NRC Participation in the Comanche Peak Evaluated Exercise on April 7, 2009
ML083570241
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/22/2008
From: Linda Howell
Response Coordination Branch
To: Blevins M
Luminant Generation Co
Shared Package
ML083570233 List:
References
Download: ML083570241 (5)


Text

December 22, 2008 Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043

Subject:

NRC PARTICIPATION IN THE COMANCHE PEAK EVALUATED EXERCISE ON APRIL 7, 2009

Dear Mr. Blevins:

Each year, NRC Region IV participates in selected licensee exercises. This gives the NRC the opportunity to demonstrate its ability to interface with licensees as well as State and other Federal agencies. On April 7, 2009, Comanche Peak will conduct an exercise of its emergency plan. The NRC will participate in this exercise with staff at the following locations:

Region IV Incident Response Center, Arlington, TX NRC Heaquarters Operations Center, Rockville, MD Comanche Peak Emergency Operations Facility Comanche Peak Joint Information Center State of Texas Emergency Operations Center (if requested by the State)

We recognize that these exercises are very important to the licensee as well as offsite response organizations and that the success of the exercise depends heavily upon the coordination activities leading up to the exercise. We want to be sure that you are aware of our plans to participate, describe our typical coordination process, and identify potential training resources that you may want to consider.

The active portion of our exercise coordination process begins approximately 5 - 6 months prior to the exercise. During this time, our Emergency Response Coordinator schedules a meeting with the licensee to review the scenario/time line to incorporate anticipated NRC response activities and to tour licensee facilities to discuss NRC Site Team functional co-location needs.

This usually allows plenty of time for minor adjustments to be made without significant impact to the planning process.

UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

Mr. Mike Blevins Approximately 3 - 4 months prior to the exercise, NRC management schedules a meeting or conference call with offsite officials to discuss NRC participation/support. This ensures that the offsite officials are aware of NRCs participation in the exercise and potential impact on liaison resources during the exercise.

Approximately 1 - 2 months prior to the exercise, if requested by the licensee, our Emergency Response Coordinator conducts training on the NRC response process for licensee and offsite agencies. This training is typically held at the licensees site. This training includes general response training for exercise participants, communicator training for those positions that directly communicate with the NRC, and NRC control cell participant training.

Typically 1 - 2 months prior to the exercise, the licensee conducts a dress rehearsal. If requested by the licensee or state, the NRC will participate in the dress rehearsal with two to three people. Because of the budget impact, a formal request for NRC participation in the dress rehearsal must be made. You should direct this request to my attention. Where possible, we try to conduct the response training and dress rehearsal participation during the same trip.

The NRC is often asked to provide specialized training to support the exercise. Examples of specialized training includes:

Damage assessment training using the NRC Response Technical Manual Dose projection training using the NRC RASCAL code Instruction on the use of the Emergency Response Data System.

When possible, we will try to provide this training based on instructor availability. Because of the budget impact, a formal request for this training should be directed to me.

We look forward to working with you on this exercise. If you have questions regarding NRCs participation, exercise coordination, or specialized training, please contact Tom Andrews, Senior Emergency Response Coordinator at 817.860.8233.

Sincerely,

/RA/

Linda L. Howell, Chief Response Coordination Branch cc:

Fred W. Madden, Director, Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043

Mr. Mike Blevins Timothy P. Matthews, Esq.

Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation, Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711

Mr. Mike Blevins Lisa Hammond, Chief Technological Hazards Branch FEMA, Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698 Jack Colley, Chief Governor's Division of Emergency Management Texas Department of Public Safety Box 4087 Austin, TX 78773-0223 The Honorable Judge Walter Maynard Somervell County Courthouse P.O. Box 851 Glen Rose, TX 76043 The Honorable Judge Andy Rash Hood County Courthouse Room 7 Granbury, TX 76048

Mr. Mike Blevins Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Branch Chief, DRP/A (Claude.Johnson@nrc.gov)

Senior Project Engineer, DRP/A (Thomas.Farnholtz@nrc.gov)

CP Site Secretary (Sue.Sanner@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Douglas.Bollock@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

SUNSI Review Completed: _JES_

ADAMS: Yes No Initials: _JES_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive DOCUMENT NAME: s:\\erc\\rcb\\2009 Exercises\\2009-04 Comanche Peak PPX - Blevins.doc RIV:ERC ERC SERC SLO C:RCB JEStaub BSAlferink THAndrews WAMaier LLHowell

/RA/

/RA/

/RA/

/RA/

/RA/

12/08/08 12/10/08 12/22/08 12/11/08 12/22/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax