelon Generation Company, LLC), "Quad Cities Nuclear Power Station, Units 1 and 2 -
Request for Additional Information Related to License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications (TAC Nos. MD7539 and MD7540)," dated July 18, 2008
- 3. Letter from J. L. Hansen (Exelon Generation Company, LLC) to U. S.
NRC, "Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8 .4.5,"
dated August 14, 2008
- 4. Letter from J. S. Wiebe (U . S. NRC) to C. G . Pardee (Exelon Generation Company, LLC), "Quad Cities Nuclear Power Station, Units 1 and 2 -
Request for Additional Information Related to Total Battery Resistance Technical Specification Change (TAC Nos. MD7539 and MD7540)," dated October 7, 2008
October 15, 2008 U. S . Nuclear Regulatory Commission Page 2 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. The proposed change revises Technical Specification (TS)
Surveillance Requirements (SR) 3.8.4.2 and 3.8.4.5 to add an additional acceptance criterion to verify that the total battery connector resistance is within the pre-established limits that ensure the QCNPS safety-related batteries can perform their intended design function .
In Reference 2, the NRC requested additional information to complete its review . EGC provided a response to this request in Reference 3. In Reference 4, the NRC requested additional information to complete its review . In response to Reference 4, EGC is providing the attached information .
EGC has reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the NRC in Attachment 1 of Reference 1 . The information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration .
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Michelle Yun at (630) 657-2818 .
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of October 2008.
cc: NRC Senior Resident Inspector NRC Regional Administrator, Region III
Attachment:
Response to Request for Additional Information, Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria
ATTACHMENT Response to Request for Additional Information Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria NRC Request "in reviewing the Exelon Generation Company LLC's (Exelon's) submittal dated December 21, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073580004), and response to additional information dated August 14, 2008 (ADAMS Accession No . ML082280111), related to the request to establish total battery connector resistance acceptance criteria in technical specifications (TSs) surveillance requirements (SRs),
for the Quad Cities Nuclear Power Station, Units 1 and 2, the NRC staff has determined that the following information is needed in order to complete its review :
Title 10 of the Code of Federal Regulations (10 CFR), Section 50 .36(d)(2) requires TSs to include limiting conditions of operation (LCO), (the lowest functional capability or performance levels of equipment required for safe operation of the facility). Section 50 .36(d)(3) of 10 CFR, in part, requires TSs to include SRs to assure that the LCOs will be met.
In response to a non-cited violation that identified a non-conservative TS SR, Exelon submitted a request for amendment dated December 21,2007 (ADAMS Accession No. ML073580004) .
The proposed SR requires verification that total battery resistance is less than limits established to ensure performance of design function . The actual limits established are proposed to be included in the TS Bases, not in the TSs. The proposed TS Bases states that, 'Maintaining the resistance limits in Table B 3.8.4-1 ensures that the minimum required voltages of 105 VDC and 210 VDC for the 125 VDC and 250 VDC safety-related batteries, respectively, will not be exceeded under worst case accident conditions.'
Provide justification that demonstrates that the submittal meets the 10 CFR Section 50.36 requirements to include SRs in TSs to assure that the LCO of these batteries is met."
Response
10 CFR 50.36 requires Technical Specifications (TS) to include limiting conditions of operation (LCOs) for equipment required for the safe operation of the facility and Surveillance Requirements (SRs) to ensure those LCOs will be met.
In a December 21, 2007 license amendment request (LAR) for QCNPS, Exelon Generation Company, LLC (EGC) proposed to revise the existing SR 3.8.4.2 and 3.8 .4.5 to include an additional requirement to: "Verify total battery connector resistance is less than limits established to ensure performance of design function" whenever inter-cell connector resistance is tested . The intent of this LAR was to correct a non-conservative TS.
In response to an NRC Request for Additional Information concerning the LAR (Reference 1),
EGC stated that the existing inter-cell resistance acceptance criteria was based on industry experience as a threshold for identifying localized degradation so that issues that could potentially affect battery performance would be promptly identified and corrected. EGC also stated that the inter-cell connector resistance surveillance was not initially established for battery operability. However, the proposed expanded SRs (i.e., the combination of an inter-cell Page 1 of 3
ATTACHMENT Response to Request for Additional Information Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria resistance test and a total resistance test) would provide the necessary surveillance to ensure battery operability, thus ensuring the applicable LCOs are met. Therefore, the proposed SR complies with the requirements of 10 CFR 50.36(d)(3).
10 CFR 50.36 does not explicitly require inclusion of acceptance criteria in the TS SR . The stated definition of an SR in 10 CFR 50.36 is " . . .to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." With respect to the location and control of specific SR acceptance criteria, both NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4," and industry precedent provide multiple examples where specific SR acceptance criteria are defined and controlled by documents other than the TS (e.g ., TS Bases, the plant safety analysis, plant procedures, and the Updated Final Safety Analysis Report).
One example of this is NUREG-1433, TS 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)," SR 3.6.4 .2.2, which requires verification that the isolation times of power-operated, automatic SCIVs are "within limits ." The isolation time is the value assumed in the safety analysis, and the verification is required to demonstrate operability . Similarly, NUREG-1433, TS 3.7.5, "[Control Room Air Conditioning (AC)] System," SR 3.7.5.1 requires verification that each control room AC subsystem has the "capability to remove the assumed heat load ." As stated in the applicable TS Bases section, this acceptance criteria is the heat load that is assumed in the safety analysis . Finally, NUREG-1433, TS 3.8.4, "DC Sources - Operating," SR 3.8 .4 .3, as well as QCNPS SR 3.8.4 .7, requires verification that "battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test ." These values are typically located in and controlled by design calculations and the UFSAR, both of which are owner-controlled documents.
A specific industry example concerning acceptance criteria for battery resistance SRs is Point Beach Nuclear Plant (Point Beach) TS SRs 3.8.4.2 and 3.8.4.5 (Reference 2) . These Point Beach SRs are similar to the proposed QCNPS SRs in that the SRs do not delineate inter-cell or aggregate battery resistance acceptance criteria values, but instead require Point Beach to "verify battery connection resistance is within limits ." The applicable acceptance criteria are located within a surveillance test procedure that is controlled by the licensee .
There are also several examples within QCNPS TS where SRs require the verification of operability while the criteria for meeting this verification is maintained in the Bases. One example is SR 3.3.1 .1 .18 for the Reactor Protection System (RPS) Instrumentation, which requires verification that RIPS response times are "within limits ." The TS Bases for SR 3 .3 .1 .1 .18 indicate that the acceptance criteria for the SR is located in the Technical Requirements Manual, which is another licensee-controlled document.
In conclusion, it is EGC's position that the proposed TS SR satisfies 10 CFR 50.36(d)(3) and that the specific acceptance criteria for satisfying this additional surveillance should and will be appropriately located within the TS Bases. Any changes to the acceptance criteria will be controlled by TS 5 .5.10, "Technical Specifications (TS) Bases Control Program," and the 10 CFR 50.59 process.
ATTACHMENT Response to Request for Additional Information Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria References
- 1) Letter from J . L. Hansen (Exelon Generation Company, LLC) to U. S. NRC, "Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5," dated August 14, 2008
- 2) Point Beach Nuclear Plant, Unit 1 Technical Specifications (ML053110031) and Unit 2 Technical Specifications (ML053110034)