Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08357029622 December 2008NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
ML08357028422 December 2008NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
ML08357026422 December 2008NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
ML08357025922 December 2008NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
ML08357024122 December 2008NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
Press Release-08-228, NRC Meeting with Public Jan. 6 on Environmental Scoping for Comanche Peak New Reactor Application19 December 2008Press Release-08-228: NRC Meeting with Public Jan. 6 on Environmental Scoping for Comanche Peak New Reactor ApplicationOpen House
ML08351083116 December 2008Notification of Inspection (NRC Inspection Report 05000445-09-002; 05000446-09-002) and Request for Information
CP-200801686, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request11 December 2008Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment RequestB.5.b Mitigating Strategies
Fuel cladding
CP-200801644, Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004)9 December 2008Response to Request for Additional Information for Relief Request No. P-2, Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda, Second Interval Start August 3, 2004)
ML0834406868 December 2008Closure of Investigation (OI 4-2008-051)
ML0834305028 December 2008CP-03-2009 - Initial Examination - Notification Letter
Press Release-08-219, NRC Accepts Application for New Reactors at Comanche Peak Site3 December 2008Press Release-08-219: NRC Accepts Application for New Reactors at Comanche Peak Site
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 2026 November 2008Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a26 November 2008Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment aBoric Acid
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Temporary Modification
Foreign Material Exclusion
Hemyc
Fuel cladding
Scaffolding
Backfit
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 5726 November 2008Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57Coatings
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 9526 November 2008Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95
CP-200801606, Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter26 November 2008Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover LetterCoatings
ML08350046826 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20
CP-200801606, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a26 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment aBoric Acid
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Temporary Modification
Foreign Material Exclusion
Hemyc
Fuel cladding
Scaffolding
Backfit
ML08350047026 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57Coatings
ML08350047126 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95
ML08350047226 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E
ML08350046526 November 2008Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover LetterCoatings
ML08312000219 November 2008Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment RequestB.5.b Mitigating Strategies
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
CP-200801604, Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.11 November 2008Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML08305063610 November 2008Request for Additional Information Relief Request P-2 for Inservice Testing Plan for Pumps and Valves
IR 05000445/20080045 November 2008IR 05000445-08-004 & 05000446-08-004; on 06/23 - 09/21/2008; Comanche Peak Steam Electric Station, Units 1 and 2: Integrated Resident and Regional Report; Fire Protection, Operability Evaluations, Plant Modifications, and Other ActivitiesSafe Shutdown
Boric Acid
High winds
High Radiation Area
Fire Barrier
Met Tower
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Operability Determination
Fire Protection Program
Fire Watch
CP-200801523, Core Operating Limits Report28 October 2008Core Operating Limits ReportShutdown Margin
ML08294058928 October 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
ML08294003314 October 2008Comanche Peak - Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Hydrostatic
ML0828316138 October 2008Acceptance Review Email, Relief Request P-2 for Inservice Testing Plan for Pumps and Valves
ML0828204237 October 2008Meeting Handout - Comanche Peak Col Application Public Orientation Meeting