Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML083570296 | 22 December 2008 | NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009 | |
ML083570284 | 22 December 2008 | NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009 | |
ML083570264 | 22 December 2008 | NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009 | |
ML083570259 | 22 December 2008 | NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009 | |
ML083570241 | 22 December 2008 | NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009 | |
Press Release-08-228, NRC Meeting with Public Jan. 6 on Environmental Scoping for Comanche Peak New Reactor Application | 19 December 2008 | Press Release-08-228: NRC Meeting with Public Jan. 6 on Environmental Scoping for Comanche Peak New Reactor Application | Open House |
ML083510831 | 16 December 2008 | Notification of Inspection (NRC Inspection Report 05000445-09-002; 05000446-09-002) and Request for Information | |
CP-200801686, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request | 11 December 2008 | Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request | B.5.b Mitigating Strategies Fuel cladding |
CP-200801644, Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004) | 9 December 2008 | Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004) | |
ML083440686 | 8 December 2008 | Closure of Investigation (OI 4-2008-051) | |
ML083430502 | 8 December 2008 | CP-03-2009 - Initial Examination - Notification Letter | |
Press Release-08-219, NRC Accepts Application for New Reactors at Comanche Peak Site | 3 December 2008 | Press Release-08-219: NRC Accepts Application for New Reactors at Comanche Peak Site | |
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 | 26 November 2008 | Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 | |
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a | 26 November 2008 | Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a | Boric Acid Ultimate heat sink Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Temporary Modification Foreign Material Exclusion Hemyc Fuel cladding Scaffolding Backfit |
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 | 26 November 2008 | Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 | Coatings |
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 | 26 November 2008 | Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 | |
CP-200801606, Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter | 26 November 2008 | Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter | Coatings |
ML083500468 | 26 November 2008 | Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 | |
CP-200801606, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a | 26 November 2008 | Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a | Boric Acid Ultimate heat sink Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Temporary Modification Foreign Material Exclusion Hemyc Fuel cladding Scaffolding Backfit |
ML083500470 | 26 November 2008 | Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 | Coatings |
ML083500471 | 26 November 2008 | Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 | |
ML083500472 | 26 November 2008 | Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E | |
ML083500465 | 26 November 2008 | Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter | Coatings |
ML083120002 | 19 November 2008 | Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request | B.5.b Mitigating Strategies |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
CP-200801604, Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 11 November 2008 | Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | |
ML083050636 | 10 November 2008 | Request for Additional Information Relief Request P-2 for Inservice Testing Plan for Pumps and Valves | |
IR 05000445/2008004 | 5 November 2008 | IR 05000445-08-004 & 05000446-08-004; on 06/23 - 09/21/2008; Comanche Peak Steam Electric Station, Units 1 and 2: Integrated Resident and Regional Report; Fire Protection, Operability Evaluations, Plant Modifications, and Other Activities | Safe Shutdown Boric Acid High winds High Radiation Area Fire Barrier Met Tower Temporary Modification Locked High Radiation Area Significance Determination Process Operability Determination Fire Protection Program Fire Watch |
CP-200801523, Core Operating Limits Report | 28 October 2008 | Core Operating Limits Report | Shutdown Margin |
ML082940589 | 28 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
ML082940033 | 14 October 2008 | Comanche Peak - Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Hydrostatic |
ML082831613 | 8 October 2008 | Acceptance Review Email, Relief Request P-2 for Inservice Testing Plan for Pumps and Valves | |
ML082820423 | 7 October 2008 | Meeting Handout - Comanche Peak Col Application Public Orientation Meeting |